Laserfiche WebLink
IN (F) OUT (F) <br />GWH-2 ROOF 32"W x 54"D x 70"H 60 140 16 120 1 800 N/A 23.6 760 INTELLIHOT iQ751, Gen II <br />GWH-3 ROOF 32"W x 54"D x 70"H 60 140 16 120 1 800 N/A 23.6 760 INTELLIHOT iQ751, Gen II <br />GWH-1 ROOF 32"W x 54"D x 70"H 60 140 16 120 1 800 N/A 23.6 760 INTELLIHOT iQ751, Gen II CSA CERTIFIED, RATED FOR OUTDOOR INSTALLATION, WITH MAINTENANCE-FREE POWERED <br />ANODE, 120V FOR CONTROLS, IGNITER AND BLOWER, POWER DIRECT VENTING, REMOTE <br />MONITORING, LEAK DETECTION AND FAULT ALERT, FLAME ROD, THERMAL FUSE, OVERHEAT <br />PREVENTION DEVICE, FAN SPEED MONITOR, FLUE TEMPERATURE MONITOR, BLOCKED VENT <br />DETECTOR, DUAL FLAME SENSING, CONDENSATE NEUTRALIZATION KIT, ALARM BELL, COMPLETE <br />WITH ALL OPTIONS AND ACCESSORIES FOR OPTIMUM PERFORMANCE. PROVIDE WITH <br />APPROVED SEISMIC RESTRAINT, WEATHER-PROOF FLUE CAP, AND 6"H HOUSEKEEPING PAD. <br />COORD. ELECTRICAL REQUIREMENTS WITH ELECT. CONTR. INSTALL PER MFR'S <br />RECOMMENDATIONS. COORDINATE STATUS MONITORING WITH BMS CONTRACTOR. <br />GAS WATER HEATER SCHEDULE (RES. BLDG.) <br />NOTES: <br />1. INSTALL ALL UNITS PER MANUFACTURER'S RECOMMENDATIONS. <br />2. PROVIDE APPROVED SEISMIC BRACING, 6"H HOUSE-KEEPING PAD. <br />3. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO START OF WORK. <br />4. COORDINATE BMS MONITORING WITH BMS CONTRACTOR PRIOR TO START OF WORK. <br />5. PROVIDE LISTED MANUFACTURER OR EQUAL. <br />MARK NO. LOCATION DIMENSIONS <br />TEMPERATURE <br />KW FLA VOLT PHASE OP. WT. <br />(LBS) <br />STORAGE CAP <br />(GAL) <br />RECOVERY <br />RATE AT 60 <br />DEG-F RISE <br />(GPH) <br />GAS INPUT <br />(CFH)MAKE MODEL REMARKS <br />EWH-L06 <br />ZONED HOT WATER <br />REHEAT WATER <br />HEATERS <br />LEVEL-06 20"DIA. x38"H 100 140 9 11 460 3 450 30 62 BRADFORD <br />WHITE <br />MODEL # <br />30A-30-3 <br />NOTES: <br />1. INSTALL ALL UNITS PER MANUFACTURER'S RECOMMENDATIONS. <br />2. PROVIDE APPROVED SEISMIC BRACING, 6"H HOUSE-KEEPING PAD. <br />3. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO START OF WORK. <br />4. COORDINATE BMS MONITORING WITH BMS CONTRACTOR PRIOR TO START OF WORK. <br />5. PROVIDE LISTED MANUFACTURER OR EQUAL. <br />IWH-1 <br />TANKLESS <br />INSTANTANEOUS <br />WATER HEATER <br />FOR L-1 <br />LEVEL-01 6-1/4"H x 9-5/8" x 2-3/4” 60 104 5.6 - 277 1 8 - - CHRONOMITE SR-20L/277 SERVING SINGLE LAVATORY, TANKLESS, UL LISTED, PROVIDE WITH APPROVED SEISMIC <br />RESTRAINT, RUGGED STEEL HOUSING. <br />IWH-2 <br />TANKLESS <br />INSTANTANEOUS <br />WATER HEATER <br />FOR MS-1 <br />LEVEL-01 6-1/4"H x 17-1/4" x 2-3/4" 60 120 8.3 - 277 1 8 - - CHRONOMITE M-30L/277 SERVING JANITOR'S FAUCET. TANKLESS, UL LISTED, PROVIDE WITH APPROVED SEISMIC <br />RESTRAINT, RUGGED STEEL HOUSING. <br />IN (F) OUT (F) <br />EWH-L14 <br />ZONED HOT WATER <br />REHEAT WATER <br />HEATERS <br />LEVEL-15 20"DIA. x38"H 100 140 9 11 460 3 450 30 62 BRADFORD <br />WHITE <br />MODEL # <br />30A-30-3 CSA CERTIFIED, REMOTE MONITORING, LEAK DETECTION AND FAULT ALERT, COMPLETE WITH ALL <br />OPTIONS AND ACCESSORIES FOR OPTIMUM PERFORMANCE. PROVIDE WITH APPROVED SEISMIC <br />RESTRAINT. COORD. ELECTRICAL REQUIREMENTS WITH ELECT. CONTR. INSTALL PER MFR'S <br />RECOMMENDATIONS. COORDINATE STATUS MONITORING WITH BMS CONTRACTOR. <br />ELECTRIC WATER HEATER SCHEDULE (RES. BLDG.) <br />MARK NO. DESCRIPTION LOCATION DIMENSIONS <br />TEMPERATURE <br />KW FLA VOLT PHASE OP. WT. <br />(LBS) <br />STORAGE CAP <br />(GAL) <br />RECOVERY <br />RATE AT 60 <br />DEG-F RISE <br />(GPH) <br />MAKE MODEL REMARKS <br />HP KW RPM VOLTS PHASE <br />DWBP-1 <br />DOM. WATER <br />TRIPLEX <br />BOOSTER PUMPS <br />1 LOT ---BSMT P1 60 HP (20 <br />HP EA.)3500 460 3PH 522 GPM <br />TOTAL 156 PSIG SYNCRO <br />FLO <br />65TG20XXX-6V-XX- <br />SWF55-1 <br />SYNCROFLO IRONHEART, ANSI/NSF STANDARD 61 ANNEX G CERTIFIED, ULQCZJ.E189340 LISTED, IN STRICT COMPLIANCE WITH LOS <br />ANGELES MECHANICAL TESTING LABORATORY RR4682. THE PACKAGE SYSTEM SHALL BE THE PRODUCT OF A SINGLE <br />MANUFACTURER, CONSISTING OF STAINLESS STEEL VERTICAL MULTISTAGE PUMPS, SKID-MOUNTED WITH 304 STAINLESS STEEL <br />MANIFOLDS, BUTTERFLY AND WAFER CHECK VALVES; ALL BRANCH AND HEADER CONNECTIONS SHALL BE FLANGED OR WELDED, <br />SECURED WITH ADEQUATE BRACING AND SUPPORTS, SUCTION & SYSTEM DISCHARGE DIGITAL PRESSURE TRANSDUCERS. NEMA <br />12 CONTROL PANEL WITH MAIN NON-FUSED DISCONNECT, TOUCH SAFE, RATED FUSES FOR EACH VFD, PROGRAMMABLE LOGIC <br />CONTROLLER (PLC) BASED OPERATION, SEQUENCING BY HORSEPOWER AND/OR PRESSURE-VFD SPEED PROGRAMMING, <br />CUSTOMER ACCESSIBLE DATA AND FAULT LOGS, DISCRETE VARIABLE FREQUENCY DRIVES, ENCLOSURE-MOUNTED, ALARM HORN, <br />5.7" HDMI COLOR TOUCHSCREEN WITH REMOVABLE MEMORY CARD AND DATA PORT, MINIMUM 10,000 AMP SCCR RATING, <br />VENTILATED AND FAN-COOLED ENCLOSURE WITH POSITIVE CABINET PRESSURE. SYSTEM STARTUP BY FACTORY AUTHORIZED <br />SERVICE AGENT. PROVIDE FIELD-MOUNTED ASME HYDROPNEUMATIC TANK 106 GAL 300 PSIG ASME TO BE LOCATED ON THE ROOF <br />EQUAL TO WESSELS MODEL FXA-400-HP. COORDINATE BMS MONITORING WITH BMS CONTRACTOR. PROVIDE 6"H CONCRETE <br />HOUSEKEEPING PAD AND SEISMIC BRACING AS REQUIRED. <br />BOOSTER PUMP SCHEDULE (RES. BLDG.) <br />NOTES: <br />1. INSTALL ALL UNITS PER MANUFACTURER'S RECOMMENDATIONS. <br />2. PROVIDE APPROVED SEISMIC BRACING, 6"H HOUSE-KEEPING PAD. <br />3. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL CONTRACTOR PRIOR TO START OF WORK. <br />4. COORDINATE BMS MONITORING WITH BMS CONTRACTOR PRIOR TO START OF WORK. <br />5. PROVIDE LISTED MANUFACTURER OR EQUAL. <br />MARK NO. DESCRIPTION QTY.ON <br />EMERG.LOCATION <br />MOTOR DATA CAPACITY <br />(GPM) <br />HEAD <br />EXTERNAL (PSI) <br />OP. WT. <br />(LBS)MAKE MODEL REMARKS <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2015 <br />NOT FOR <br />CONSTRUCTION <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />Job No.: <br />Contact: <br />www.glumac.com <br />18200 Von Karman Ave., Suite 100 <br />Irvine, CA 92612 <br />T. 949.833.8190 <br />12" = 1'-0" <br />6/12/2024 7:39:09 PM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/3RD-B_MEP_WEST_R20.rvt <br />R1-P0.3 <br />PLUMBING SCHEDULES <br />21US00608 <br />3rd & Broadway West <br />1103 North Broadway <br />Santa Ana, CA 92701 <br />21US00608 <br />TG <br />1 9/21/2021 REISSUE FOR PLAN CHECK <br />2 01/18/2022 REISSUE FOR PLAN CHECK <br />4 06/17/2024 REVISION TO PERMIT <br />4 <br />EOR: SEAN AGUON <br />LIC#: M41274 <br />10/11/2024