Laserfiche WebLink
SCALE: NONE <br />SCALE: NONE <br />SCALE: NONE SCALE: NONE <br />SCALE: NONE <br />SCALE: NONESCALE: NONE <br />SCALE: NONE <br />1 PRV RISER STATION PIPING DIAGRAM <br />6 GREASE INTERCEPTOR DETAIL <br />5 BALANCING VALVE PIPING DETAIL 2 GAS WATER HEATER PIPING DIAGRAM <br />3 DOMESTIC HOT WATER CIRCULATION PUMP <br />4 DUPLEX CIRCULATING PUMPS PIPING DIAGRAM7PLANTER DRAIN DETAIL <br />8 L11-L15 REHEAT STATION PIPING DIAGRAM <br />4"GREASE WASTE <br />4"SEWER <br />3"VENT <br />CLEANOUT TO GRADE <br />RUNNING TRAP <br />C.I. COVER AND FRAME (TYP) <br />TRAFFIC RATED, GAS TIGHT <br />12"H <br />24"x24"x12"H <br />SAMPLING BOX <br />GREASE INTERCEPTOR <br />MIN. 12" <br />- LIQUID CAPACITY: SEE PLUMBING SCHEDULE. <br />- TANK DESIGNED FOR H-20 TRAFFIC WHEEL LOAD WITH DRY SOIL CONDITIONS (WATER TABLE <br />BELOW TANK) EARTH COVER OVER TANK NOT TO EXCEED 6 FT. <br />- SUITABLE NATIVE OR SUB-BASE SHALL BE PREPARED TO HANDLE ANTICIPATED LOADS. THE <br />EXCAVATION SHALL BE BEDDED WITH SUITABLE GRANULAR MATERIAL AND SHALL BE COMPACTED <br />TO 90% MAXIMUM DRY DENSITY, OR TO REQUIREMENTS OF THE PROJECT GEOTECHNICAL <br />ENGINEER. <br />- FOR COMPLETE DESIGN AND PRODUCT INFORMATION CONTACT JENSEN PRECAST. <br />- MINIMUM EXCAVATION SIZE: SEE MANUFACTURER'S RECOMMENDATIONS. <br />TOP VIEW <br />(COVERS & RISERS REMOVED) <br />SIDE VIEW <br />(CUTAWAY) <br />24" <br />INLET <br />INVERT <br />OUTLET <br />INVERT <br />GRADE OR SLAB ON GRADE <br />BALANCING VALVE (BLV) <br />UNION/FLANGE (TYP) <br />APPROVED SHUT-OFF <br />VALVE (TYP) <br />APPROVED Y-STRAINER <br />DETAIL NOTES : <br />1. BALANCING VALVE ASSEMBLY SHALL BE IN ACCESSIBLE LOCATION. PROVIDE <br />APPROVED ACCESS DOOR AS <br />REQUIRED. <br />DOMESTIC HOT WATER <br />RETURN LINE <br />NOTES: <br />1. INSULATE ALL FITTINGS, VALVES, CHECK VALVE, PIPE AND PUMP BODY. EXTEND MEASUREMENT PORT TO EXTERIOR OF INSULATION. <br />2. CIRCULATION BOOSTER PUMP SHALL BE LEAD-FREE CONSTRUCTION. <br />3. PROGRAMMABLE CONTROLLER SHALL BE SET TO ALLOW PUMP OPERATION ONLY DURING OCCUPIED HOURS. <br />4. AQUASTAT CONTROLLER SHALL BE SET TO DISENGAGE THE PUMP WHEN THE RETURN WATER TEMPERATURE IS ABOVE 125 DEGREES F <br />(ADJUSTABLE) OR AS ALLOWED BY LOCAL ENERGY <br />CODE.5. PROVIDE AUTOMATIC AIR VENT AS REQUIRED BY LOCAL ENERGY CODE TO REDUCE CAVITATION. ROUTE DRAIN LINE TO APPROVED <br />DRAINAGE RECEPTOR. INSTALL AIR VENT WITHIN 48" OF PUMP <br />INLET.6. PROVIDE HOSE BIBB AS REQUIRED BY LOCAL ENERGY CODE FOR MAINTENANCE AIR BLEEDING AND PRIMING. <br />HOT WATER <br />RETURN TO <br />WATER HEATER OR HEAT <br />EXCHANGER <br />1/4" TUBING <br />ROUTED TO <br />APPROVED <br />RECEPTOR <br />AQUASTAT BULB IN <br />THERMOWELL <br />PRESSURE AND TEMPERATURE TEST TAP <br />(TYP) <br />CAPILLARY <br />ELECTRONIC <br />PROGRAMMABLE <br />CONTROLLER <br />CROSS FITTING <br />AUTOMATIC AIR VENT ON 6" <br />STEM AT HIGH POINT <br />120 V POWER <br />AQUASTAT <br />CONTROLLER <br />SWING CHECK VALVE <br />PUMP <br />BALL VALVE (TYP) <br />DRAIN VALVE WITH HOSE <br />BIBB THREADS AND CAP <br />DOMESTIC HOT WATER <br />CIRCULATION RETURN FROM <br />BUILDING <br />1,2 <br />CP <br />TIME CLOCK 7-DAY PROGRAM <br />TORK OR PARAGON <br />AQUASTAT <br />CIRCUIT BREAKER <br />BY DIV. 26 <br />110V-1∅-60HZ <br />ADJUSTABLE AQUASTAT (TYP) <br />7-DAY/24HR TIME CLOCK <br />MANUAL PUMP SELECTOR SWITCH <br />THERMOMETER <br />ONON <br />PUMP DISCONNECT <br />CP <br />1 <br />CP <br />2 <br />HEADER <br />HEADER <br />SOV <br />CHECK VALVE <br />N.C. <br />N.C.(STAND-BY) <br />NOTES: <br />1. PROVIDE WEATHER-PROOF ENCLOSURE WHEN INSTALLED ON ROOF. <br />EWH <br />- <br />CP <br />- <br />CW <br />HW(140F) <br />HW(125F) <br />HWC <br />HW(120F) <br />CW <br />CW <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 7 <br />8 <br />9 <br />10 <br />11 <br />12 13 <br />14 <br />1516 <br />ET <br />- <br />17 <br />KEYED NOTES : <br />1. FLOOR SINK WITH ELECTRONIC TRAP PRIMER. <br />2. PRESSURE REDUCING VALVE SEE VALVE SCHEDULE. <br />3. PRESSURE GAUGE. <br />4. Y-STRAINER. <br />5. BALL VALVE. <br />6. THERMOMETER. <br />7. SUB-METER HOT/COLD AT EACH DWELLING UNIT. <br />8. CIRCUIT SOLVER THERMOSTATIC BALANCING VALVE. <br />9. EXPANSION TANK, SEE EQUIPMENT SCHEDULE. <br />10. THERMOSTATIC MIXING VALVE SET AT 125 DEG-F, SEE VALVE SCHEDULE. <br />11. T&P SAFETY VALVE WITH FULL SIZED DRAIN TO FLOOR SINK. <br />12. CHECK VALVE. <br />13. AQUASTAT PUMP CONTROL SET AT 120/125 DEG-F PUMP ON/OFF. <br />14. FLEXIBLE STAINLESS STEEL PIPING CONNECTION. <br />15. HOSE BIBB. <br />16. ELECTRIC WATER HEATER, SEE WATER HEATER SCHEDULE. <br />17. CIRCULATING PUMP, SEE EQUIPMENT SCHEDULE. <br />18. AUTOMATIC AIR VENT, TERMINATE DRAIN TO APPROVED RECEPTOR. <br />19. HW SUPPLY AT HIGHEST LEVEL OF EACH PRESS. ZONE. <br />20. HWC AT LOWEST LEVEL OF EACH PRESS. ZONE. <br />- <br />AAV <br />AAV <br />18 19 <br />20 <br />AAV <br />AAV <br />HWC(120F) FROM BLDG <br />SCW SUPPLY, SEE <br />HW(140F) TO BLDG. <br />MPG SUPPLY <br />GAS PRESS. REGULATING <br />VALVE <br />GAS SOV <br />PRESS. GAUGE <br />G(LP) <br />3,4 <br />R1-P9.4 <br />GPRV <br />1 <br />PRV <br />- <br />CP <br />1,2 <br />ET <br />1 <br />GWH <br />1 <br />GWH <br />2 <br />GWH <br />3 <br />P&T SAFETY VALVE <br />THERMOMETER AUTO AIR VENT <br />CHECK VALVE <br />6"H HOUSEKEEPING PAD <br />PLANTER DRAIN WITH HEAVY <br />SS SCREEN AND FILTER <br />FABRIC SIMILAR TO <br />SMITH 2671 <br />3"SD, SEE <br />PLANS FOR CONT. <br />SHRUB <br />12"x12"x12" GRAVEL <br />COORD. WITH WATER-PROOFING <br />CONTRACTOR <br />PLANTER BOX/ <br />TREE WELL <br />1 <br />R1-P9.5 <br />EWH <br />- <br />CP <br />- <br />CW <br />HW(140F) <br />HW(125F) <br />HWC <br />HW(120F) <br />CW <br />CW <br />1 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 13 <br />14 <br />1516 <br />ET <br />- <br />17 <br />KEYED NOTES : <br />1. DRAIN TO MOP SINK. <br />2. PROVIDE STRUCTURAL SUPPORTS AND DRAIN PAN FOR WATER HEATER. <br />3. PRESSURE GAUGE. <br />4. Y-STRAINER. <br />5. BALL VALVE. <br />6. THERMOMETER. <br />7. SUB-METER HOT/COLD AT EACH DWELLING UNIT. <br />8. CIRCUIT SOLVER THERMOSTATIC BALANCING VALVE. <br />9. EXPANSION TANK, SEE EQUIPMENT SCHEDULE. <br />10. THERMOSTATIC MIXING VALVE SET AT 125 DEG-F, SEE VALVE SCHEDULE. <br />11. T&P SAFETY VALVE WITH FULL SIZED DRAIN TO FLOOR SINK. <br />12. CHECK VALVE. <br />13. AQUASTAT PUMP CONTROL SET AT 120/125 DEG-F PUMP ON/OFF. <br />14. FLEXIBLE STAINLESS STEEL PIPING CONNECTION. <br />15. HOSE BIBB. <br />16. ELECTRIC WATER HEATER, SEE WATER HEATER SCHEDULE. <br />17. CIRCULATING PUMP, SEE EQUIPMENT SCHEDULE. <br />18. AUTOMATIC AIR VENT, TERMINATE DRAIN TO APPROVED RECEPTOR. <br />19. HW SUPPLY AT HIGHEST LEVEL OF EACH PRESS. ZONE. <br />20. HWC AT LOWEST LEVEL OF EACH PRESS. ZONE. <br />- <br />AAV <br />AAV <br />18 19 <br />202 <br />3 <br />4 <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2015 <br />NOT FOR <br />CONSTRUCTION <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />Job No.: <br />Contact: <br />www.glumac.com <br />18200 Von Karman Ave., Suite 100 <br />Irvine, CA 92612 <br />T. 949.833.8190 <br />6/12/2024 7:40:14 PM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/3RD-B_MEP_WEST_R20.rvt <br />R1-P9.4 <br />PLUMBING DETAILS <br />21US00608 <br />3rd & Broadway West <br />1103 North Broadway <br />Santa Ana, CA 92701 <br />21US00608 <br />TG <br />1 9/21/2021 REISSUE FOR PLAN CHECK <br />2 01/18/2022 REISSUE FOR PLAN CHECK <br />4 06/17/2024 REVISION TO PERMIT <br />4 <br />EOR: SEAN AGUON <br />LIC#: M4127410/11/2024