Laserfiche WebLink
R14R15R16 <br />RF <br />RG <br />F-01 F-01 F-01 EM <br />F-01 EM F-01 F-01 <br />F-01 F-01 F-01 <br />F-01 EM F-01 F-01 EM <br />F02 <br />F04 <br />F-01 F-01 <br />F-01 F-01 <br />F-01 F-01 <br />F-01 F-01 <br />BUSINESS CENTER <br />R06G16 <br />CONFERENCE <br />R06F16 <br />CONFERENCE <br />R06F15 <br />MULTI FUCTION SPACE <br />R06G14 <br />F02 <br />F-01 <br />F-01 EM <br />F-01 <br />F-01 <br />F-01 <br />F-01 <br />F-01 EM <br />F-01 <br />F-01 EM <br />F04 <br />NORMAL LTG - PANEL H6-21EM <br />LTG - PANEL E1H7-11 <br />D <br />fgh <br />OS <br />fgh <br />D cde <br />OS <br />fgh <br />f f f <br />f f f <br />f f f <br />h <br />g <br />c c c <br />c c c <br />c c c <br />c c c <br />d <br />OS <br />cde <br />OS <br />cde <br />OS <br />cde <br />OS <br />cde <br />OS <br />cde <br />OS <br />cde <br />D <br />k <br />os <br />D <br />j <br />k jkj <br />kk jj <br />PC <br />1 <br />PC <br />2 <br />e X2X2 <br />R16 <br />RH <br />RJ <br />F02 <br />F-01 <br />F-01 EM F-01 <br />F-01 EM <br />F-01 EM <br />F-01 EM <br />F-01 F-01 <br />F-01 <br />F-01 <br />GAME <br />ROOM <br />R06H16 <br />NORMAL LTG - PANEL H6-21EM <br />LTG - PANEL E1H7-11 <br />PCPC <br />OS <br />X2 <br />21 <br />D <br />ab <br />ab <br />X2 <br />OS <br />ab <br />OS <br />ab <br />D <br />ab <br />a <br />b <br />a <br />a a <br />a a <br />a a <br />a a <br /> 1/4" = 1'-0" <br />R2.E6.16 <br />A. <br />B. <br />C. <br />D. <br />E. <br />COORDINATE LOCATION OF LIGHTING CONTROLS WITH ARCHITECT AND <br />OWNER PRIOR TO INSTALL. <br />COORDINATE EXACT LUMINAIRE FIXTURE PLACEMENTS WITH <br />ARCHITECT PRIOR TO INSTALL. <br />CEILING SENSOR SWITCHES IN SAME SPACE WITH SAME SWITCH <br />DESIGNATION ARE TO BE WIRED IN PARALLEL SUCH THAT EITHER <br />SENSOR WILL ACTIVATE ALL DESIGNATED LIGHTS. <br />SWITCHES SERVING SAME AREA AS OCCUPANCY SENSOR SHALL <br />PROVIDE MANUAL OFF CONTROL OF LIGHTING. <br />CONTRACTOR IS RESPONSIBLE TO REVIEW ARCHITECTURAL <br />DRAWINGS TO CONFIRM CEILING TYPES IN ALL ROOMS (ACCESSIBLE, <br />EXPOSED, OR HARD) AND TO USE THE APPROPRIATE WIRING METHOD <br />FOR EACH TYPE. INSURE ALL J-BOXES ARE ACCESSIBLE AFTER ALL <br />OTHER TRADE'S WORK IS COMPLETED. DO NOT LOCATED ANY J-BOXES <br />E. <br />F. <br />G. <br />H. <br />(CONT'D) ON HARD CEILINGS UNLESS OTHERWISE NOTED; ALL WIRING <br />MUST BE ACCESSIBLE THROUGH LUMINAIRE ONLY IN DAISY-CHAIN <br />METHOD OR WITH DEDICATED HOME RUNS TO EACH LUMINAIRE. J- <br />BOXES MAY BE LOCATED ABOVE OTHER TRADE'S ACCESS DOORS IF <br />FEASIBLE AND DOES NOT INTERFERE WITH ACCESS. <br />ALL LOW VOLTAGE CABLING TO LIGHTING FIXTURES AND CONTROL <br />DEVICES SHALL BE PLENUM RATED. <br />CONTRACTOR SHALL CONFIRM ALL EXIT SIGN LOCATIONS AND <br />DIRECTIONAL CHEVRONS WITH THE ARCHITECTURAL EGRESS PLANS <br />AND REFLECTED CEILING PLANS. <br />ELECTRICAL CONTRACTOR TO PROVIDE ALL OF SWITCHES SHOWN <br />COMBINED IN ONE GANG BOX; SHOWN IN THE DRAWING AS MULTIPLE <br />SWITCHES FOR CLARITY ONLY. <br />SCALE: 1/4" = 1'-0" <br />LIGHTING LEVEL 06 BUSINESS CENTER & LOUNGE1SCALE: 1/4" = 1'-0" <br />LIGHTING LEVEL 06 GAME ROOM2 <br />SHEET NOTES GENERAL NOTES KEY PLAN <br />NORTH <br />© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />5/ <br />1 <br />/ <br />2 <br />0 <br />2 <br />4 <br /> <br />6 <br />: <br />1 <br />8 <br />: <br />3 <br />1 <br /> <br />P <br />M <br />D: <br />\ <br />_ <br />D <br />E <br />L <br />E <br />T <br />E <br />\ <br />2 <br />2 <br />8 <br />0 <br />1 <br />1 <br />_ <br />R <br />2 <br />0 <br />\ <br />3 <br />R <br />D <br />- <br />B <br />_ <br />A <br />R <br />C <br />H <br />_ <br />W <br />E <br />S <br />T <br />_ <br />R <br />2 <br />0 <br />. <br />r <br />v <br />t <br />228011-04 <br />3rd & Broadway Residential <br />Tower Tenant Interiors <br />301 N. Broadway, Santa Ana, CA <br />06/13/2022 Issue for Plan Check <br />A 08/10/2022 Reissue for Plan Check <br />B 06/17/2024 Revision to Permit <br />ENLARGED ELECTRICAL LIGHTING <br />PLANS - LEVEL 6 <br />1. <br />2. <br />PRIMARY DAYLIGHT ZONE TO DIM DOWN WHEN <br />ABLE TO MEET TARGET DAYLIGHT LEVELS PER <br />THE SPACE TYPE. <br />SECONDARY DAYLIGHT ZONE TO DIM DOWN <br />WHEN ABLE TO MEET TARGET DAYLIGHT <br />LEVELS PER THE SPACE TYPE. <br />1/16/2025