Laserfiche WebLink
© Gensler <br />Date Description <br />Project Name <br />Project Number <br />Description <br />Scale <br />Seal / Signature <br />2021 <br />Tel 949.863.9434 <br />Fax 949-553-1676 <br />4675 MacArthur Court <br />Suite 100 <br />Newport Beach, CA <br />92600 <br />USA <br />EXP: 12/31/2025 <br />6/12/2024 7:41:07 AM <br />BIM 360://007.3757.000 - Caribou Industries - 3rd & Broadway/228011-04_3RD-B_MECH_R20.rvt <br />R2.M0.1 <br />BASIS OF DESIGN AND GENERAL <br />NOTES <br />228011-04 <br />3rd & Broadway Residential <br />Tower Tenant Interiors <br />1103 North Broadway <br />Santa Ana, CA 92701 <br />MECHANICAL BASIS OF DESIGNGENERAL NOTES <br />47. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH <br />STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM AS RECOMMENDED BY THE <br />MANUFACTURER FOR RATED ACCURACY. <br />48. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM SENSORS AT 4'-0" (1.2 M) TO CENTERLINE ABOVE FINISHED <br />FLOOR. NOTIFY THE OWNER'S REPRESENTATIVE OF ANY ROOMS WHERE THE ABOVE LOCATION CANNOT BE <br />MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. <br />49. COORDINATE ALL CONTROLS AND SEQUENCES OF OPERATION WITH THE BUILDING AUTOMATION SYSTEM <br />(BAS). PROVIDE ALL DEVICES, CONTROLLERS, SENSORS, CONDUIT, WIRING AND LABOR TO PROVIDE A <br />COMPLETE AND OPERATIONAL SYSTEM TO MEET THE OWNER'S PROJECT REQUIREMENTS. <br />50. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE ELECTRICAL CODE AND THE SPECIFICATION <br />SECTIONS. <br />51. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE <br />AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO <br />FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE <br />FABRICATION. <br />52. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT <br />SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE <br />ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A <br />PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS <br />FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE <br />MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL. <br />53. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE <br />NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO <br />SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS <br />AND SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. DO NOT <br />SCALE DRAWINGS. <br />54. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR <br />PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY <br />THE MECHANICAL CONTRACTOR. <br />55. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED <br />WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS <br />SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL <br />MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED. <br />56. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM METAL DECK. <br />57. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL CONTRACTOR <br />SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR. <br />58. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER <br />TRADES INVOLVED. <br />59. ALL PENETRATIONS THROUGH FIRE AND SMOKE RATED WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., <br />SHALL BE FIRE AND SMOKE STOPPED WITH A UL APPROVED SEALANT SYSTEM. <br />60. MECHANICAL DUCT PENETRATIONS OF A NON-FIRE RESISTANCE RATED FLOOR ASSEMBLY SHALL BE <br />PROTECTED WITH A SHAFT ASSEMBLY IN ACCORDANCE WITH THE BUILDING CODE. OR, WHEN THE DUCT <br />CONNECTS NOT MORE THAN TWO STORIES, THE ANNULAR SPACE AROUND THE PENETRATING DUCT MUST <br />BE MATERIAL THAT RESISTS THE FREE PASSAGE OF FLAME AND PRODUCTS OF CONSTRUCTION. <br />61. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT <br />SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH "P" TRAP, AND PIPED TO NEAREST DRAIN. SEE <br />DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR CONDITIONING <br />CONDENSATE TRAP. <br />62. PROVIDE 120 VOLT ELECTRICAL OUTLETS WITHIN 25 FEET (8 M) OF ALL MECHANICAL EQUIPMENT. <br />63. SIZING OF THE GAS FIRED CATEGORY 1 APPLIANCE VENTING SYSTEMS SHALL BE IN ACCORDANCE WITH THE <br />REQUIREMENTS OF THE MECHANICAL CODE AS APPLICABLE TO THE TYPE INSTALLATION. <br />64. EQUIPMENT AND APPLIANCES SHALL BE ACCESSIBLE FOR SERVICE, INSPECTION, REPAIR AND REPLACEMENT <br />WITHOUT REMOVING PERMANENT CONSTRUCTION. SUFFICIENT CLEARANCE SHALL BE MAINTAINED TO <br />PERMIT CLEANING, REPLACEMENT OF FILTERS, BLOWERS, MOTORS CONTROLS AND LUBRICATION OF <br />MOVING PARTS. MINIMUM OF 30 INCHES (750 MM) OF CLEARANCE IN DEPTH WIDTH AND HEIGHT SHALL BE <br />PROVIDED TO SERVICE THE APPLIANCE OR EQUIPMENT. <br />65. PERMANENT LIGHTING FIXTURES SHALL BE INSTALLED FOR ALL EQUIPMENT AND APPLIANCES INSTALLED <br />ABOVE PERMANENTLY CONSTRUCTED CEILING. CONTROL OF THE LIGHT FIXTURES SHALL BE PROVIDED AT <br />THE ACCESS ENTRANCE. <br />66. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED. <br />67. BALANCE AIR FLOW AT ALL AIR INLETS AND OUTLETS TO AIR QUANTITIES SHOWN. MECHANICAL <br />CONTRACTOR SHALL PROVIDE MOTORS, PULLEYS AND BELTS AS REQUIRED TO ACCOMMODATE THE <br />REQUIRED AIR FLOWS. BALANCE ALL WATER FLOWS TO COILS AND MECHANICAL EQUIPMENT TO VALUES <br />SHOWN. INSTALL TEST PLUGS WHERE NECESSARY. PROVIDE FIVE TYPED FINAL BALANCE REPORTS. <br />BALANCING CONTRACTOR SHALL BE INDEPENDENT OF THE INSTALLING CONTRACTORS AND CERTIFIED BY <br />THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR ASSOCIATED AIR BALANCE COUNCIL (AABC) <br />WITH AT LEAST THREE YEARS OF EXPERIENCE. <br />68. ALL EXPOSED PIPE, UNFINISHED EQUIPMENT AND DUCT SUPPORTS TO MATCH ADJACENT AREAS AS <br />REQUIRED BY PAINTING SPECIFICATION. <br />69. RESTORE ALL DAMAGE RESULTING FROM YOUR WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN <br />FINISHED WITH WORK. <br />70. GUARANTEE ALL WORK AND MATERIALS FOR ONE YEAR (MINIMUM) FROM DATE OF CERTIFICATE OF <br />OCCUPANCY. <br />71. AT COMPLETION OF CONSTRUCTION PROVIDE AS-BUILT MARK-UPS AND COPIES OF BOUND OPERATIONS AND <br />MAINTENANCE MANUALS. <br />72. A COPY OF THE MANUFACTURERS INSTALLATION INSTRUCTIONS SHALL BE PROVIDED AT THE LOCATION OF <br />EACH PIECE OF EQUIPMENT. <br />73. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITE UNTIL FINAL <br />STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR <br />DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEETMETAL OR OTHER <br />METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND <br />DEBRIS WHICH MAY ENTER THE SYSTEM. <br />MECHANICAL - GENERAL NOTES <br />1. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND <br />GENERAL ARRANGEMENT ONLY. DO NOT SCALE FOR MATERIAL QUANTITIES. ALL SCALING SHOULD BE <br />REFERENCED TO ARCHITECTURAL PLANS ONLY. <br />2. GENERAL NOTES AND LEGEND APPLY TO ALL SHEETS. <br />3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED FEES, PERMITS AND INSPECTIONS. OBTAIN ALL <br />FIELD APPROVALS ON WORK FROM REGULATING AGENCIES WHERE REQUIRED. <br />4. DURING ENTIRE CONSTRUCTION PERIOD MAINTAIN ADEQUATE FIRE EXTINGUISHERS READY FOR USE IN <br />CASE OF FIRE. <br />5. PROTECTION OF PUBLIC: THE CONTRACTOR SHALL PROTECT THE PUBLIC FROM INJURY DURING PROGRESS <br />OF THE WORK BY POSTING WARNING SIGNS, GUARD LIGHTS AND BARRICADES AS REQUIRED. <br />6. COORDINATE ALL WORK WITH VARIOUS TRADES IN INSTALLING ALL WORK TO CLEAR ARCHITECTURAL AND <br />STRUCTURAL MEMBERS. NO WORK SUCH AS PIPE, DUCT, ETC., TO BE IN CONTACT WITH ANY EQUIPMENT OR <br />BUILDING MEMBERS. <br />7. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR AND OTHER DISCIPLINES. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING RELATED TO HIS WORK. <br />8. OBTAIN WRITTEN PERMISSION OF STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY CUTTING OR <br />PATCHING OF STRUCTURAL SYSTEMS. DO NOT CUT ROOF FRAMING. <br />9. REFER TO STRUCTURAL DESIGN FOR SEISMIC ATTACHMENT REQUIREMENTS PER THE BUILDING CODE. ALL <br />SEISMIC RESTRAINTS OF PIPES AND DUCTS SHALL MEET THE MINIMMUM REQUIREMENTS OF THE 2008 <br />SMACNA SEISMIC RESTRAINT MANUAL. CONTRACTOR SHALL MAINTAIN ONE COPY ON SITE AT ALL TIMES FOR <br />REVIEW AND ACCESS BY INSPECTORS AND OWNER'S REPRESENTATIVES. <br />10. THESE PLANS AND ACCOMPANYING SPECIFICATIONS HAVE BEEN DESIGNED TO SHOW SUBSTANTIAL <br />COMPLIANCE WITH THE ENERGY STANDARDS. ALL EQUIPMENT SHALL MEET THE REQUIREMENTS OF THE <br />BUILDING ENERGY EFFICIENCY STANDARDS. <br />11. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE <br />MANUFACTURER SHALL BE USED. <br />12. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION. <br />13. ALL DUCT HANGERS AND SUPPORTS SHALL COMPLY WITH THE MECHANICAL CODE AND THE "SMACNA HVAC <br />DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE". <br />14. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL IN ACCORDANCE <br />WITH MECHANICAL CODE, SMACNA HVAC DUCT CONSTRUCTION STANDARDS AND ASHRAE STANDARDS. <br />DUCT GAUGE AND CONSTRUCTION SHALL BE SELECTED AT 1.5 TIMES THE DESIGN FAN SUPPLY STATIC. <br />INSTALL SINGLE THICKNESS TURNING VANES AT EACH RECTANGULAR ELBOW OR PROVIDE 1.5X RADIUSED <br />ELBOWS. <br />15. DIMENSIONS AND SHAPE OF THE DUCT MAY BE ALTERED, AS LONG AS THE SAME AIR VELOCITY AND FLOW <br />RATE ARE MAINTAINED, TO AVOID INTERFERENCES AND MAINTAIN ADEQUATE CLEARANCES. <br />16. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT <br />SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS. <br />17. SEAL ALL DUCT JOINTS, INCLUDING LONGITUDINAL JOINTS, WITH WATER BASED SEALANT. MAXIMUM <br />ALLOWABLE DUCTWORK LEAKAGE SHALL NOT EXCEED 5% AND AS DEFINED ELSEWHERE IN DOCUMENTS. <br />18. ALL SUPPLY AND RETURN AIR DUCTWORK SHALL BE INSULATED WITH NOT LESS THAN THE AMOUNT OF <br />INSULATION INDICATED IN ACCORDANCE WITH THE MECHANICAL CODE AND ENERGY CODE. ALL DUCTWORK <br />MOUNTED EXTERIOR TO THE BUILDING ENVELOPE SHALL BE SANDWICHED INSULATION WITH DOUBLE WALL <br />SHEETMETAL CONSTRUCTION. <br />19. IDENTIFY ALL NEW MECHANICAL EQUIPMENT WITH NAMEPLATES PERMANENTLY ENGRAVED WITH 1/2 INCH <br />HIGH WHITE LETTERS ON A BLACK BACKGROUND. IDENTIFY EQUIPMENT WITH SYMBOLS SHOWN ON THE <br />PLANS AND AREA SERVED DESCRIPTION. <br />20. INSTALL VOLUME DAMPERS WHERE SHOWN AND AS REQUIRED FOR PROPER BALANCING OF EACH <br />DIFFUSER/GRILLE/REGISTER. VOLUME DAMPERS SHALL BE MOUNTED IMMEDIATELY DOWNSTREAM OF <br />BRANCH CONNECTIONS. PROVIDE EXTENDED REGULATORS, WITH CONCEALED COVER PLATES, TO <br />OPERATE DAMPERS LOCATED ABOVE INACCESSIBLE CEILINGS. <br />21. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME DAMPERS, ETC., ARE <br />INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATION <br />REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR THESE ITEMS. <br />22. PROVIDE FLASHING AND COUNTERFLASHING FOR ALL PENETRATIONS THROUGH WALLS OR ROOF TO MAKE <br />WATERPROOF INSTALLATION. <br />23. OUTSIDE AIR FOR A HEATING OR COOLING SYSTEM SHALL NOT BE TAKEN FROM CLOSER THAN 10 FEET (3 M) <br />FROM AN APPLIANCE VENT OUTLET, VENT OPENING OF A PLUMBING SYSTEM, OR THE DISCHARGE OUTLET OF <br />EXHAUST FAN, UNLESS THE OUTLET IS 3 FEET (1 M) ABOVE THE OUTSIDE AIR INLET. <br />24. COORDINATE ALL SUPPLY DIFFUSERS AND RETURN GRILLES WITH CEILING GRID, LIGHTS, SPRINKLER HEADS, <br />SEISMIC BRACING, TELEPHONE EQUIPMENT, AREA DETECTORS, ETC. <br />25. CEILING DIFFUSER SIZES SHOWN INDICATE NECK SIZES. PROVIDE FRAMES AS REQUIRED TO MATCH <br />MOUNTING SURFACE. <br />26. DUCT SIZE SERVING DIFFUSERS AND GRILLES MUST BE EQUAL OR GREATER IN AREA UNLESS OTHERWISE <br />NOTED ON THE DRAWINGS. <br />27. CONDENSATE AND PRESSURE RELIEF PIPING SHALL BE TYPE L OR M TUBING WITH WROUGHT COPPER <br />FITTINGS. PRIMARY DRAIN PAN SHALL BE PROVIDED WITH COOLING COIL AND EXTEND BEYOND THE LEAVING <br />SIDE OF THE COIL AND UNDERNEATH THE COOLING COIL CONNECTIONS. PROVIDE SECONDARY DRAIN PAN <br />WITH MOISTURE DETECTOR FOR UNIT SHUTDOWN AS SCHEDULED. <br />28. SUPPORT ALL PIPING SO THAT IT IS FIRMLY HELD IN PLACE BY APPROVED IRON HANGERS AND SUPPORTS, IN <br />ACCORDANCE WITH RECOMMENDATIONS OF AMERICAN PIPE FITTERS ASSOCIATION AND PIPE HANGER <br />INSTITUTE. <br />29. MOTOR STARTERS AND VARIABLE FREQUENCY DRIVES, WHERE REQUIRED, SHALL BE PROVIDED AND <br />MOUNTED BY THE MECHANICAL INSTALLER AND WIRING/CONDUIT BY ELECTRICAL INSTALLER. <br />30. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND <br />OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE. <br />31. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN THE SAME LIGHT <br />FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN THE SAME FIXTURE. <br />32. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING <br />PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT MODIFICATIONS TO SUIT. <br />33. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS <br />AND VALVING. <br />34. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND EXHAUST) <br />CONNECTED TO AIR HANDLING UNITS AND FANS. FLEXIBLE CONNECTORS SHALL NOT BE PROVIDED AT FIRE LIFE SAFETY <br />FANS INCLUDING BUT NOT LIMITED TO STAIRWELL PRESSURIZATION FANS AND SMOKE EVACUATION FANS. <br />35. INDIVIDUAL RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED FIVE (5) FEET. <br />36. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED <br />TO PROVIDE A VIBRATION FREE INSTALLATION. <br />37. ALL EQUIPMENT ATTACHED AND ANCHORED PER THE APPLICABLE BUILDING CODE, MANUFACTURER'S <br />INSTRUCTIONS AND STRUCTURAL DESIGN. <br />38. PROVIDE VIBRATION ISOLATION DEVICES FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF <br />VIBRATION TO BUILDING STRUCTURE. <br />39. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING <br />DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST <br />TO THE OWNER. <br />40. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL FANS, SMOKE DETECTORS, FIRE <br />DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THE <br />DUCTWORK WHICH REQUIRE OPERATION, ADJUSTMENT AND MAINTENANCE. <br />41. DUCT MOUNTED PHOTOELECTRIC SMOKE DETECTORS SHALL BE INSTALLED IN SUPPLY AND RETURN DUCTS FOR <br />EACH HEATING OR COOLING SYSTEM SUPPLYING AIR IN EXCESS OF 2000 CFM (3400 CMH) AND IN SYSTEMS <br />SERVING MORE THAN ONE OCCUPANCY TYPE. DETECTOR SHALL BE PROVIDED WITH METAL SAMPLING TUBE <br />AND BE MOUNTED IN THE SUPPLY AIR DUCTWORK. DETECTOR SHALL SHUT DOWN THE AIR-MOVING <br />EQUIPMENT WHEN SMOKE IS DETECTED. PROVIDE REMOTE TEST AND RESET STATION FOR MOUNTING AT <br />THE CEILING OR WALL IN THE VICINITY OF THE SMOKE DETECTOR. <br />42. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL INSTALLER. THE MECHANICAL <br />INSTALLER SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK AS SHOWN ON <br />THE DRAWINGS AND IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS. <br />43. THE EXACT LOCATION AND SIZE OF EQUIPMENT PADS, ROOF OPENINGS, WALL OPENINGS, WALL/FLOOR <br />PENETRATIONS, AND MOUNTING FRAMES SHALL BE COORDINATED IN THE FIELD WITH FINAL EQUIPMENT <br />FURNISHED AND BUILDING CONSTRUCTION. <br />44. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. DETAILED DESCRIPTIONS ARE PROVIDED IN <br />THE ARCHITECTURAL DOCUMENTS AND SHALL BE COORDINATED WITH GENERAL CONTRACTOR. <br />45. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS' <br />RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS. <br />46. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, <br />ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS. <br />A. THIS BUILDING INVOLVES A NEW, FIFTEEN STORY HIGH-RISE RESIDENTIAL BUILDING WITH A TOTAL OF 170 RESIDENTIAL UNITS. A <br />HIGH RISE TOWER SITS ON A SUBTERRANEAN PARKING GARAGE AND LEVEL 1 CORE AND SHELL RETAIL/RESTAURANT SPACES. <br />B. THE DESIGN INCLUDES THE FOLLOWING NOTABLE FEATURES, BUT IS NOT LIMITED TO THIS SCOPE. CONTRACTOR <br />IS RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS AND COORDINATING WITH ALL DISCIPLINES. <br />1. COOLING/HEATING: AIR-SOURCE HEAT PUMP WITH VARIABLE REFRIGERANT FLOW (VRF) FAN COILS. <br />2. CONTROLS: DIRECT DIGITAL BUILDING AUTOMATION SYSTEM (BAS) TO OPERATE ALL SYSTEM FUNCTIONS AND SCHEDULES. <br />3. ZONING OF VRF SYSTEM TO MAINTAIN REFRIGERANT VOLUME WITHIN INDIVIDUAL ROOMS WITHIN ASHRAE STANDARD 15 <br />LIMITS. NO EXCEPTIONS WILL BE TAKEN TO THIS RULE. <br />C. CODES AND STANDARDS (LATEST EDITIONS UNLESS OTHERWISE REQUIRED BY AHJ) <br />1. AMERICANS WITH DISABILITIES ACT (ADA) <br />2. NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS. <br />3. NFPA 90B: STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS. <br />5. NFPA 101: LIFE SAFETY CODE. <br />6. ASHRAE HANDBOOK, FUNDAMENTALS <br />7. ASHRAE HANDBOOK, REFRIGERATION. <br />8. ASHRAE HANDBOOK, HVAC APPLICATIONS. <br />9. ASHRAE HANDBOOK, HVAC SYSTEMS AND EQUIPMENT. <br />10. ASHRAE 55 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY. <br />11. ASHRAE 62.1 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY. <br />12. ASHRAE 90.1 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS. <br />13. CALIFORNIA BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ): <br />A) 2019 CALIFORNIA BUILDING CODE (CBC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 2 (2018 <br />INTERNATIONAL BUILDING CODE WITH STATE AND LOCAL AMENDMENTS). <br />B) 2019 CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 4 <br />(2018 UNIFORM MECHANICAL CODE (UMC) WITH STATE AND LOCAL AMENDMENTS). <br />C) 2019 CALIFORNIA PLUMBING CODE (CPC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 5 (2018 <br />UNIFORM PLUMBING CODE (UPC) WITH STATE AND LOCAL AMENDMENTS). <br />D) 2019 CALIFORNIA FIRE CODE (CFC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 9 (2018 <br />INTERNATIONAL FIRE CODE WITH STATE AND LOCAL AMENDMENTS). <br />E) 2019 CALIFORNIA ELECTRIC CODE (CEC) (2018 NATIONAL ELECTRICAL CODE WITH STATE AND LOCAL <br />AMENDMENTS). <br />F) 2019 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARD FOR RESIDENTIAL AND NONRESIDENTIAL <br />BUILDINGS, CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 6. <br />G) 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE, CALIFORNIA CODE OF REGULATIONS, TITLE-24, <br />PART 11. <br />D. OUTDOOR DESIGN CONDITIONS: <br />1. LOCATION: SANTA ANA, CA <br />2. SUMMER: 91°F DB/68°F MCWB (TITLE24 0.5%) <br />3. WINTER: 35°F (TITLE24 0.2%) <br />4. ELEVATION: 115 FT. <br />5. CLIMATE ZONE: 8 <br />E. INDOOR DESIGN CONDITIONS <br />1. ALL CONDITIONED AREAS: <br />A) COOLING: 75°F+/-2°F <br />B) HEATING: 70°F +/-2°F <br />2. EXCEPTIONS: <br />A) ELEC. ROOMS: 85°F +/-2°F MAXIMUM <br />B) DATA/TELECOM ROOMS: COOLING ONLY, 78°F +/- 2°F (MAXIMUM) <br />C) ELEVATOR MACHINE ROOMS: COOLING ONLY, 85°F +/- 2°F (MAXIMUM) <br />D) TRASH ROOMS: 85°F +/-2°F MAXIMUM <br />E) GROUND FLOOR MAIN TRASH ROOM: 75°F +/-2°F MAXIMUM <br />3. HUMIDITY CONTROL <br />A) ALL AREAS, UNLESS OTHERWISE NOTED: NONE <br />F. CALIFORNIA VENTILATION CRITERIA: <br />1. ALL AREAS: 15 CFM/PERSON OR 0.15 CFM/SQ.FT., WHICHEVER IS GREATER. <br />2. COMPLY WITH CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARD. <br />3. COMPLY WITH CHAPTER 4 OF CMC, CHAPTER 12 OF CBC AND ASHRAE 62.1. <br />4. ENCLOSED PARKING GARAGE: COMPLY WITH CHAPTER 4 OF CMC. <br />5. NO PROVISIONS WILL BE PROVIDED FOR OSA RATES ABOVE CODE MINIMUM. <br />G. EXHAUST TO OUTDOORS (MINIMUM RATES) <br />1. TOILET ROOMS: 12 AIR CHANGES PER HOUR OR 50 CFM/FIXTURE, WHICHEVER IS GREATER. PRIVATE RESIDENTIAL <br />RESTROOMS WILL BE LIMITED TO 50 CFM MAX. <br />2. JANITOR CLOSET: 100 CFM OR 10 AIR CHANGES PER HOUR, WHICHEVER IS GREATER. <br />3. SHOWER ROOMS: 12 AIR CHANGES PER HOUR <br />4. MAIN TRASH ROOMS: 1 CFM/SQ.FT. <br />H. BUILDING ENVELOPE <br />1. GLAZING: GLASS/FRAME COMBINATION <br />A) GROUND LEVEL: <br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME <br />2) U= 0.44 (ASSEMBLY) <br />3) SOLAR HEAT GAIN COEFFICIENT (SHGC) = 0.32 (ASSEMBLY) <br />A) PODIUM: <br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME <br />2) U= 0.44 (ASSEMBLY) <br />3) SOLAR HEAT GAIN COEFFICIENT (SHGC) = 0.31 (ASSEMBLY) <br />B) TOWER: <br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME <br />2) U= 0.45 (ASSEMBLY) <br />3) SHGC = 0.28 (ASSEMBLY) <br />2. WALL CONSTRUCTION: <br />A) EXTERIOR WALLS: <br />1) DESCRIPTION: METAL FRAMED <br />2) U= 0.15 <br />3. ROOF CONSTRUCTION: <br />A) STRUCTURE: R40 CONTINUOUS INSULATION OVER CONCRETE DECK <br />B) OVERALL U-VALUE = 0.047 <br />C) REFLECTIVITY: MAX 78% AGED <br />4. EXTERIOR FLOOR: <br />A) DESCRIPTION: CONCRETE SLAB <br />B) U=0.269 <br />I. INTERNAL HEAT GAINS <br />1. LIGHTING: <br />A) OFFICE: 1.0 W/SF <br />B) LOBBY: 1.3 W/SF <br />C) CORRIDOR: 0.7 W/SF <br />D) RESTROOM: 0.7 W/SF <br />E) RETAIL: 1.3 W/SF <br />F) FITNESS CENTER: 1.0 W/SF <br />G) RESIDENTIAL UNITS: 0.5 W/SF <br />2. RECEPTACLE POWER IN OFFICES AREAS: 1.5 W/SF <br />3. ELECTRICAL TRANSFORMERS: 3.5% LOSS <br />4. ELEVATOR MACHINE ROOMS: SEE PLANS FOR BTUH <br />5. OCCUPANCY CRITERIA IN CALIFORNIA: <br />A) OFFICE OCCUPANT: 250 BTUH SENSIBLE/200 BTUH LATENT <br />B) OFFICE: 1 PERSON/100 SF <br />C) FITNESS CENTER: 1 PERSON/20 SF <br />D) STREET LEVEL RETAIL AREA: 1 PERSON/30 SF <br />E) LOBBY: 1 PERSON/15 SF <br />F) DINING: 1 PERSON/10 SF <br />6. ZONING CRITERIA <br />A) ELECTRICAL ROOMS: ONE ZONE (TEMPERATURE SENSOR) PER ROOM <br />B) DINING: ONE ZONE (TEMPERATURE SENSOR) PER DINING AREA, ONE ZONE (TEMPERATURE SENSOR) PER KITCHEN <br />C) LOBBY: ONE ZONE (TEMPERATURE SENSOR) <br />D) AMENITY ROOMS (EXERCISE, LOUNGE, ETC.): ONE ZONE (TEMPERATURE SENSOR) PER ROOM <br />E) RESIDENTIAL UNITS: ONE ZONE (THERMOSTAT) PER ROOM <br />J. DUCTWORK DESIGN CRITERIA (MAXIMUM ALLOWABLE AIR PRESSURE DROPS AND AIR VELOCITIES) TO MEET HIGH <br />EFFICIENCY OPERATION WITH MINIMAL ACOUSTICAL NOISE. DUCT STATIC PRESSURE FRICTION LOSS SHALL NOT <br />EXCEED 0.2" PER 100 FEET IN MECHANICAL ROOMS AND SHAFTS. LOW PRESSURE SUPPLY DUCT STATIC <br />PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.08" PER 100 FEET. LOW PRESSURE RETURN AND EXHAUST <br />DUCT STATIC PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.06" PER 100 FEET. MEDIUM PRESSURE <br />DUCTWORK SHALL NOT EXCEED A DUCT STATIC PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.1" PER 100 <br />FEET. <br />1. IN ADDITION, MAXIMUM SUPPLY, RETURN AND EXHAUST DUCT AIR FLOW VELOCITIES, REGARDLESS OF <br />PRESSURE DROP, SHALL NOT EXCEED THE FOLLOWING CRITERIA: <br />A) MAINS ABOVE CEILING: 1750 FPM <br />B) MAINS ABOVE OPEN OCCUPIED SPACES: 1450 FPM <br />C) BRANCHES ABOVE CEILING: 1400 FPM <br />D) BRANCHES ABOVE OPEN OCCUPIED SPACES: 1150 FPM <br />E) RUN-OUTS TO DIFFUSERS: 725 FPM <br />F) IN SHAFTS: 2500 FPM <br />G) IN MECHANICAL ROOMS: 3000 FPM <br />2. GREASE EXHAUST DUCT SHALL RANGE FROM 500 FPM IN VAV SYSTEMS (MINIMUM) TO MAXIMUM 2500 FPM <br />VELOCITY. <br />K. ACOUSTICAL <br />1. THE FOLLOWING NOISE NC/RC CRITERIA LEVELS WILL BE ACHIEVED AND AS DEFINED IN THE ASHRAE HVAC <br />APPLICATIONS HANDBOOK. THESE LEVELS ADDRESS THE MECHANICAL SYSTEMS ONLY. ACTUAL SOUND <br />PERFORMANCE REQUIREMENTS FOR EACH SPACE MUST BE VERIFIED WITH ACOUSTICAL CONSULTANT. <br />A) OFFICES: 35 <br />B) MEETING/FUNCTION ROOM: 30 <br />C) BAR/RESTAURANT/PANTRY: 40 <br />D) LOBBY/RECEPTION/CORRIDOR: 35 <br />E) RESIDENTIAL UNIT: 30 <br />F) RESIDENTIAL BATHROOM: 35 <br />G) PUBLIC RESTROOM: 40 <br />H) DINING: 35 <br />I) FITNESS: 40 <br />J) STAFF RESTROOM/CHANGING: 45 <br />K) BOH/SERVICE AREAS: 50 <br />2. ROOFTOP CONDENSING UNITS: EQUIPMENT MOUNTING WITH STEEL SUPPORTS INCLUDING NEOPRENE MOUNTS (MASON <br />INDUSTRIES TYPE BR HAVING 0.2" OF STATIC DEFLECTION) ON THE EQUIPMENT AND ISOLATION FOR THE REFRIGERANT <br />PIPING. <br />3. SUPPLY AND EXHAUST SYSTEMS: IF A SHAFT IS WITHIN 40 FEET OF A PROPERTY LINE, THE ASSOCIATED FAN MUST HAVE A <br />SOUND TRAP THAT HAS THE ABILITY TO REDUCE SOUND LEVEL AT 125 HZ BY 13 DB. <br />4. GRILLES, REGISTERS AND DIFFUSERS: NC-20 WITHIN RESIDENTIAL UNITS, NC-30 IN THE REMAINDER OF THE PUBLIC AREAS. <br />5. TOILET EXHAUST FANS: MAX SONE LEVEL OF 1.5 SONES. <br />L. SEISMIC: <br />1. ANCHORAGE AND RESTRAINTS MUST BE COORDINATED WITH STRUCTURAL ENGINEER AND AUTHORITY <br />HAVING JURISDICTION. ALL SEISMIC RESTRAINTS SHALL BE A DELEGATED DESIGN. <br />M. CONTROLS <br />1. ALL MAJOR MECHANICAL EQUIPMENT SHALL INTEGRATE WITH THE BUILDING BAS TO MONITOR AND CONTROL OPERATION. <br />N. THE HVAC SYSTEM INCLUDES THE FOLLOWING SUSTAINABLE DESIGN FEATURES: <br />1. SELECT REFRIGERANTS AND HVAC EQUIPMENT THAT MINIMIZE AND ELIMINATE THE EMISSION OF <br />COMPOUNDS THAT CONTRIBUTE TO OZONE DEPLETION. <br />2. PROVIDE INDOOR AIR QUANTITIES TO MEET MINIMUM REQUIREMENTS OF SECTIONS 4 THROUGH 7 OF <br />ASHRAE STANDARD 62.1-2016. <br />3. INSTALL PERMANENT CARBON MONOXIDE AND AIR QUALITY MONITORING SYSTEMS TO ENSURE THAT VENTILATION SYSTEMS <br />MAINTAIN DESIGN MINIMUM REQUIREMENTS. <br />4. USE VARIABLE FREQUENCY DRIVES TO OPERATE FANS AND PUMPS. <br />5. UTILIZE HEAT RECOVERY IN THE VRF SYSTEM. <br />1 <br />06.13.2022 ISSUE FOR PLAN CHECK <br />1 06.17.2024 REVISION TO PERMIT <br />1/15/2025