<br />BASIS OF DESIGN AND GENERAL
<br />NOTES
<br />228011-04
<br />3rd & Broadway Residential
<br />Tower Tenant Interiors
<br />1103 North Broadway
<br />Santa Ana, CA 92701
<br />MECHANICAL BASIS OF DESIGNGENERAL NOTES
<br />47. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH
<br />STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND DOWNSTREAM AS RECOMMENDED BY THE
<br />MANUFACTURER FOR RATED ACCURACY.
<br />48. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM SENSORS AT 4'-0" (1.2 M) TO CENTERLINE ABOVE FINISHED
<br />FLOOR. NOTIFY THE OWNER'S REPRESENTATIVE OF ANY ROOMS WHERE THE ABOVE LOCATION CANNOT BE
<br />MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.
<br />49. COORDINATE ALL CONTROLS AND SEQUENCES OF OPERATION WITH THE BUILDING AUTOMATION SYSTEM
<br />(BAS). PROVIDE ALL DEVICES, CONTROLLERS, SENSORS, CONDUIT, WIRING AND LABOR TO PROVIDE A
<br />COMPLETE AND OPERATIONAL SYSTEM TO MEET THE OWNER'S PROJECT REQUIREMENTS.
<br />50. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE ELECTRICAL CODE AND THE SPECIFICATION
<br />SECTIONS.
<br />51. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE
<br />AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO
<br />FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE
<br />FABRICATION.
<br />52. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, FIRE PROTECTION, ETC.) IS SUBCONTRACTED, IT
<br />SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE
<br />ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE PERTAINING TO WHICH CONTRACTOR PROVIDES A
<br />PARTICULAR ITEM OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS
<br />FOR A PARTICULAR ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
<br />MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
<br />53. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE
<br />NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO
<br />SECURE THE BEST CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS
<br />AND SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE PRIOR TO INSTALLATION. DO NOT
<br />SCALE DRAWINGS.
<br />54. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR
<br />PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY
<br />THE MECHANICAL CONTRACTOR.
<br />55. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED
<br />WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS
<br />SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS MEETING MSS STANDARDS. WELDING TO STRUCTURAL
<br />MEMBERS SHALL NOT BE PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
<br />56. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM METAL DECK.
<br />57. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL CONTRACTOR
<br />SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.
<br />58. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE COORDINATED WITH ALL OTHER
<br />TRADES INVOLVED.
<br />59. ALL PENETRATIONS THROUGH FIRE AND SMOKE RATED WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC.,
<br />SHALL BE FIRE AND SMOKE STOPPED WITH A UL APPROVED SEALANT SYSTEM.
<br />60. MECHANICAL DUCT PENETRATIONS OF A NON-FIRE RESISTANCE RATED FLOOR ASSEMBLY SHALL BE
<br />PROTECTED WITH A SHAFT ASSEMBLY IN ACCORDANCE WITH THE BUILDING CODE. OR, WHEN THE DUCT
<br />CONNECTS NOT MORE THAN TWO STORIES, THE ANNULAR SPACE AROUND THE PENETRATING DUCT MUST
<br />BE MATERIAL THAT RESISTS THE FREE PASSAGE OF FLAME AND PRODUCTS OF CONSTRUCTION.
<br />61. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND ROOFTOP UNIT
<br />SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH "P" TRAP, AND PIPED TO NEAREST DRAIN. SEE
<br />DETAILS SHOWN ON THE DRAWINGS OR THE CONTRACT SPECIFICATIONS FOR DEPTH OF AIR CONDITIONING
<br />CONDENSATE TRAP.
<br />62. PROVIDE 120 VOLT ELECTRICAL OUTLETS WITHIN 25 FEET (8 M) OF ALL MECHANICAL EQUIPMENT.
<br />63. SIZING OF THE GAS FIRED CATEGORY 1 APPLIANCE VENTING SYSTEMS SHALL BE IN ACCORDANCE WITH THE
<br />REQUIREMENTS OF THE MECHANICAL CODE AS APPLICABLE TO THE TYPE INSTALLATION.
<br />64. EQUIPMENT AND APPLIANCES SHALL BE ACCESSIBLE FOR SERVICE, INSPECTION, REPAIR AND REPLACEMENT
<br />WITHOUT REMOVING PERMANENT CONSTRUCTION. SUFFICIENT CLEARANCE SHALL BE MAINTAINED TO
<br />PERMIT CLEANING, REPLACEMENT OF FILTERS, BLOWERS, MOTORS CONTROLS AND LUBRICATION OF
<br />MOVING PARTS. MINIMUM OF 30 INCHES (750 MM) OF CLEARANCE IN DEPTH WIDTH AND HEIGHT SHALL BE
<br />PROVIDED TO SERVICE THE APPLIANCE OR EQUIPMENT.
<br />65. PERMANENT LIGHTING FIXTURES SHALL BE INSTALLED FOR ALL EQUIPMENT AND APPLIANCES INSTALLED
<br />ABOVE PERMANENTLY CONSTRUCTED CEILING. CONTROL OF THE LIGHT FIXTURES SHALL BE PROVIDED AT
<br />THE ACCESS ENTRANCE.
<br />66. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
<br />67. BALANCE AIR FLOW AT ALL AIR INLETS AND OUTLETS TO AIR QUANTITIES SHOWN. MECHANICAL
<br />CONTRACTOR SHALL PROVIDE MOTORS, PULLEYS AND BELTS AS REQUIRED TO ACCOMMODATE THE
<br />REQUIRED AIR FLOWS. BALANCE ALL WATER FLOWS TO COILS AND MECHANICAL EQUIPMENT TO VALUES
<br />SHOWN. INSTALL TEST PLUGS WHERE NECESSARY. PROVIDE FIVE TYPED FINAL BALANCE REPORTS.
<br />BALANCING CONTRACTOR SHALL BE INDEPENDENT OF THE INSTALLING CONTRACTORS AND CERTIFIED BY
<br />THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB) OR ASSOCIATED AIR BALANCE COUNCIL (AABC)
<br />WITH AT LEAST THREE YEARS OF EXPERIENCE.
<br />68. ALL EXPOSED PIPE, UNFINISHED EQUIPMENT AND DUCT SUPPORTS TO MATCH ADJACENT AREAS AS
<br />REQUIRED BY PAINTING SPECIFICATION.
<br />69. RESTORE ALL DAMAGE RESULTING FROM YOUR WORK AND LEAVE PREMISES IN CLEAN CONDITION WHEN
<br />FINISHED WITH WORK.
<br />70. GUARANTEE ALL WORK AND MATERIALS FOR ONE YEAR (MINIMUM) FROM DATE OF CERTIFICATE OF
<br />OCCUPANCY.
<br />71. AT COMPLETION OF CONSTRUCTION PROVIDE AS-BUILT MARK-UPS AND COPIES OF BOUND OPERATIONS AND
<br />MAINTENANCE MANUALS.
<br />72. A COPY OF THE MANUFACTURERS INSTALLATION INSTRUCTIONS SHALL BE PROVIDED AT THE LOCATION OF
<br />EACH PIECE OF EQUIPMENT.
<br />73. AT THE TIME OF ROUGH INSTALLATION AND DURING STORAGE ON THE CONSTRUCTION SITE UNTIL FINAL
<br />STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT, ALL DUCT AND OTHER RELATED AIR
<br />DISTRIBUTION COMPONENT OPENINGS SHALL BE COVERED WITH TAPE, PLASTIC, SHEETMETAL OR OTHER
<br />METHODS ACCEPTABLE TO THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF DUST, WATER AND
<br />DEBRIS WHICH MAY ENTER THE SYSTEM.
<br />MECHANICAL - GENERAL NOTES
<br />1. CONTRACT DOCUMENT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
<br />GENERAL ARRANGEMENT ONLY. DO NOT SCALE FOR MATERIAL QUANTITIES. ALL SCALING SHOULD BE
<br />REFERENCED TO ARCHITECTURAL PLANS ONLY.
<br />2. GENERAL NOTES AND LEGEND APPLY TO ALL SHEETS.
<br />3. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED FEES, PERMITS AND INSPECTIONS. OBTAIN ALL
<br />FIELD APPROVALS ON WORK FROM REGULATING AGENCIES WHERE REQUIRED.
<br />4. DURING ENTIRE CONSTRUCTION PERIOD MAINTAIN ADEQUATE FIRE EXTINGUISHERS READY FOR USE IN
<br />CASE OF FIRE.
<br />5. PROTECTION OF PUBLIC: THE CONTRACTOR SHALL PROTECT THE PUBLIC FROM INJURY DURING PROGRESS
<br />OF THE WORK BY POSTING WARNING SIGNS, GUARD LIGHTS AND BARRICADES AS REQUIRED.
<br />6. COORDINATE ALL WORK WITH VARIOUS TRADES IN INSTALLING ALL WORK TO CLEAR ARCHITECTURAL AND
<br />STRUCTURAL MEMBERS. NO WORK SUCH AS PIPE, DUCT, ETC., TO BE IN CONTACT WITH ANY EQUIPMENT OR
<br />BUILDING MEMBERS.
<br />7. COORDINATE ALL CUTTING AND PATCHING WITH GENERAL CONTRACTOR AND OTHER DISCIPLINES.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING RELATED TO HIS WORK.
<br />8. OBTAIN WRITTEN PERMISSION OF STRUCTURAL ENGINEER BEFORE PROCEEDING WITH ANY CUTTING OR
<br />PATCHING OF STRUCTURAL SYSTEMS. DO NOT CUT ROOF FRAMING.
<br />9. REFER TO STRUCTURAL DESIGN FOR SEISMIC ATTACHMENT REQUIREMENTS PER THE BUILDING CODE. ALL
<br />SEISMIC RESTRAINTS OF PIPES AND DUCTS SHALL MEET THE MINIMMUM REQUIREMENTS OF THE 2008
<br />SMACNA SEISMIC RESTRAINT MANUAL. CONTRACTOR SHALL MAINTAIN ONE COPY ON SITE AT ALL TIMES FOR
<br />REVIEW AND ACCESS BY INSPECTORS AND OWNER'S REPRESENTATIVES.
<br />10. THESE PLANS AND ACCOMPANYING SPECIFICATIONS HAVE BEEN DESIGNED TO SHOW SUBSTANTIAL
<br />COMPLIANCE WITH THE ENERGY STANDARDS. ALL EQUIPMENT SHALL MEET THE REQUIREMENTS OF THE
<br />BUILDING ENERGY EFFICIENCY STANDARDS.
<br />11. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCT OF ONE
<br />MANUFACTURER SHALL BE USED.
<br />12. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
<br />13. ALL DUCT HANGERS AND SUPPORTS SHALL COMPLY WITH THE MECHANICAL CODE AND THE "SMACNA HVAC
<br />DUCT CONSTRUCTION STANDARDS-METAL AND FLEXIBLE".
<br />14. ALL SUPPLY, RETURN AND EXHAUST AIR DUCTWORK SHALL BE GALVANIZED SHEET METAL IN ACCORDANCE
<br />WITH MECHANICAL CODE, SMACNA HVAC DUCT CONSTRUCTION STANDARDS AND ASHRAE STANDARDS.
<br />DUCT GAUGE AND CONSTRUCTION SHALL BE SELECTED AT 1.5 TIMES THE DESIGN FAN SUPPLY STATIC.
<br />INSTALL SINGLE THICKNESS TURNING VANES AT EACH RECTANGULAR ELBOW OR PROVIDE 1.5X RADIUSED
<br />ELBOWS.
<br />15. DIMENSIONS AND SHAPE OF THE DUCT MAY BE ALTERED, AS LONG AS THE SAME AIR VELOCITY AND FLOW
<br />RATE ARE MAINTAINED, TO AVOID INTERFERENCES AND MAINTAIN ADEQUATE CLEARANCES.
<br />16. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR DIMENSIONS AND DUCT
<br />SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING THICKNESS.
<br />17. SEAL ALL DUCT JOINTS, INCLUDING LONGITUDINAL JOINTS, WITH WATER BASED SEALANT. MAXIMUM
<br />ALLOWABLE DUCTWORK LEAKAGE SHALL NOT EXCEED 5% AND AS DEFINED ELSEWHERE IN DOCUMENTS.
<br />18. ALL SUPPLY AND RETURN AIR DUCTWORK SHALL BE INSULATED WITH NOT LESS THAN THE AMOUNT OF
<br />INSULATION INDICATED IN ACCORDANCE WITH THE MECHANICAL CODE AND ENERGY CODE. ALL DUCTWORK
<br />MOUNTED EXTERIOR TO THE BUILDING ENVELOPE SHALL BE SANDWICHED INSULATION WITH DOUBLE WALL
<br />SHEETMETAL CONSTRUCTION.
<br />19. IDENTIFY ALL NEW MECHANICAL EQUIPMENT WITH NAMEPLATES PERMANENTLY ENGRAVED WITH 1/2 INCH
<br />HIGH WHITE LETTERS ON A BLACK BACKGROUND. IDENTIFY EQUIPMENT WITH SYMBOLS SHOWN ON THE
<br />PLANS AND AREA SERVED DESCRIPTION.
<br />20. INSTALL VOLUME DAMPERS WHERE SHOWN AND AS REQUIRED FOR PROPER BALANCING OF EACH
<br />DIFFUSER/GRILLE/REGISTER. VOLUME DAMPERS SHALL BE MOUNTED IMMEDIATELY DOWNSTREAM OF
<br />BRANCH CONNECTIONS. PROVIDE EXTENDED REGULATORS, WITH CONCEALED COVER PLATES, TO
<br />OPERATE DAMPERS LOCATED ABOVE INACCESSIBLE CEILINGS.
<br />21. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME DAMPERS, ETC., ARE
<br />INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A SPECIFIC LOCATION
<br />REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.
<br />22. PROVIDE FLASHING AND COUNTERFLASHING FOR ALL PENETRATIONS THROUGH WALLS OR ROOF TO MAKE
<br />WATERPROOF INSTALLATION.
<br />23. OUTSIDE AIR FOR A HEATING OR COOLING SYSTEM SHALL NOT BE TAKEN FROM CLOSER THAN 10 FEET (3 M)
<br />FROM AN APPLIANCE VENT OUTLET, VENT OPENING OF A PLUMBING SYSTEM, OR THE DISCHARGE OUTLET OF
<br />EXHAUST FAN, UNLESS THE OUTLET IS 3 FEET (1 M) ABOVE THE OUTSIDE AIR INLET.
<br />24. COORDINATE ALL SUPPLY DIFFUSERS AND RETURN GRILLES WITH CEILING GRID, LIGHTS, SPRINKLER HEADS,
<br />SEISMIC BRACING, TELEPHONE EQUIPMENT, AREA DETECTORS, ETC.
<br />25. CEILING DIFFUSER SIZES SHOWN INDICATE NECK SIZES. PROVIDE FRAMES AS REQUIRED TO MATCH
<br />MOUNTING SURFACE.
<br />26. DUCT SIZE SERVING DIFFUSERS AND GRILLES MUST BE EQUAL OR GREATER IN AREA UNLESS OTHERWISE
<br />NOTED ON THE DRAWINGS.
<br />27. CONDENSATE AND PRESSURE RELIEF PIPING SHALL BE TYPE L OR M TUBING WITH WROUGHT COPPER
<br />FITTINGS. PRIMARY DRAIN PAN SHALL BE PROVIDED WITH COOLING COIL AND EXTEND BEYOND THE LEAVING
<br />SIDE OF THE COIL AND UNDERNEATH THE COOLING COIL CONNECTIONS. PROVIDE SECONDARY DRAIN PAN
<br />WITH MOISTURE DETECTOR FOR UNIT SHUTDOWN AS SCHEDULED.
<br />28. SUPPORT ALL PIPING SO THAT IT IS FIRMLY HELD IN PLACE BY APPROVED IRON HANGERS AND SUPPORTS, IN
<br />ACCORDANCE WITH RECOMMENDATIONS OF AMERICAN PIPE FITTERS ASSOCIATION AND PIPE HANGER
<br />INSTITUTE.
<br />29. MOTOR STARTERS AND VARIABLE FREQUENCY DRIVES, WHERE REQUIRED, SHALL BE PROVIDED AND
<br />MOUNTED BY THE MECHANICAL INSTALLER AND WIRING/CONDUIT BY ELECTRICAL INSTALLER.
<br />30. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
<br />OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
<br />31. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN THE SAME LIGHT
<br />FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN THE SAME FIXTURE.
<br />32. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING
<br />PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT MODIFICATIONS TO SUIT.
<br />33. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, CONTROLS
<br />AND VALVING.
<br />34. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND EXHAUST)
<br />CONNECTED TO AIR HANDLING UNITS AND FANS. FLEXIBLE CONNECTORS SHALL NOT BE PROVIDED AT FIRE LIFE SAFETY
<br />FANS INCLUDING BUT NOT LIMITED TO STAIRWELL PRESSURIZATION FANS AND SMOKE EVACUATION FANS.
<br />35. INDIVIDUAL RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED FIVE (5) FEET.
<br />36. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED, AND REQUIRED
<br />TO PROVIDE A VIBRATION FREE INSTALLATION.
<br />37. ALL EQUIPMENT ATTACHED AND ANCHORED PER THE APPLICABLE BUILDING CODE, MANUFACTURER'S
<br />INSTRUCTIONS AND STRUCTURAL DESIGN.
<br />38. PROVIDE VIBRATION ISOLATION DEVICES FOR ALL MECHANICAL EQUIPMENT TO PREVENT TRANSMISSION OF
<br />VIBRATION TO BUILDING STRUCTURE.
<br />39. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS, INCLUDING
<br />DIVIDED DUCTS AND TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST
<br />TO THE OWNER.
<br />40. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL FANS, SMOKE DETECTORS, FIRE
<br />DAMPERS, SMOKE DAMPERS, VOLUME DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THE
<br />DUCTWORK WHICH REQUIRE OPERATION, ADJUSTMENT AND MAINTENANCE.
<br />41. DUCT MOUNTED PHOTOELECTRIC SMOKE DETECTORS SHALL BE INSTALLED IN SUPPLY AND RETURN DUCTS FOR
<br />EACH HEATING OR COOLING SYSTEM SUPPLYING AIR IN EXCESS OF 2000 CFM (3400 CMH) AND IN SYSTEMS
<br />SERVING MORE THAN ONE OCCUPANCY TYPE. DETECTOR SHALL BE PROVIDED WITH METAL SAMPLING TUBE
<br />AND BE MOUNTED IN THE SUPPLY AIR DUCTWORK. DETECTOR SHALL SHUT DOWN THE AIR-MOVING
<br />EQUIPMENT WHEN SMOKE IS DETECTED. PROVIDE REMOTE TEST AND RESET STATION FOR MOUNTING AT
<br />THE CEILING OR WALL IN THE VICINITY OF THE SMOKE DETECTOR.
<br />42. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL INSTALLER. THE MECHANICAL
<br />INSTALLER SHALL BE RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK AS SHOWN ON
<br />THE DRAWINGS AND IN ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS.
<br />43. THE EXACT LOCATION AND SIZE OF EQUIPMENT PADS, ROOF OPENINGS, WALL OPENINGS, WALL/FLOOR
<br />PENETRATIONS, AND MOUNTING FRAMES SHALL BE COORDINATED IN THE FIELD WITH FINAL EQUIPMENT
<br />FURNISHED AND BUILDING CONSTRUCTION.
<br />44. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY. DETAILED DESCRIPTIONS ARE PROVIDED IN
<br />THE ARCHITECTURAL DOCUMENTS AND SHALL BE COORDINATED WITH GENERAL CONTRACTOR.
<br />45. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS'
<br />RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE CODES AND REGULATIONS.
<br />46. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL,
<br />ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.
<br />A. THIS BUILDING INVOLVES A NEW, FIFTEEN STORY HIGH-RISE RESIDENTIAL BUILDING WITH A TOTAL OF 170 RESIDENTIAL UNITS. A
<br />HIGH RISE TOWER SITS ON A SUBTERRANEAN PARKING GARAGE AND LEVEL 1 CORE AND SHELL RETAIL/RESTAURANT SPACES.
<br />B. THE DESIGN INCLUDES THE FOLLOWING NOTABLE FEATURES, BUT IS NOT LIMITED TO THIS SCOPE. CONTRACTOR
<br />IS RESPONSIBLE FOR REVIEWING ALL CONTRACT DOCUMENTS AND COORDINATING WITH ALL DISCIPLINES.
<br />1. COOLING/HEATING: AIR-SOURCE HEAT PUMP WITH VARIABLE REFRIGERANT FLOW (VRF) FAN COILS.
<br />2. CONTROLS: DIRECT DIGITAL BUILDING AUTOMATION SYSTEM (BAS) TO OPERATE ALL SYSTEM FUNCTIONS AND SCHEDULES.
<br />3. ZONING OF VRF SYSTEM TO MAINTAIN REFRIGERANT VOLUME WITHIN INDIVIDUAL ROOMS WITHIN ASHRAE STANDARD 15
<br />LIMITS. NO EXCEPTIONS WILL BE TAKEN TO THIS RULE.
<br />C. CODES AND STANDARDS (LATEST EDITIONS UNLESS OTHERWISE REQUIRED BY AHJ)
<br />1. AMERICANS WITH DISABILITIES ACT (ADA)
<br />2. NFPA 90A: STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS.
<br />3. NFPA 90B: STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS.
<br />5. NFPA 101: LIFE SAFETY CODE.
<br />6. ASHRAE HANDBOOK, FUNDAMENTALS
<br />7. ASHRAE HANDBOOK, REFRIGERATION.
<br />8. ASHRAE HANDBOOK, HVAC APPLICATIONS.
<br />9. ASHRAE HANDBOOK, HVAC SYSTEMS AND EQUIPMENT.
<br />10. ASHRAE 55 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY.
<br />11. ASHRAE 62.1 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY.
<br />12. ASHRAE 90.1 ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS.
<br />13. CALIFORNIA BUILDING CODES ENFORCED BY THE AUTHORITY HAVING JURISDICTION (AHJ):
<br />A) 2019 CALIFORNIA BUILDING CODE (CBC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 2 (2018
<br />INTERNATIONAL BUILDING CODE WITH STATE AND LOCAL AMENDMENTS).
<br />B) 2019 CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 4
<br />(2018 UNIFORM MECHANICAL CODE (UMC) WITH STATE AND LOCAL AMENDMENTS).
<br />C) 2019 CALIFORNIA PLUMBING CODE (CPC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 5 (2018
<br />UNIFORM PLUMBING CODE (UPC) WITH STATE AND LOCAL AMENDMENTS).
<br />D) 2019 CALIFORNIA FIRE CODE (CFC), CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 9 (2018
<br />INTERNATIONAL FIRE CODE WITH STATE AND LOCAL AMENDMENTS).
<br />E) 2019 CALIFORNIA ELECTRIC CODE (CEC) (2018 NATIONAL ELECTRICAL CODE WITH STATE AND LOCAL
<br />AMENDMENTS).
<br />F) 2019 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARD FOR RESIDENTIAL AND NONRESIDENTIAL
<br />BUILDINGS, CALIFORNIA CODE OF REGULATIONS, TITLE-24, PART 6.
<br />G) 2019 CALIFORNIA GREEN BUILDING STANDARDS CODE, CALIFORNIA CODE OF REGULATIONS, TITLE-24,
<br />PART 11.
<br />D. OUTDOOR DESIGN CONDITIONS:
<br />1. LOCATION: SANTA ANA, CA
<br />2. SUMMER: 91°F DB/68°F MCWB (TITLE24 0.5%)
<br />3. WINTER: 35°F (TITLE24 0.2%)
<br />4. ELEVATION: 115 FT.
<br />5. CLIMATE ZONE: 8
<br />E. INDOOR DESIGN CONDITIONS
<br />1. ALL CONDITIONED AREAS:
<br />A) COOLING: 75°F+/-2°F
<br />B) HEATING: 70°F +/-2°F
<br />2. EXCEPTIONS:
<br />A) ELEC. ROOMS: 85°F +/-2°F MAXIMUM
<br />B) DATA/TELECOM ROOMS: COOLING ONLY, 78°F +/- 2°F (MAXIMUM)
<br />C) ELEVATOR MACHINE ROOMS: COOLING ONLY, 85°F +/- 2°F (MAXIMUM)
<br />D) TRASH ROOMS: 85°F +/-2°F MAXIMUM
<br />E) GROUND FLOOR MAIN TRASH ROOM: 75°F +/-2°F MAXIMUM
<br />3. HUMIDITY CONTROL
<br />A) ALL AREAS, UNLESS OTHERWISE NOTED: NONE
<br />F. CALIFORNIA VENTILATION CRITERIA:
<br />1. ALL AREAS: 15 CFM/PERSON OR 0.15 CFM/SQ.FT., WHICHEVER IS GREATER.
<br />2. COMPLY WITH CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARD.
<br />3. COMPLY WITH CHAPTER 4 OF CMC, CHAPTER 12 OF CBC AND ASHRAE 62.1.
<br />4. ENCLOSED PARKING GARAGE: COMPLY WITH CHAPTER 4 OF CMC.
<br />5. NO PROVISIONS WILL BE PROVIDED FOR OSA RATES ABOVE CODE MINIMUM.
<br />G. EXHAUST TO OUTDOORS (MINIMUM RATES)
<br />1. TOILET ROOMS: 12 AIR CHANGES PER HOUR OR 50 CFM/FIXTURE, WHICHEVER IS GREATER. PRIVATE RESIDENTIAL
<br />RESTROOMS WILL BE LIMITED TO 50 CFM MAX.
<br />2. JANITOR CLOSET: 100 CFM OR 10 AIR CHANGES PER HOUR, WHICHEVER IS GREATER.
<br />3. SHOWER ROOMS: 12 AIR CHANGES PER HOUR
<br />4. MAIN TRASH ROOMS: 1 CFM/SQ.FT.
<br />H. BUILDING ENVELOPE
<br />1. GLAZING: GLASS/FRAME COMBINATION
<br />A) GROUND LEVEL:
<br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME
<br />2) U= 0.44 (ASSEMBLY)
<br />3) SOLAR HEAT GAIN COEFFICIENT (SHGC) = 0.32 (ASSEMBLY)
<br />A) PODIUM:
<br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME
<br />2) U= 0.44 (ASSEMBLY)
<br />3) SOLAR HEAT GAIN COEFFICIENT (SHGC) = 0.31 (ASSEMBLY)
<br />B) TOWER:
<br />1) DESCRIPTION: LOW-E IGU, CLEAR, AND THERMAL BREAK FRAME
<br />2) U= 0.45 (ASSEMBLY)
<br />3) SHGC = 0.28 (ASSEMBLY)
<br />2. WALL CONSTRUCTION:
<br />A) EXTERIOR WALLS:
<br />1) DESCRIPTION: METAL FRAMED
<br />2) U= 0.15
<br />3. ROOF CONSTRUCTION:
<br />A) STRUCTURE: R40 CONTINUOUS INSULATION OVER CONCRETE DECK
<br />B) OVERALL U-VALUE = 0.047
<br />C) REFLECTIVITY: MAX 78% AGED
<br />4. EXTERIOR FLOOR:
<br />A) DESCRIPTION: CONCRETE SLAB
<br />B) U=0.269
<br />I. INTERNAL HEAT GAINS
<br />1. LIGHTING:
<br />A) OFFICE: 1.0 W/SF
<br />B) LOBBY: 1.3 W/SF
<br />C) CORRIDOR: 0.7 W/SF
<br />D) RESTROOM: 0.7 W/SF
<br />E) RETAIL: 1.3 W/SF
<br />F) FITNESS CENTER: 1.0 W/SF
<br />G) RESIDENTIAL UNITS: 0.5 W/SF
<br />2. RECEPTACLE POWER IN OFFICES AREAS: 1.5 W/SF
<br />3. ELECTRICAL TRANSFORMERS: 3.5% LOSS
<br />4. ELEVATOR MACHINE ROOMS: SEE PLANS FOR BTUH
<br />5. OCCUPANCY CRITERIA IN CALIFORNIA:
<br />A) OFFICE OCCUPANT: 250 BTUH SENSIBLE/200 BTUH LATENT
<br />B) OFFICE: 1 PERSON/100 SF
<br />C) FITNESS CENTER: 1 PERSON/20 SF
<br />D) STREET LEVEL RETAIL AREA: 1 PERSON/30 SF
<br />E) LOBBY: 1 PERSON/15 SF
<br />F) DINING: 1 PERSON/10 SF
<br />6. ZONING CRITERIA
<br />A) ELECTRICAL ROOMS: ONE ZONE (TEMPERATURE SENSOR) PER ROOM
<br />B) DINING: ONE ZONE (TEMPERATURE SENSOR) PER DINING AREA, ONE ZONE (TEMPERATURE SENSOR) PER KITCHEN
<br />C) LOBBY: ONE ZONE (TEMPERATURE SENSOR)
<br />D) AMENITY ROOMS (EXERCISE, LOUNGE, ETC.): ONE ZONE (TEMPERATURE SENSOR) PER ROOM
<br />E) RESIDENTIAL UNITS: ONE ZONE (THERMOSTAT) PER ROOM
<br />J. DUCTWORK DESIGN CRITERIA (MAXIMUM ALLOWABLE AIR PRESSURE DROPS AND AIR VELOCITIES) TO MEET HIGH
<br />EFFICIENCY OPERATION WITH MINIMAL ACOUSTICAL NOISE. DUCT STATIC PRESSURE FRICTION LOSS SHALL NOT
<br />EXCEED 0.2" PER 100 FEET IN MECHANICAL ROOMS AND SHAFTS. LOW PRESSURE SUPPLY DUCT STATIC
<br />PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.08" PER 100 FEET. LOW PRESSURE RETURN AND EXHAUST
<br />DUCT STATIC PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.06" PER 100 FEET. MEDIUM PRESSURE
<br />DUCTWORK SHALL NOT EXCEED A DUCT STATIC PRESSURE FRICTION LOSS BASED ON A MAXIMUM OF 0.1" PER 100
<br />FEET.
<br />1. IN ADDITION, MAXIMUM SUPPLY, RETURN AND EXHAUST DUCT AIR FLOW VELOCITIES, REGARDLESS OF
<br />PRESSURE DROP, SHALL NOT EXCEED THE FOLLOWING CRITERIA:
<br />A) MAINS ABOVE CEILING: 1750 FPM
<br />B) MAINS ABOVE OPEN OCCUPIED SPACES: 1450 FPM
<br />C) BRANCHES ABOVE CEILING: 1400 FPM
<br />D) BRANCHES ABOVE OPEN OCCUPIED SPACES: 1150 FPM
<br />E) RUN-OUTS TO DIFFUSERS: 725 FPM
<br />F) IN SHAFTS: 2500 FPM
<br />G) IN MECHANICAL ROOMS: 3000 FPM
<br />2. GREASE EXHAUST DUCT SHALL RANGE FROM 500 FPM IN VAV SYSTEMS (MINIMUM) TO MAXIMUM 2500 FPM
<br />VELOCITY.
<br />K. ACOUSTICAL
<br />1. THE FOLLOWING NOISE NC/RC CRITERIA LEVELS WILL BE ACHIEVED AND AS DEFINED IN THE ASHRAE HVAC
<br />APPLICATIONS HANDBOOK. THESE LEVELS ADDRESS THE MECHANICAL SYSTEMS ONLY. ACTUAL SOUND
<br />PERFORMANCE REQUIREMENTS FOR EACH SPACE MUST BE VERIFIED WITH ACOUSTICAL CONSULTANT.
<br />A) OFFICES: 35
<br />B) MEETING/FUNCTION ROOM: 30
<br />C) BAR/RESTAURANT/PANTRY: 40
<br />D) LOBBY/RECEPTION/CORRIDOR: 35
<br />E) RESIDENTIAL UNIT: 30
<br />F) RESIDENTIAL BATHROOM: 35
<br />G) PUBLIC RESTROOM: 40
<br />H) DINING: 35
<br />I) FITNESS: 40
<br />J) STAFF RESTROOM/CHANGING: 45
<br />K) BOH/SERVICE AREAS: 50
<br />2. ROOFTOP CONDENSING UNITS: EQUIPMENT MOUNTING WITH STEEL SUPPORTS INCLUDING NEOPRENE MOUNTS (MASON
<br />INDUSTRIES TYPE BR HAVING 0.2" OF STATIC DEFLECTION) ON THE EQUIPMENT AND ISOLATION FOR THE REFRIGERANT
<br />PIPING.
<br />3. SUPPLY AND EXHAUST SYSTEMS: IF A SHAFT IS WITHIN 40 FEET OF A PROPERTY LINE, THE ASSOCIATED FAN MUST HAVE A
<br />SOUND TRAP THAT HAS THE ABILITY TO REDUCE SOUND LEVEL AT 125 HZ BY 13 DB.
<br />4. GRILLES, REGISTERS AND DIFFUSERS: NC-20 WITHIN RESIDENTIAL UNITS, NC-30 IN THE REMAINDER OF THE PUBLIC AREAS.
<br />5. TOILET EXHAUST FANS: MAX SONE LEVEL OF 1.5 SONES.
<br />L. SEISMIC:
<br />1. ANCHORAGE AND RESTRAINTS MUST BE COORDINATED WITH STRUCTURAL ENGINEER AND AUTHORITY
<br />HAVING JURISDICTION. ALL SEISMIC RESTRAINTS SHALL BE A DELEGATED DESIGN.
<br />M. CONTROLS
<br />1. ALL MAJOR MECHANICAL EQUIPMENT SHALL INTEGRATE WITH THE BUILDING BAS TO MONITOR AND CONTROL OPERATION.
<br />N. THE HVAC SYSTEM INCLUDES THE FOLLOWING SUSTAINABLE DESIGN FEATURES:
<br />1. SELECT REFRIGERANTS AND HVAC EQUIPMENT THAT MINIMIZE AND ELIMINATE THE EMISSION OF
<br />COMPOUNDS THAT CONTRIBUTE TO OZONE DEPLETION.
<br />2. PROVIDE INDOOR AIR QUANTITIES TO MEET MINIMUM REQUIREMENTS OF SECTIONS 4 THROUGH 7 OF
<br />ASHRAE STANDARD 62.1-2016.
<br />3. INSTALL PERMANENT CARBON MONOXIDE AND AIR QUALITY MONITORING SYSTEMS TO ENSURE THAT VENTILATION SYSTEMS
<br />MAINTAIN DESIGN MINIMUM REQUIREMENTS.
<br />4. USE VARIABLE FREQUENCY DRIVES TO OPERATE FANS AND PUMPS.
<br />5. UTILIZE HEAT RECOVERY IN THE VRF SYSTEM.
<br />1
<br />06.13.2022 ISSUE FOR PLAN CHECK
<br />1 06.17.2024 REVISION TO PERMIT
<br />1/15/2025
|