Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 3200 - 1 <br />ed. 2023-09-22 <br />SECTION 01 3200 - CONSTRUCTION PROGRESS DOCUMENTATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions <br />and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes administrative and procedural requirements for documenting the progress of <br />construction during performance of the Work, including the following: <br />1.Startup construction schedule. <br />2.Contractor's Construction Schedule. <br />3.Construction schedule updating reports. <br />4.Daily construction reports. <br />5.Material location reports. <br />6.Site condition reports. <br />7.Unusual event reports. <br />B.Related Requirements: <br />1.Section 01 1000 "Summary" for preparing a combined Contractor's Construction Schedule with <br />concurrent work performed under Owner’s and other contracts. <br />1.3 INFORMATIONAL SUBMITTALS <br />A.Format for Submittals: Submit required submittals in the following format: <br />1.Working electronic copy of schedule file, where indicated. <br />2.PDF file. <br />B.Startup construction schedule. <br />1.Submittal of cost-loaded, startup construction schedule will not constitute approval of schedule <br />of values for cost-loaded activities. <br />C.Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for <br />entire construction period. <br />D.Construction Schedule Updating Reports: Submit with Applications for Payment. <br />E.Daily Construction Reports: Submit at weekly intervals.