My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />CONSTRUCTION PROGRESS DOCUMENTATION 01 3200 - 1 <br />ed. 2023-09-22 <br />SECTION 01 3200 - CONSTRUCTION PROGRESS DOCUMENTATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions <br />and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes administrative and procedural requirements for documenting the progress of <br />construction during performance of the Work, including the following: <br />1.Startup construction schedule. <br />2.Contractor's Construction Schedule. <br />3.Construction schedule updating reports. <br />4.Daily construction reports. <br />5.Material location reports. <br />6.Site condition reports. <br />7.Unusual event reports. <br />B.Related Requirements: <br />1.Section 01 1000 "Summary" for preparing a combined Contractor's Construction Schedule with <br />concurrent work performed under Owner’s and other contracts. <br />1.3 INFORMATIONAL SUBMITTALS <br />A.Format for Submittals: Submit required submittals in the following format: <br />1.Working electronic copy of schedule file, where indicated. <br />2.PDF file. <br />B.Startup construction schedule. <br />1.Submittal of cost-loaded, startup construction schedule will not constitute approval of schedule <br />of values for cost-loaded activities. <br />C.Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for <br />entire construction period. <br />D.Construction Schedule Updating Reports: Submit with Applications for Payment. <br />E.Daily Construction Reports: Submit at weekly intervals.
The URL can be used to link to this page
Your browser does not support the video tag.