Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SUBMITTAL PROCEDURES 01 3300 - 1 <br />ed. 2023-09-22 <br />SECTION 01 3300 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A.Section Includes: <br />1.Submittal schedule requirements. <br />2.Administrative and procedural requirements for submittals. <br />B.Related Requirements: <br />1.Section 01 3100 "Project Management and Coordination" for submitting coordination drawings <br />and subcontract list and for requirements for web-based Project software. <br />2.Section 01 4000 "Quality Requirements" for submitting test and inspection reports, and <br />schedule of tests and inspections. <br />3.Section 01 7700 "Closeout Procedures" for submitting closeout submittals and maintenance <br />material submittals. <br />4.Section 01 7823 "Operation and Maintenance Data" for submitting operation and maintenance <br />manuals. <br />5.Section 01 7839 "Project Record Documents" for submitting record Drawings, record <br />Specifications, and record Product Data. <br />6.Section 01 7900 "Demonstration and Training" for submitting video recordings of <br />demonstration of equipment and training of Owner's personnel. <br />1.2 DEFINITIONS <br />A.Action Submittals: Written and graphic information and physical samples that require Architect's <br />responsive action. Action submittals are those submittals indicated in individual Specification <br />Sections as "action submittals." <br />B.Informational Submittals: Written and graphic information and physical samples that do not require <br />Architect's responsive action. Submittals may be rejected for not complying with requirements. <br />Informational submittals are those submittals indicated in individual Specification Sections as <br />"informational submittals." <br />1.3 SUBMITTAL SCHEDULE <br />A.Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological <br />order by dates required by construction schedule. Include time required for review, ordering, <br />manufacturing, fabrication, and delivery when establishing dates. Include additional time required for <br />making corrections or revisions to submittals noted by Architect and additional time for handling and <br />reviewing submittals required by those corrections.