My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SUBMITTAL PROCEDURES 01 3300 - 2 <br />ed. 2023-09-22 <br />1.Coordinate submittal schedule with list of subcontracts, the schedule of values, and <br />Contractor's construction schedule. <br />2.Initial Submittal Schedule: Submit concurrently with startup construction schedule. Include <br />submittals required during the first 60 days of construction. List those submittals required to <br />maintain orderly progress of the Work and those required early because of long lead time for <br />manufacture or fabrication. <br />3.Final Submittal Schedule: Submit concurrently with the first complete submittal of Contractor's <br />construction schedule. <br />a.Submit revised submittal schedule as required to reflect changes in current status and <br />timing for submittals. <br />4.Format: Arrange the following information in a tabular format: <br />a.Scheduled date for first submittal. <br />b.Specification Section number and title. <br />c.Submittal Category: Action; informational. <br />d.Name of subcontractor. <br />e.Description of the Work covered. <br />f.Scheduled date for Architect's final release or approval. <br />g.Scheduled dates for purchasing. <br />h.Scheduled date of fabrication. <br />i.Scheduled dates for installation. <br />j.Activity or event number. <br />1.4 SUBMITTAL FORMATS <br />A.Submittal Information: Include the following information in each submittal: <br />1.Project name. <br />2.Date. <br />3.Name of Architect. <br />4.Name of Contractor. <br />5.Name of firm or entity that prepared submittal. <br />6.Names of subcontractor, manufacturer, and supplier. <br />7.Unique submittal number, including revision identifier. Include Specification Section number <br />with sequential alphanumeric identifier and alphanumeric suffix for resubmittals. <br />8.Category and type of submittal. <br />9.Submittal purpose and description. <br />10.Number and title of Specification Section, with paragraph number and generic name for each <br />of multiple items. <br />11.Drawing number and detail references, as appropriate. <br />12.Indication of full or partial submittal. <br />13.Location(s) where product is to be installed, as appropriate. <br />14.Other necessary identification. <br />15.Remarks. <br />16.Signature of transmitter.
The URL can be used to link to this page
Your browser does not support the video tag.