My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SUBMITTAL PROCEDURES 01 3300 - 4 <br />ed. 2023-09-22 <br />1.Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if <br />coordination with subsequent submittals is required. Architect will advise Contractor when a <br />submittal being processed must be delayed for coordination. <br />2.Intermediate Review: If intermediate submittal is necessary, process it in same manner as <br />initial submittal. <br />3.Resubmittal Review: Allow 15 days for review of each resubmittal. <br />E.Resubmittals: Make resubmittals in same form and number of copies as initial submittal. <br />1.Note date and content of previous submittal. <br />2.Note date and content of revision in label or title block, and clearly indicate extent of revision. <br />3.Resubmit submittals until they are marked with approval notation from Architect's action <br />stamp. <br />F.Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, <br />fabricators, installers, authorities having jurisdiction, and others as necessary for performance of <br />construction activities. Show distribution on transmittal forms. <br />G.Use for Construction: Retain complete copies of submittals on Project site. Use only final action <br />submittals that are marked with approval notation from Architect's action stamp. <br />1.6 SUBMITTAL REQUIREMENTS <br />A.Product Data: Collect information into a single submittal for each element of construction and type of <br />product or equipment. <br />1.If information must be specially prepared for submittal because standard published data are <br />unsuitable for use, submit as Shop Drawings, not as Product Data. <br />2.Mark each copy of each submittal to show which products and options are applicable. <br />3.Include the following information, as applicable: <br />a.Manufacturer's catalog cuts. <br />b.Manufacturer's product specifications. <br />c.Standard color charts. <br />d.Statement of compliance with specified referenced standards. <br />e.Testing by recognized testing agency. <br />f.Application of testing agency labels and seals. <br />g.Notation of coordination requirements. <br />h.Availability and delivery time information. <br />4.For equipment, include the following in addition to the above, as applicable: <br />a.Wiring diagrams that show factory-installed wiring. <br />b.Printed performance curves. <br />c.Operational range diagrams. <br />d.Clearances required to other construction, if not indicated on accompanying Shop <br />Drawings.
The URL can be used to link to this page
Your browser does not support the video tag.