Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SUBMITTAL PROCEDURES 01 3300 - 3 <br />ed. 2023-09-22 <br />B.Options: Identify options requiring selection by Architect. <br />C.Deviations and Additional Information: On each submittal, clearly indicate deviations from <br />requirements in the Contract Documents, including minor variations and limitations; include relevant <br />additional information and revisions, other than those requested by Architect on previous submittals. <br />Indicate by highlighting on each submittal or noting on attached separate sheet. <br />D.Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into <br />each PDF file. Name PDF file with submittal number. <br />E.Submittals Utilizing Web-Based Project Software: Prepare submittals as PDF files or other format <br />indicated by Project management software. <br />1.5 SUBMITTAL PROCEDURES <br />A.Prepare and submit submittals required by individual Specification Sections. Types of submittals are <br />indicated in individual Specification Sections. <br />1.Web-Based Project Management Software: Prepare submittals in PDF form, and upload to <br />web-based Project management software website. Enter required data in web-based software <br />site to fully identify submittal. <br />B.Fill out and attach completed “Submittal Cover Sheet” to each submittal before posting. Refer to <br />Section 01 3300.10 “Submittal Cover Sheet” included in this Project Manual. <br />C.Coordination: Coordinate preparation and processing of submittals with performance of construction <br />activities. <br />1.Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and <br />related activities that require sequential activity. <br />2.Submit all submittal items required for each Specification Section concurrently unless partial <br />submittals for portions of the Work are indicated on approved submittal schedule. <br />3.Submit action submittals and informational submittals required by the same Specification <br />Section as separate packages under separate transmittals. <br />4.Coordinate transmittal of submittals for related parts of the Work specified in different <br />Sections, so processing will not be delayed because of need to review submittals concurrently <br />for coordination. <br />a.Architect reserves the right to withhold action on a submittal requiring coordination <br />with other submittals until related submittals are received. <br />D.Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time <br />for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will <br />be authorized because of failure to transmit submittals enough in advance of the Work to permit <br />processing, including resubmittals.