My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SUBMITTAL PROCEDURES 01 3300 - 3 <br />ed. 2023-09-22 <br />B.Options: Identify options requiring selection by Architect. <br />C.Deviations and Additional Information: On each submittal, clearly indicate deviations from <br />requirements in the Contract Documents, including minor variations and limitations; include relevant <br />additional information and revisions, other than those requested by Architect on previous submittals. <br />Indicate by highlighting on each submittal or noting on attached separate sheet. <br />D.Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into <br />each PDF file. Name PDF file with submittal number. <br />E.Submittals Utilizing Web-Based Project Software: Prepare submittals as PDF files or other format <br />indicated by Project management software. <br />1.5 SUBMITTAL PROCEDURES <br />A.Prepare and submit submittals required by individual Specification Sections. Types of submittals are <br />indicated in individual Specification Sections. <br />1.Web-Based Project Management Software: Prepare submittals in PDF form, and upload to <br />web-based Project management software website. Enter required data in web-based software <br />site to fully identify submittal. <br />B.Fill out and attach completed “Submittal Cover Sheet” to each submittal before posting. Refer to <br />Section 01 3300.10 “Submittal Cover Sheet” included in this Project Manual. <br />C.Coordination: Coordinate preparation and processing of submittals with performance of construction <br />activities. <br />1.Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and <br />related activities that require sequential activity. <br />2.Submit all submittal items required for each Specification Section concurrently unless partial <br />submittals for portions of the Work are indicated on approved submittal schedule. <br />3.Submit action submittals and informational submittals required by the same Specification <br />Section as separate packages under separate transmittals. <br />4.Coordinate transmittal of submittals for related parts of the Work specified in different <br />Sections, so processing will not be delayed because of need to review submittals concurrently <br />for coordination. <br />a.Architect reserves the right to withhold action on a submittal requiring coordination <br />with other submittals until related submittals are received. <br />D.Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time <br />for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will <br />be authorized because of failure to transmit submittals enough in advance of the Work to permit <br />processing, including resubmittals.
The URL can be used to link to this page
Your browser does not support the video tag.