Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />QUALITY REQUIREMENTS 01 4000 - 4 <br />ed. 2023-09-22 <br />1. Specification Section number and title. <br />2. Entity responsible for performing tests and inspections. <br />3. Description of test and inspection. <br />4. Identification of applicable standards. <br />5. Identification of test and inspection methods. <br />6. Number of tests and inspections required. <br />7. Time schedule or time span for tests and inspections. <br />8. Requirements for obtaining samples. <br />9. Unique characteristics of each quality-control service. <br />F. Reports: Prepare and submit certified written reports and documents as specified. <br />G. Permits, Licenses, and Certificates: For Owner's record, submit copies of permits, licenses, <br />certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee <br />payments, judgments, correspondence, records, and similar documents established for <br />compliance with standards and regulations bearing on performance of the Work. <br />1.7 CONTRACTOR'S QUALITY-CONTROL PLAN <br />A. Quality-Control Plan, General: Submit quality-control plan within ten (10) days of Notice to <br />Proceed, and not less than five (5) days prior to preconstruction conference. Submit in format <br />acceptable to Architect. Identify personnel, procedures, controls, instructions, tests, records, and <br />forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities. <br />Coordinate with Contractor's Construction Schedule. <br />B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced <br />in managing and executing quality-assurance and quality-control procedures similar in nature <br />and extent to those required for Project. <br />1. Project quality-control manager may also serve as Project superintendent. <br />C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through <br />review and management of submittal process. Indicate qualifications of personnel responsible <br />for submittal review. <br />D. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work <br />requiring testing or inspection, including the following: <br />1. Contractor-performed tests and inspections including Subcontractor-performed tests and <br />inspections. Include required tests and inspections and Contractor-elected tests and <br />inspections. Distinguish source quality-control tests and inspections from field quality- <br />control tests and inspections.