My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />QUALITY REQUIREMENTS 01 4000 - 5 <br />ed. 2023-09-22 <br />2. Special inspections required by authorities having jurisdiction and indicated on the <br />Statement of Special Inspections. <br />3. Owner-performed tests and inspections indicated in the Contract Documents. <br />E. Continuous Inspection of Workmanship: Describe process for continuous inspection during <br />construction to identify and correct deficiencies in workmanship in addition to testing and <br />inspection specified. Indicate types of corrective actions to be required to bring work into <br />compliance with standards of workmanship established by Contract requirements and approved <br />mockups. <br />F. Monitoring and Documentation: Maintain testing and inspection reports including log of <br />approved and rejected results. Include work Architect has indicated as nonconforming or <br />defective. Indicate corrective actions taken to bring nonconforming work into compliance with <br />requirements. Comply with requirements of authorities having jurisdiction. <br />1.8 REPORTS AND DOCUMENTS <br />A. Test and Inspection Reports: Prepare and submit certified written reports specified in other <br />Sections. Include the following: <br />1. Date of issue. <br />2. Project title and number. <br />3. Name, address, telephone number, and email address of testing agency. <br />4. Dates and locations of samples and tests or inspections. <br />5. Names of individuals making tests and inspections. <br />6. Description of the Work and test and inspection method. <br />7. Identification of product and Specification Section. <br />8. Complete test or inspection data. <br />9. Test and inspection results and an interpretation of test results. <br />10. Record of temperature and weather conditions at time of sample taking and testing and <br />inspection. <br />11. Comments or professional opinion on whether tested or inspected Work complies with <br />the Contract Document requirements. <br />12. Name and signature of laboratory inspector. <br />13. Recommendations on retesting and reinspecting. <br />B. Manufacturer's Technical Representative's Field Reports: Prepare written information <br />documenting manufacturer's technical representative's tests and inspections specified in other <br />Sections. Include the following: <br />1. Name, address, telephone number, and email address of technical representative making <br />report. <br />2. Statement on condition of substrates and their acceptability for installation of product. <br />3. Statement that products at Project site comply with requirements.
The URL can be used to link to this page
Your browser does not support the video tag.