My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />PRODUCT REQUIREMENTS 01 6000 - 3 <br />ed. 2023-09-22 <br />1. Labels: Locate required product labels and stamps on a concealed surface, or, where <br />required for observation following installation, on a visually accessible surface that is not <br />conspicuous. <br />2. Equipment Nameplates: Provide a permanent nameplate on each item of service- <br />connected or power-operated equipment. Locate on a visually accessible but <br />inconspicuous surface. Include information essential for operation, including the <br />following: <br />a. Name of product and manufacturer. <br />b. Model and serial number. <br />c. Capacity. <br />d. Speed. <br />e. Ratings. <br />3. See individual identification sections in Divisions 21, 22, 23, and 26 for additional <br />identification requirements. <br />1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING <br />A. Deliver, store, and handle products using means and methods that will prevent damage, <br />deterioration, and loss, including theft and vandalism. Comply with manufacturer's written <br />instructions. <br />B. Delivery and Handling: <br />1. Schedule delivery to minimize long-term storage at Project site and to prevent <br />overcrowding of construction spaces. <br />2. Coordinate delivery with installation time to ensure minimum holding time for items that <br />are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other <br />losses. <br />3. Deliver products to Project site in an undamaged condition in manufacturer's original <br />sealed container or other packaging system, complete with labels and instructions for <br />handling, storing, unpacking, protecting, and installing. <br />4. Inspect products on delivery to determine compliance with the Contract Documents and <br />to determine that products are undamaged and properly protected. <br />C. Storage: <br />1. Store products to allow for inspection and measurement of quantity or counting of units. <br />2. Store materials in a manner that will not endanger Project structure. <br />3. Store products that are subject to damage by the elements, under cover in a weathertight <br />enclosure above ground, with ventilation adequate to prevent condensation. <br />4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of <br />installation and concealment. <br />5. Comply with product manufacturer's written instructions for temperature, humidity, <br />ventilation, and weather-protection requirements for storage. <br />6. Protect stored products from damage and liquids from freezing.
The URL can be used to link to this page
Your browser does not support the video tag.