Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 1 <br />ed. 2023-09-22 <br />SECTION 01 7300 - EXECUTION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions and <br />other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes general administrative and procedural requirements governing execution of the Work <br />including, but not limited to, the following: <br />1.Construction layout. <br />2.Field engineering and surveying. <br />3.Installation of the Work. <br />4.Cutting and patching. <br />5.Coordination of Owner-installed products. <br />6.Progress cleaning. <br />7.Starting and adjusting. <br />8.Protection of installed construction. <br />B.Related Requirements: <br />1.Section 01 1000 "Summary" for limits on use of Project site. <br />2.Section 01 3300 "Submittal Procedures" for submitting surveys. <br />3.Section 01 7700 "Closeout Procedures" for submitting final property survey with Project Record <br />Documents, recording of Owner-accepted deviations from indicated lines and levels, replacing <br />defective work, and final cleaning. <br />4.Section 02 4119.16 "Selective Interior Demolition" for demolition and removal of selected <br />portions of the building. <br />5.Section 07 8413 "Penetration Firestopping" for patching penetrations in fire-rated construction. <br />1.3 QUALITY ASSURANCE <br />1.Structural Elements: When cutting and patching structural elements, notify Architect of locations <br />and details of cutting and await directions from Architect before proceeding. Shore, brace, and <br />support structural elements during cutting and patching. Do not cut and patch structural elements <br />in a manner that could change their load-carrying capacity or increase deflection.