My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 2 <br />ed. 2023-09-22 <br />2.Operational Elements: Do not cut and patch operating elements and related components in a <br />manner that results in reducing their capacity to perform as intended or that results in increased <br />maintenance or decreased operational life or safety. <br />a.Primary operational systems and equipment. <br />b.Fire separation assemblies. <br />c.Air or smoke barriers. <br />d.Fire-suppression systems. <br />e.Plumbing piping systems. <br />f.Mechanical systems piping and ducts. <br />g.Control systems. <br />h.Communication systems. <br />i.Fire-detection and -alarm systems. <br />j.Conveying systems. <br />k.Electrical wiring systems. <br />l.Operating systems of special construction. <br />3.Other Construction Elements: Do not cut and patch other construction elements or components in <br />a manner that could change their load-carrying capacity, that results in reducing their capacity to <br />perform as intended, or that results in increased maintenance or decreased operational life or <br />safety. <br />4.Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of <br />cutting and patching. Do not cut and patch exposed construction in a manner that would, in <br />Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction <br />that has been cut and patched in a visually unsatisfactory manner. <br />B.Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written <br />recommendations and instructions for installation of products and equipment. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A.General: Comply with requirements specified in other Sections. <br />1.For projects requiring compliance with sustainable design and construction practices and <br />procedures, use products for patching that comply with sustainable design requirements. <br />B.In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use <br />materials that visually match in-place adjacent surfaces to the fullest extent possible. <br />1.If identical materials are unavailable or cannot be used, use materials that, when installed, will <br />provide a match acceptable to Architect for the visual and functional performance of in-place <br />materials.
The URL can be used to link to this page
Your browser does not support the video tag.