My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 6 <br />ed. 2023-09-22 <br />D.Protection: Protect in-place construction during cutting and patching to prevent damage. Provide <br />protection from adverse weather conditions for portions of Project that might be exposed during cutting <br />and patching operations. <br />E.Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage <br />to adjoining areas is unavoidable, coordinate cutting and patching according to requirements in <br />Section 01 1000 "Summary." <br />F.Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar <br />operations, including excavation, using methods least likely to damage elements retained or adjoining <br />construction. If possible, review proposed procedures with original Installer; comply with original <br />Installer's written recommendations. <br />1.In general, use hand or small power tools designed for sawing and grinding, not hammering and <br />chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of <br />adjacent surfaces. Temporarily cover openings when not in use. <br />2.Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. <br />3.Concrete and/or Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond- <br />core drill. <br />4.Excavating and Backfilling: Comply with requirements in applicable Sections where required by <br />cutting and patching operations. <br />5.Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be removed. <br />Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture <br />or other foreign matter after cutting. <br />6.Proceed with patching after construction operations requiring cutting are complete. <br />G.Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations <br />following performance of other work. Patch with durable seams that are as invisible as practicable. <br />Provide materials and comply with installation requirements specified in other Sections, where <br />applicable. <br />1.Inspection: Where feasible, test and inspect patched areas after completion to demonstrate <br />physical integrity of installation. <br />2.Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into <br />retained adjoining construction in a manner that will minimize evidence of patching and <br />refinishing. <br />a.Clean piping, conduit, and similar features before applying paint or other finishing <br />materials. <br />b.Restore damaged pipe covering to its original condition. <br />3.Floors and Walls: Where walls or partitions that are removed extend one finished area into <br />another, patch and repair floor and wall surfaces in the new space. Provide an even surface of <br />uniform finish, color, texture, and appearance. Remove in-place floor and wall coverings and <br />replace with new materials, if necessary, to achieve uniform color and appearance. <br />a.Where patching occurs in a painted surface, prepare substrate and apply primer and <br />intermediate paint coats appropriate for substrate over the patch, and apply final
The URL can be used to link to this page
Your browser does not support the video tag.