My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 7 <br />ed. 2023-09-22 <br />paint coat over entire unbroken surface containing the patch. Provide additional coats until <br />patch blends with adjacent surfaces. <br />4.Ceilings: Patch, repair, or rehang in-place ceilings as necessary to provide an even-plane surface <br />of uniform appearance. <br />5.Exterior Building Enclosure: Patch components in a manner that restores enclosure to a <br />weathertight condition and ensures thermal and moisture integrity of building enclosure. <br />H.Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, <br />putty, and similar materials from adjacent finished surfaces. <br />3.6 OWNER-INSTALLED PRODUCTS <br />A.Site Access: Provide access to Project site for Owner's construction personnel. <br />B.Coordination: Coordinate construction and operations of the Work with work performed by Owner's <br />construction personnel. <br />1.Construction Schedule: Inform Owner of Contractor's preferred construction schedule for <br />Owner's portion of the Work. Adjust construction schedule based on a mutually agreeable <br />timetable. Notify Owner if changes to schedule are required due to differences in actual <br />construction progress. <br />2.Preinstallation Conferences: Include Owner's construction personnel at pre-installation <br />conferences covering portions of the Work that are to receive Owner's work. Attend pre- <br />installation conferences conducted by Owner's construction personnel if portions of the Work <br />depend on Owner's construction. <br />3.7 PROGRESS CLEANING <br />A.General: Clean Project site and work areas daily, including common areas. Enforce requirements <br />strictly. Dispose of materials lawfully. <br />1.Comply with requirements in NFPA 241 for removal of combustible waste materials and debris. <br />2.Do not hold waste materials more than seven days during normal weather or three days if the <br />temperature is expected to rise above 80 deg. F. <br />3.Containerize hazardous and unsanitary waste materials separately from other waste. Mark <br />containers appropriately and dispose of legally, according to regulations. <br />a.Use containers intended for holding waste materials of type to be stored. <br />4.Coordinate progress cleaning for joint-use areas where Contractor and other contractors are <br />working concurrently. <br />B.Maintain Project free of waste materials and debris.
The URL can be used to link to this page
Your browser does not support the video tag.