Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 9 <br />ed. 2023-09-22 <br />3.9 PROTECTION OF INSTALLED CONSTRUCTION <br />A.Provide final protection and maintain conditions that ensure installed Work is without damage or <br />deterioration at time of Substantial Completion. <br />B.Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by <br />construction are maintained in condition that existed at commencement of the Work. <br />C.Comply with manufacturer's written instructions for temperature and relative humidity. <br />END OF SECTION 01 7300