Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXECUTION REQUIREMENTS 01 7300 - 8 <br />ed. 2023-09-22 <br />C.Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper <br />execution of the Work. <br />1.Remove liquid spills promptly. <br />2.Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work <br />area, as appropriate. <br />D.Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of <br />manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. <br />If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to <br />health or property and that will not damage exposed surfaces. <br />E.Concealed Spaces: Remove debris from concealed spaces before enclosing the space. <br />F.Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom <br />from damage and deterioration at time of Substantial Completion. <br />G.Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers <br />or into waterways. Comply with waste disposal requirements in Section 01 7419 "Construction Waste <br />Management and Disposal." <br />H.During handling and installation, clean and protect construction in progress and adjoining materials <br />already in place. Apply protective covering where required to ensure protection from damage or <br />deterioration at Substantial Completion. <br />I.Clean and provide maintenance on completed construction as frequently as necessary through the <br />remainder of the construction period. Adjust and lubricate operable components to ensure operability <br />without damaging effects. <br />J.Limiting Exposures: Supervise construction operations to ensure that no part of the construction, <br />completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure <br />during the construction period. <br />3.8 STARTING AND ADJUSTING <br />A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, <br />replace with new units, and retest. <br />B.Adjust equipment for proper operation. Adjust operating components for proper operation without <br />binding. <br />C.Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace <br />damaged and malfunctioning controls and equipment. <br />D.Manufacturer's Field Service: Comply with qualification requirements in Section 01 4000 "Quality <br />Requirements."