My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />DEMONSTRATION AND TRAINING 01 7900 - 3 <br />ed. 2023-09-22 <br />d.Regulatory requirements. <br />e.Equipment function. <br />f.Operating characteristics. <br />g.Limiting conditions. <br />h.Performance curves. <br />2.Documentation: Review the following items in detail: <br />a.Emergency manuals. <br />b.Systems and equipment operation manuals. <br />c.Systems and equipment maintenance manuals. <br />d.Product maintenance manuals. <br />e.Project Record Documents. <br />f.Identification systems. <br />g.Warranties and bonds. <br />h.Maintenance service agreements and similar continuing commitments. <br />3.Emergencies: Include the following, as applicable: <br />a.Instructions on meaning of warnings, trouble indications, and error messages. <br />b.Instructions on stopping. <br />c.Shutdown instructions for each type of emergency. <br />d.Operating instructions for conditions outside of normal operating limits. <br />e.Sequences for electric or electronic systems. <br />f.Special operating instructions and procedures. <br />4.Operations: Include the following, as applicable: <br />a.Startup procedures. <br />b.Equipment or system break-in procedures. <br />c.Routine and normal operating instructions. <br />d.Regulation and control procedures. <br />e.Control sequences. <br />f.Safety procedures. <br />g.Instructions on stopping. <br />h.Normal shutdown instructions. <br />i.Operating procedures for emergencies. <br />j.Operating procedures for system, subsystem, or equipment failure. <br />k.Seasonal and weekend operating instructions. <br />l.Required sequences for electric or electronic systems. <br />m.Special operating instructions and procedures. <br />5.Adjustments: Include the following: <br />a.Alignments. <br />b.Checking adjustments. <br />c.Noise and vibration adjustments. <br />d.Economy and efficiency adjustments.
The URL can be used to link to this page
Your browser does not support the video tag.