Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />DEMONSTRATION AND TRAINING 01 7900 - 3 <br />ed. 2023-09-22 <br />d.Regulatory requirements. <br />e.Equipment function. <br />f.Operating characteristics. <br />g.Limiting conditions. <br />h.Performance curves. <br />2.Documentation: Review the following items in detail: <br />a.Emergency manuals. <br />b.Systems and equipment operation manuals. <br />c.Systems and equipment maintenance manuals. <br />d.Product maintenance manuals. <br />e.Project Record Documents. <br />f.Identification systems. <br />g.Warranties and bonds. <br />h.Maintenance service agreements and similar continuing commitments. <br />3.Emergencies: Include the following, as applicable: <br />a.Instructions on meaning of warnings, trouble indications, and error messages. <br />b.Instructions on stopping. <br />c.Shutdown instructions for each type of emergency. <br />d.Operating instructions for conditions outside of normal operating limits. <br />e.Sequences for electric or electronic systems. <br />f.Special operating instructions and procedures. <br />4.Operations: Include the following, as applicable: <br />a.Startup procedures. <br />b.Equipment or system break-in procedures. <br />c.Routine and normal operating instructions. <br />d.Regulation and control procedures. <br />e.Control sequences. <br />f.Safety procedures. <br />g.Instructions on stopping. <br />h.Normal shutdown instructions. <br />i.Operating procedures for emergencies. <br />j.Operating procedures for system, subsystem, or equipment failure. <br />k.Seasonal and weekend operating instructions. <br />l.Required sequences for electric or electronic systems. <br />m.Special operating instructions and procedures. <br />5.Adjustments: Include the following: <br />a.Alignments. <br />b.Checking adjustments. <br />c.Noise and vibration adjustments. <br />d.Economy and efficiency adjustments.