My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />DEMONSTRATION AND TRAINING 01 7900 - 4 <br />ed. 2023-09-22 <br />6.Troubleshooting: Include the following: <br />a.Diagnostic instructions. <br />b.Test and inspection procedures. <br />7.Maintenance: Include the following: <br />a.Inspection procedures. <br />b.Types of cleaning agents to be used and methods of cleaning. <br />c.List of cleaning agents and methods of cleaning detrimental to product. <br />d.Procedures for routine cleaning. <br />e.Procedures for preventive maintenance. <br />f.Procedures for routine maintenance. <br />g.Instruction on use of special tools. <br />8.Repairs: Include the following: <br />a.Diagnosis instructions. <br />b.Repair instructions. <br />c.Disassembly; component removal, repair, and replacement; and reassembly <br />instructions. <br />d.Instructions for identifying parts and components. <br />e.Review of spare parts needed for operation and maintenance. <br />1.7 PREPARATION <br />A.Assemble educational materials necessary for instruction, including documentation and training <br />module. Assemble training modules into a training manual organized in coordination with <br />requirements in Section 01 7823 "Operation and Maintenance Data." <br />B.Set up instructional equipment at instruction location. <br />1.8 INSTRUCTION <br />A.Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to <br />coordinate instructors, and to coordinate between Contractor and Owner for number of <br />participants, instruction times, and location. <br />B.Engage qualified instructors to instruct Owner's personnel to adjust, operate, and maintain systems, <br />subsystems, and equipment not part of a system. <br />1.Architect will furnish an instructor to describe basis of system design, operational <br />requirements, criteria, and regulatory requirements. <br />2.Owner will furnish an instructor to describe Owner's operational philosophy. <br />3.Owner will furnish Contractor with names and positions of participants.
The URL can be used to link to this page
Your browser does not support the video tag.