My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SELECTIVE DEMOLITION 02 4119 - 4 <br />3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS <br />A.Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect <br />them against damage. <br />B.Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, <br />disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to <br />be selectively demolished. <br />1.Landlord will arrange to shut off indicated services/systems when requested by Contractor. <br />2.If services/systems are required to be removed, relocated, or abandoned, provide temporary <br />services/systems that bypass area of selective demolition and that maintain continuity of <br />services/systems to other parts of building. <br />3.Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC <br />systems, equipment, and components indicated on Drawings to be removed and/or <br />otherwise abandoned. <br />a.Piping to Be Removed: Remove portion of piping indicated to be removed and cap <br />or plug remaining piping with same or compatible piping material. <br />b.Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or <br />compatible piping material and leave in place. <br />c.Equipment to Be Removed: Disconnect and cap services and remove equipment. <br />d.Equipment to Be Removed and Reinstalled: Disconnect and cap services and <br />remove, clean, and store equipment; when appropriate, reinstall, reconnect, and <br />make equipment operational. <br />e.Equipment to Be Removed and Salvaged: Disconnect and cap services and remove <br />equipment and deliver to Owner. <br />f.Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug <br />remaining ducts with same or compatible ductwork material. <br />g.Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible <br />ductwork material and leave in place. <br />3.3 PROTECTION <br />A.Temporary Protection: Provide temporary barricades and other protection required to prevent <br />injury to people and damage to adjacent buildings and facilities to remain. <br />1.Comply with requirements for temporary enclosures, dust control, heating, and cooling <br />specified in Section 01 5000 "Temporary Facilities and Controls." <br />B.Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as <br />required to preserve stability and prevent movement, settlement, or collapse of construction and <br />finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of <br />construction being demolished. <br />1.Strengthen or add new supports when required during progress of selective demolition.
The URL can be used to link to this page
Your browser does not support the video tag.