My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SELECTIVE DEMOLITION 02 4119 - 3 <br />1.8 COORDINATION <br />A.Arrange selective demolition schedule so as not to interfere with adjacent Tenant's operations and <br />comply with Landlord’s use of premises requirements listed in documentation. <br />PART 2 - PRODUCTS <br />2.1 PERFORMANCE REQUIREMENTS <br />A.Regulatory Requirements: Comply with governing EPA notification regulations before beginning <br />selective demolition. Comply with hauling and disposal regulations of authorities having <br />jurisdiction. <br />B.Standards: Comply with ASSE A10.6 “Safety & Health Program Requirements for Demolition <br />Operations” and NFPA 241 “Standard for Safeguarding Construction, Alteration, and Demolition <br />Operations”. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A.Verify that utilities have been disconnected and capped before starting selective demolition <br />operations. <br />B.Review Project Record Documents of existing construction or other existing condition and <br />hazardous material information provided by Owner. Owner does not guarantee that existing <br />conditions are same as those indicated in Project Record Documents. <br />C. Engage a professional engineer to perform an engineering survey of condition of building to <br />determine whether removing any element might result in structural deficiency or unplanned <br />collapse of any portion of structure or adjacent structures during selective building demolition <br />operations. <br />1.Perform surveys as the Work progresses to detect hazards resulting from selective <br />demolition activities. <br />D.Survey of Existing Conditions: Record existing conditions by use of measured drawings, <br />preconstruction photographs or video. <br />1.Comply with requirements specified in Section 01 3233 "Photographic Documentation." <br />2.Inventory and record the condition of items to be removed and salvaged. Provide <br />photographs or video of conditions that might be misconstrued as damage caused by <br />salvage operations.
The URL can be used to link to this page
Your browser does not support the video tag.