My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />DOOR HARDWARE 08 7100-12 <br />ed. 2023-10-12 <br />2) Patent Protection: Keys and blanks protected by one or more utility patent(s). <br />3) Geographically Exclusive: Where High Security or Security cylinders/cores are <br />indicated, provide nationwide, geographically exclusive key system complying <br />with the following restrictions. <br />d. Identification: <br />1) Mark permanent cylinders/cores and keys with applicable blind code for <br />identification. Do not provide blind code marks with actual key cuts. <br />2) Identification stamping provisions must be approved by the Architect and Owner. <br />3) Stamp cylinders/cores and keys with Owner’s unique key system facility code as <br />established by the manufacturer; key symbol and embossed or stamped with “DO <br />NOT DUPLICATE” along with the “PATENTED” or patent number to enforce <br />the patent protection. <br />4) Failure to comply with stamping requirements will be cause for replacement of <br />keys involved at no additional cost to Owner. <br />5) Forward permanent cylinders/cores to Owner, separately from keys, by means as <br />directed by Owner. <br />e. Quantity: Furnish in the following quantities. <br />1) Permanent Control Keys: 3. <br />2) Master Keys: 6. <br />3) Change (Day) Keys: 3 per cylinder/core that is keyed differently <br />4) Key Blanks: Quantity as determined in the keying meeting. <br />2.08 KEY CONTROL SYSTEM <br />A. Manufacturers: <br />1. Scheduled Manufacturer: <br />a. Telkee <br />B. Requirements: <br />1. Provide key control system, including envelopes, labels, tags with self-locking key clips, <br />receipt forms, 3-way visible card index, temporary markers, permanent markers, and <br />standard metal cabinet, all as recommended by system manufacturer, with capacity for <br />150% of number of locks required for Project. <br />a. Provide complete cross index system set up by hardware supplier, and place keys on <br />markers and hooks in cabinet as determined by final key schedule. <br />b. Provide hinged-panel type cabinet for wall mounting. <br />2.09 DOOR CLOSERS
The URL can be used to link to this page
Your browser does not support the video tag.