My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />DOOR HARDWARE 08 7100-11 <br />ed. 2023-10-12 <br />a. Provide cylinders/cores keyed into Owner’s existing keying system managed by <br />Owner’s locksmith, complying with guidelines in ANSI/BHMA A156.28, <br />incorporating decisions made at keying conference. Contact: <br />1) Firm Name: <br />2) Contact Person: <br />3) Telephone: <br />B. Requirements: <br />1. Construction Keying: <br />a. Temporary Construction Cylinder Keying. <br />1) Provide construction cores that permit voiding construction keys without cylinder <br />removal, furnished in accordance with the following requirements. <br />a) Split Key or Lost Ball Construction Keying System. <br />b) 3 construction control keys, and extractor tools or keys as required to void <br />construction keying. <br />c) 12 construction change (day) keys. <br />2) Owner or Owner’s Representative will void operation of temporary construction <br />keys. <br />b. Replaceable Construction Cores. <br />1) Provide temporary construction cores replaceable by permanent cores, furnished <br />in accordance with the following requirements. <br />a) 3 construction control keys <br />b) 12 construction change (day) keys. <br />2) Owner or Owner’s Representative will replace temporary construction cores with <br />permanent cores. <br />2. Permanent Keying: <br />a. Provide permanent cylinders/cores keyed by the manufacturer according to the <br />following key system. <br />1) Master Keying system as directed by the Owner. <br />b. Forward bitting list and keys separately from cylinders, by means as directed by <br />Owner. Failure to comply with forwarding requirements will be cause for <br />replacement of cylinders/cores involved at no additional cost to Owner. <br />c. Provide keys with the following features: <br />1) Material: Nickel silver; minimum thickness of .107-inch (2.3mm)
The URL can be used to link to this page
Your browser does not support the video tag.