My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />GYPSUM BOARD 09 2900 - 6 <br />2.7 AUXILIARY MATERIALS <br />A.Provide auxiliary materials that comply with referenced installation standards and manufacturer's <br />written instructions. <br />B.Laminating Adhesive: Adhesive or joint compound recommended for directly adhering gypsum <br />panels to continuous substrate. <br />C.Steel Drill Screws: ASTM C1002 unless otherwise indicated. <br />1.Use screws complying with ASTM C954 for fastening panels to steel members from 0.033 to <br />0.112 inch thick. <br />2.For fastening cementitious backer units, use screws of type and size recommended by panel <br />manufacturer. <br />D.Sound-Attenuation Blankets: ASTM C665, Type I (blankets without membrane facing) produced by <br />combining thermosetting resins with mineral fibers manufactured from glass, slag wool, or rock wool. <br />1.Fire-Resistance-Rated Assemblies: Comply with mineral-fiber requirements of assembly. <br />E.Thermal Insulation: As specified in Section 07 2100 "Thermal Insulation." <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A.Examine areas and substrates including welded hollow-metal frames and support framing, with <br />Installer present, for compliance with requirements and other conditions affecting performance of the <br />Work. <br />B.Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged. <br />C.Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION AND FINISHING OF PANELS, GENERAL <br />A.Comply with ASTM C840. <br />B.Install ceiling panels across framing to minimize the number of abutting end joints and to avoid <br />abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not <br />less than one framing member. <br />C.Install panels with face side out. Butt panels together for a light contact at edges and ends with not <br />more than 1/16 inch of open space between panels. Do not force into place.
The URL can be used to link to this page
Your browser does not support the video tag.