My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />EXTERIOR PAINTING 09 9113 - 3 <br />1.Materials for use within each paint system shall be compatible with one another and substrates <br />indicated, under conditions of service and application as demonstrated by manufacturer, based on <br />testing and field experience. <br />2.For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for <br />use in paint system and on substrate indicated. <br />C.Colors: As indicated in a color schedule. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A.Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum <br />moisture content and other conditions affecting performance of the Work. <br />B.Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows: <br />1.Concrete: 12 percent. <br />C.Portland Cement Plaster Substrates: Verify that plaster is fully cured. <br />D.Verify suitability of substrates, including surface conditions and compatibility, with existing finishes and <br />primers. <br />E.Proceed with coating application only after unsatisfactory conditions have been corrected. <br />1.Application of coating indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A.Comply with manufacturer's written instructions and recommendations in "MPI Architectural Painting <br />Specification Manual" applicable to substrates and paint systems indicated. <br />B.Remove hardware, covers, plates, and similar items already in place that are removable and are not to be <br />painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied <br />protection before surface preparation and painting. <br />1.After completing painting operations, use workers skilled in the trades involved to reinstall items that <br />were removed. Remove surface-applied protection. <br />C.Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and <br />incompatible paints and encapsulants. <br />1.Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as <br />required to produce paint systems indicated.
The URL can be used to link to this page
Your browser does not support the video tag.