My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR PAINTING 09 9123 - 1 <br />Note that the Round 1 Project Specifications is non-site specific and not all portions of the individual <br />Sections contained in the Project Specifications may apply to a particular Project. Refer to the <br />Drawings. <br />SECTION 09 9123 - INTERIOR PAINTING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions <br />and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes surface preparation and the application of paint systems on the following interior <br />substrates: <br />1.Concrete. <br />2.Cement board. <br />3.Clay masonry. <br />4.Steel and iron. <br />5.Galvanized metal. <br />6.Wood. <br />7.Fiberglass. <br />8.Plastic. <br />9.Gypsum board. <br />10.Plaster. <br />11.Acoustic panels and tiles. <br />12.Spray-textured ceilings. <br />13.ASJ insulation covering. <br />B.Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not <br />to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a <br />surface, notify Architect for clarification. If the schedules do not indicate color or finish, the <br />Architect will select from standard colors and finishes available. <br />1.Painting includes field painting of exposed bare and covered pipes and ducts (including <br />color coding), hangers, exposed steel and iron work, and primed metal surfaces of <br />mechanical and electrical equipment. <br />C.Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and <br />labels. <br />1.Prefinished items include the following factory-finished components:
The URL can be used to link to this page
Your browser does not support the video tag.