Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR PAINTING 09 9123 - 2 <br />a.Architectural woodwork and casework. <br />b.Acoustical wall panels. <br />c.Metal toilet enclosures. <br />d.Metal lockers. <br />e.Finished mechanical and electrical equipment, unless noted otherwise. <br />f.Light fixtures. <br />g.Distribution cabinets. <br />h.Aluminum framing and glass. <br />2.Concealed surfaces include walls or ceilings in the following generally inaccessible spaces: <br />a.Foundation spaces. <br />b.Furred areas. <br />c.Ceiling plenums. <br />d.Utility tunnels. <br />e.Pipe spaces. <br />f.Duct shafts. <br />g.Elevator shafts. <br />3.Finished metal surfaces include the following: <br />a.Anodized aluminum. <br />b.Stainless steel. <br />c.Chromium plate. <br />d.Copper. <br />e.Bronze and brass. <br />4.Operating parts include moving parts of operating equipment and the following: <br />a.Valve and damper operators. <br />b.Linkages. <br />c.Sensing devices. <br />d.Motor and fan shafts. <br />5.Labels: Do not paint over Underwriters Laboratories (UL), Factory Mutual (FM), or other <br />code-required labels or equipment name, identification, performance rating, or nomenclature <br />plates. <br />D.Related Sections: <br />1.Section 05 5000 "Metal Fabrications" for shop priming metal fabrications and steel. <br />1.3 DEFINITIONS <br />A.MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according to <br />ASTM D 523.