Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR PAINTING 09 9123 - 3 <br />B.MPI Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, <br />according to ASTM D 523. <br />C.MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to <br />ASTM D 523. <br />D.MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according <br />to ASTM D 523. <br />E.MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523. <br />F.MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523. <br />G.MPI Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D 523. <br />1.4 ACTION SUBMITTALS <br />A.Product Data: For each type of product. Include preparation requirements and application <br />instructions. <br />1.Include Printout of current "MPI Approved Products List" for each product category <br />specified, with the proposed product highlighted. <br />2.Indicate VOC content. <br />B.Samples for Verification: For each type of paint system and in each color and gloss of topcoat. <br />1.Submit Samples on rigid backing, 8 inches square. <br />2.Apply coats on Samples in steps to show each coat required for system. <br />3.Label each coat of each Sample. <br />4.Label each Sample for location and application area. <br />C.Product List: Cross-reference to paint system and locations of application areas. Use same <br />designations indicated on Drawings and in schedules. Include color designations. <br />1.5 QUALITY ASSURANCE <br />A.Mockups: Apply paint system indicated and each color and finish selected to verify preliminary <br />selections made under Sample submittals and to demonstrate aesthetic effects and set quality <br />standards for materials and execution. <br />1.Final approval of color selections will be based on mockups. <br />a.If preliminary color selections are not approved, apply additional mockups of <br />additional colors selected by Construction Manager at no added cost.