Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR PAINTING 09 9123 - 8 <br />G.Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is <br />abraded. Paint exposed areas with the same material as used for shop priming to comply with <br />SSPC-PA 1 for touching up shop-primed surfaces. <br />H.Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by <br />mechanical methods to produce clean, lightly etched surfaces that promote adhesion of <br />subsequently applied paints. <br />I.Aluminum Substrates: Remove loose surface oxidation. <br />J.Gypsum Board Substrates and other Skim Coated Surfaces: Do not begin paint application until <br />finishing compound is dry and sanded smooth. Verify finish level of drywall required for paint <br />sheen specified <br />K.Wood Substrates: <br />1.Scrape and clean knots, and apply coat of knot sealer before applying primer. <br />2.Sand surfaces that will be exposed to view, and dust off. <br />3.Prime edges, ends, faces, undersides, and backsides of wood. <br />4.After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood <br />filler. Sand smooth when dried. <br />3.3 APPLICATION <br />A.Apply paints according to manufacturer's written instructions and to recommendations in "MPI <br />Manual." <br />1.Use applicators and techniques suited for paint and substrate indicated. <br />2.Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. <br />Before final installation, paint surfaces behind permanently fixed equipment or furniture <br />with prime coat only. <br />3.Paint front and backsides of access panels, removable or hinged covers, and similar hinged <br />items to match exposed surfaces. <br />4.Do not paint over labels of independent testing agencies or equipment name, identification, <br />performance rating, or nomenclature plates. <br />5.Primers specified in painting schedules may be omitted on items that are factory primed or <br />factory finished if acceptable to topcoat manufacturers. <br />B.If undercoats or other conditions show through topcoat, apply additional coats until cured film has <br />a uniform paint finish, color, and appearance. <br />C.Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, <br />roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color <br />breaks. <br />D.Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety <br />and Security Work: