Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />INTERIOR PAINTING 09 9123 - 9 <br />1.Paint items exposed in equipment rooms and occupied spaces including, but not limited to, <br />the following: <br />a.Equipment, including panelboards and switch gear. <br />b.Uninsulated metal piping. <br />c.Uninsulated plastic piping. <br />d.Pipe hangers and supports. <br />e.Metal conduit. <br />f.Plastic conduit. <br />g.Tanks that do not have factory-applied final finishes. <br />h.Duct, equipment, and pipe insulation having cotton or canvas insulation covering or <br />other paintable jacket material. <br />i.Mechanical equipment that is indicated to have a factory-primed finish for field <br />painting. <br />2.Paint portions of internal surfaces of metal ducts, without liner, behind air inlets and outlets <br />that are visible from occupied spaces. <br />3.4 FIELD QUALITY CONTROL <br />A.Dry Film Thickness Testing: Owner may engage the services of a qualified testing and inspecting <br />agency to inspect and test paint for dry film thickness. <br />1.Contractor shall touch up and restore painted surfaces damaged by testing. <br />2.If test results show that dry film thickness of applied paint does not comply with paint <br />manufacturer's written recommendations, Contractor shall pay for testing and apply <br />additional coats as needed to provide dry film thickness that complies with paint <br />manufacturer's written recommendations. <br />3.5 CLEANING AND PROTECTION <br />A.At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from <br />Project site. <br />B.After completing paint application, clean spattered surfaces. Remove spattered paints by washing, <br />scraping, or other methods. Do not scratch or damage adjacent finished surfaces. <br />C.Protect work of other trades against damage from paint application. Correct damage to work of <br />other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave <br />in an undamaged condition. <br />D.At completion of construction activities of other trades, touch up and restore damaged or defaced <br />painted surfaces.