My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />a.Engineering Responsibility: Preparation of working plans, calculations, and field <br />test reports by a qualified design engineer. <br />B.Welding Qualifications: Qualify procedures and operators according to ASME Boiler and <br />Pressure Vessel Code. <br />C.Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, <br />by a qualified testing agency, and marked for intended location and application. <br />D.NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing <br />shall comply with the following: <br />1.NFPA 13, "Installation of Sprinkler Systems." <br />1.8 PROJECT CONDITIONS <br />A.Interruption of Existing Sprinkler Service: Do not interrupt sprinkler service to facilities <br />occupied by Owner or others unless permitted under the following conditions and then only <br />after arranging to provide temporary sprinkler service according to requirements indicated: <br />1.Notify Construction Manager and Owner no fewer than three days in advance of <br />proposed interruption of sprinkler service. <br />2.Do not proceed with interruption of sprinkler service without Construction Manager's and <br />Owner's written permission. <br />1.9 COORDINATION <br />A.Coordinate layout and installation of sprinklers with all other construction that penetrates <br />ceilings, including light fixtures, HVAC equipment, and partition assemblies. Mount piping as <br />high as structure will allow and with as little interference with other trades as possible. <br />1.10 EXTRA MATERIALS <br />A.Furnish extra materials that match products installed and that are packaged with protective <br />covering for storage and identified with labels describing contents. <br />1.Sprinkler Cabinets: Finished, wall-mounted steel cabinet and hinged cover with space <br />for spare sprinklers. Include number of sprinklers required by NFPA 13 and sprinkler <br />wrench <br />PART 2 - PRODUCTS <br />2.1 PIPING MATERIALS <br />A.Comply with requirements in "Piping Schedule" Article for applications of pipe, tube, and <br />fitting materials, and for joining methods for specific services, service locations, and pipe sizes.
The URL can be used to link to this page
Your browser does not support the video tag.