My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />B.Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure <br />Vessel Code: Section IX, "Welding and Brazing Qualifications." <br />1.Comply with provisions in ASME B31 Series, "Code for Pressure Piping." <br />2.Certify that each welder has passed AWS qualification tests for welding processes <br />involved and that certification is current. <br />C.Electrical Characteristics for HVAC Equipment: Equipment of higher electrical characteristics <br />may be furnished provided such proposed equipment is approved in writing and connecting <br />electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum <br />energy ratings or efficiencies are specified, equipment shall comply with requirements. <br />1.10 DELIVERY, STORAGE, AND HANDLING <br />A.Deliver pipes and tubes with factory-applied end caps. Maintain end caps through shipping, <br />storage, and handling to prevent pipe end damage and to prevent entrance of dirt, debris, and <br />moisture. <br />B.Store plastic pipes protected from direct sunlight. Support to prevent sagging and bending. <br />1.11 COORDINATION <br />A.Arrange for pipe spaces, chases, slots, and openings in building structure during progress of <br />construction, to allow for HVAC installations. <br />B.Coordinate installation of required supporting devices and set sleeves in poured-in-place <br />concrete and other structural components as they are constructed. <br />C.Coordinate requirements for access panels and doors for fire-suppression items requiring access <br />that are concealed behind finished surfaces. Access panels and doors to be equal to Milcor or <br />Vent-Lock, 10” x 18” steel access, flush type for mounting in walls or ceilings with prime <br />coating, ready for field painting. Access panels shall be provided by Mechanical Contractor for <br />installation by General Trades. Locate so as to provide access for all required maintenance. <br />Provide more than one where required. Provide UL labeled panels where installed in rated <br />walls or ceilings, and shall match the rating of the structure. <br />PART 2 - PRODUCTS <br />2.1 MANUFACTURERS <br />A.In other Part 2 articles where subparagraph titles below introduce lists, the following <br />requirements apply for product selection: <br />1.Manufacturers: Subject to compliance with requirements, provide products by the <br />manufacturers specified.
The URL can be used to link to this page
Your browser does not support the video tag.