Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />1.6 RECORD DOCUMENTS <br />A.Prepare record documents in accordance with the requirements in Division 1 Section, Project <br />Closeout. In addition to the requirements specified in Division 1, indicate the following <br />installed conditions: <br />1.Mains and branches of piping systems, with valves and control devices located and <br />numbered, concealed unions located, and with items requiring maintenance located (i.e., <br />traps, strainers, expansion compensators, tank, etc.). Valve location diagrams, complete <br />with valve tag chart. Indicate actual inverts and horizontal locations of underground <br />piping. <br />2.Approved substitutions, Contract Modifications, and actual equipment and materials <br />installed. <br />3.Contract Modifications, actual equipment and materials installed. <br />1.7 MAINTENANCE MANUALS <br />A.Prepare maintenance manuals in accordance with Division 1 Section, Project Closeout. In <br />addition to the requirements specified in Division 1, include the following information for <br />equipment items: <br />1.Description of function, normal operating characteristics and limitations, performance <br />curves, engineering data and tests, and complete nomenclature and commercial numbers <br />of replacement parts. <br />2.Manufacturer’s printed operating procedures to include start-up, break-in and routine and <br />normal operating instructions; regulation, control, stopping, shutdown, and emergency <br />instructions; and summer and winter operating instructions. <br />3.Maintenance procedures for routine preventative maintenance and troubleshooting; <br />disassembly, repair, and reassembly; aligning and adjusting instructions. <br />4.Servicing instructions and lubrication charts and schedules. <br />1.8 SUBSTITUTIONS <br />A.This Contractor shall be considered liable for all added costs both to himself and others <br />(including those costs as incurred by the Engineer, for redesigning or redrawing) resultant from <br />the substitution of products not the basis of the design. <br />B.This Contractor shall be responsible for the verification of adequate space (considering <br />dimensions, required clearances, weights, and roughing-in requirements) for the installation of <br />items or systems not the basis of the design. He shall be responsible for advising all other <br />trades. He shall submit revised drawing layouts for the approval of the Engineer and shall not <br />proceed without this approval. <br />1.9 QUALITY ASSURANCE <br />A.Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural <br />Welding Code--Steel."