My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />2.Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, <br />install dowel rods on 18-inch centers around the full perimeter of the base. <br />3.Install epoxy-coated anchor bolts for supported equipment that extend through concrete <br />base, and anchor into structural concrete floor. <br />4.Place and secure anchorage devices. Use supported equipment manufacturer's setting <br />drawings, templates, diagrams, instructions, and directions furnished with items to be <br />embedded. <br />5.Install anchor bolts to elevations required for proper attachment to supported equipment. <br />6.Install anchor bolts according to anchor-bolt manufacturer's written instructions. <br />7.Use 3000-psi, 28-day compressive-strength concrete and reinforcement as specified in <br />Division 03 Section "Cast-in-Place Concrete." <br />3.8 ERECTION OF METAL SUPPORTS AND ANCHORAGES <br />A.Refer to Division 05 Section "Metal Fabrications" for structural steel. <br />B.Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation <br />to support and anchor HVAC materials and equipment. <br />C.Field Welding: Comply with AWS D1.1. <br />3.9 ERECTION OF WOOD SUPPORTS AND ANCHORAGES <br />A.Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor <br />HVAC materials and equipment. <br />B.Select fastener sizes that will not penetrate members if opposite side will be exposed to view or <br />will receive finish materials. Tighten connections between members. Install fasteners without <br />splitting wood members. <br />C.Attach to substrates as required to support applied loads. <br />3.10 GROUTING <br />A.Mix and install grout for HVAC equipment base bearing surfaces, pump and other equipment <br />base plates, and anchors. <br />B.Clean surfaces that will come into contact with grout. <br />C.Provide forms as required for placement of grout. <br />D.Avoid air entrapment during placement of grout. <br />E.Place grout, completely filling equipment bases. <br />F.Place grout on concrete bases and provide smooth bearing surface for equipment. <br />G.Place grout around anchors.
The URL can be used to link to this page
Your browser does not support the video tag.