My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />3.PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket <br />fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and <br />socket fittings according to ASTM D 2855. <br />4.PVC Nonpressure Piping: Join according to ASTM D 2855. <br />J.Plastic Pressure Piping Gasketed Joints: Join according to ASTM D 3139. <br />K.Plastic Nonpressure Piping Gasketed Joints: Join according to ASTM D 3212. <br />3.4 PIPING CONNECTIONS <br />A.Make connections according to the following, unless otherwise indicated: <br />1.Install unions, in piping NPS 2 and smaller, adjacent to each valve and at final connection <br />to each piece of equipment. <br />2.Install flanges, in piping NPS 2-1/2 and larger, adjacent to flanged valves and at final <br />connection to each piece of equipment. <br />3.Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping <br />materials of dissimilar metals. <br />3.5 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS <br />A.Install equipment to allow maximum possible headroom unless specific mounting heights are <br />not indicated. <br />B.Install equipment level and plumb, parallel and perpendicular to other building systems and <br />components in exposed interior spaces, unless otherwise indicated. <br />C.Install HVAC equipment to facilitate service, maintenance, and repair or replacement of <br />components. Connect equipment for ease of disconnecting, with minimum interference to other <br />installations. Extend grease fittings to accessible locations. <br />D.Install equipment to allow right of way for piping installed at required slope. <br />3.6 PAINTING <br />A.Painting of HVAC systems, equipment, and components is specified in Division 09 Sections <br />"Interior Painting" and "Exterior Painting." <br />B.Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and <br />procedures to match original factory finish. <br />3.7 CONCRETE BASES <br />A.Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's <br />written instructions and according to seismic codes at Project. <br />1.Construct concrete bases of dimensions indicated, but not less than 4 inches larger in both <br />directions than supported unit.
The URL can be used to link to this page
Your browser does not support the video tag.