Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />3.Remove welding flux immediately. <br />4.Finish welds at exposed connections so no roughness shows after finishing and contours <br />of welded surfaces match adjacent contours. <br />3.5 ADJUSTING <br />A.Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve <br />indicated slope of pipe. <br />B.Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches. <br />3.6 PAINTING <br />A.Touch Up: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately <br />after erecting hangers and supports. Use same materials as used for shop painting. Comply <br />with SSPC-PA 1 requirements for touching up field-painted surfaces. <br />1.Apply paint by brush or spray to provide minimum dry film thickness of 2.0 mils. <br />B.Touch Up: Cleaning and touchup painting of field welds, bolted connections, and abraded areas <br />of shop paint on miscellaneous metal are specified in Division 09. <br />C.Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply <br />galvanizing-repair paint to comply with ASTM A 780. <br />END OF SECTION 23 0529