My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SECTION 23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section Includes: <br />1.Equipment labels. <br />2.Warning signs and labels. <br />3.Pipe labels. <br />4.Duct labels. <br />5.Stencils. <br />6.Valve tags. <br />7.Warning tags. <br />1.3 SUBMITTALS <br />A.Product Data: For each type of product indicated. <br />B.Samples: For color, letter style, and graphic representation required for each identification <br />material and device. <br />C.Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed <br />content for each label. <br />D.Valve numbering scheme. <br />E.Valve Schedules: For each piping system to include in maintenance manuals. <br />1.4 COORDINATION <br />A.Coordinate installation of identifying devices with completion of covering and painting of <br />surfaces where devices are to be applied. <br />B.Coordinate installation of identifying devices with locations of access panels and doors. <br />C.Install identifying devices before installing acoustical ceilings and similar concealment.
The URL can be used to link to this page
Your browser does not support the video tag.