Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />SECTION 23 0553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section Includes: <br />1.Equipment labels. <br />2.Warning signs and labels. <br />3.Pipe labels. <br />4.Duct labels. <br />5.Stencils. <br />6.Valve tags. <br />7.Warning tags. <br />1.3 SUBMITTALS <br />A.Product Data: For each type of product indicated. <br />B.Samples: For color, letter style, and graphic representation required for each identification <br />material and device. <br />C.Equipment Label Schedule: Include a listing of all equipment to be labeled with the proposed <br />content for each label. <br />D.Valve numbering scheme. <br />E.Valve Schedules: For each piping system to include in maintenance manuals. <br />1.4 COORDINATION <br />A.Coordinate installation of identifying devices with completion of covering and painting of <br />surfaces where devices are to be applied. <br />B.Coordinate installation of identifying devices with locations of access panels and doors. <br />C.Install identifying devices before installing acoustical ceilings and similar concealment.