My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />C.Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; <br />machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and <br />exterior exposed locations as follows: <br />1.Near each valve and control device. <br />2.Near each branch connection, excluding short takeoffs for fixtures and terminal units. <br />Where flow pattern is not obvious, mark each pipe at branch. <br />3.Near penetrations through walls, floors, ceilings, and inaccessible enclosures. <br />4.At access doors, manholes, and similar access points that permit view of concealed <br />piping. <br />5.Near major equipment items and other points of origination and termination. <br />6.Spaced at maximum intervals of 25 feet along each run. Reduce intervals to 15 feet in <br />areas of congested piping, equipment and within equipment rooms. <br />7.On piping above removable acoustical ceilings. <br />D.Pipe Label Color Schedule: <br />1.Heating Water Piping: <br />a.Background Color: White. <br />b.Letter Color: Black. <br />2.Refrigerant Piping: <br />a.Background Color: White. <br />b.Letter Color: Red. <br />3.4 VALVE-TAG INSTALLATION <br />A.Install tags on valves and control devices in piping systems, except check valves; valves within <br />factory-fabricated equipment units; shutoff valves; faucets; convenience and lawn-watering <br />hose connections; and HVAC terminal devices and similar roughing-in connections of end-use <br />fixtures and units. List tagged valves in a valve schedule. <br />B.Valve-Tag Application Schedule: Tag valves according to size, shape, and color scheme and <br />with captions similar to those indicated in the following subparagraphs: <br />1.Valve-Tag Size and Shape: <br />a.Refrigerant: 2 inches round. <br />b.Hot Water: 2 inches round. <br />c.Gas: 2 inches round.
The URL can be used to link to this page
Your browser does not support the video tag.