My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />c.Measure room temperature at each thermostat/temperature sensor. Compare the <br />reading to the set point. <br />d.Verify that balancing devices are marked with final balance position. <br />e.Note deviations from the Contract Documents in the final report. <br />B.Final Inspection: <br />1.After initial inspection is complete and documentation by random checks verifies that <br />testing and balancing are complete and accurately documented in the final report, request <br />that a final inspection be made by Architect. <br />2.Architect shall randomly select measurements, documented in the final report, to be <br />rechecked. Rechecking shall be limited to either 10 percent of the total measurements <br />recorded or the extent of measurements that can be accomplished in a normal 8-hour <br />business day. <br />3.If rechecks yield measurements that differ from the measurements documented in the <br />final report by more than the tolerances allowed, the measurements shall be noted as <br />"FAILED." <br />4.If the number of "FAILED" measurements is greater than 10 percent of the total <br />measurements checked during the final inspection, the testing and balancing shall be <br />considered incomplete and shall be rejected. <br />C.TAB Work will be considered defective if it does not pass final inspections. If TAB Work fails, <br />proceed as follows: <br />1.Recheck all measurements and make adjustments. Revise the final report and balancing <br />device settings to include all changes; resubmit the final report and request a second final <br />inspection. <br />2.If the second final inspection also fails, Owner may contract the services of another TAB <br />contractor to complete TAB Work according to the Contract Documents and deduct the <br />cost of the services from the original TAB contractor's final payment. <br />D.Prepare test and inspection reports. <br />3.11 ADDITIONAL TESTS <br />A.Within 90 days of completing TAB, perform additional TAB to verify that balanced conditions <br />are being maintained throughout and to correct unusual conditions. <br />B.Seasonal Periods: If initial TAB procedures were not performed during near-peak summer and <br />winter conditions, perform additional TAB during near-peak summer and winter conditions. <br />END OF SECTION 23 0593
The URL can be used to link to this page
Your browser does not support the video tag.