Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />j.Actual average velocity in fpm. <br />k.Barometric pressure in psig. <br />J.Air-Terminal-Device Reports: <br />1.Unit Data: <br />a.System and air-handling unit identification. <br />b.Location and zone. <br />c.Apparatus used for test. <br />d.Area served. <br />e.Make. <br />f.Number from system diagram. <br />g.Type and model number. <br />h.Size. <br />i.Effective area in sq. ft.. <br />2.Test Data (Indicated and Actual Values): <br />a.Air flow rate in cfm. <br />b.Air velocity in fpm. <br />c.Preliminary air flow rate as needed in cfm. <br />d.Preliminary velocity as needed in fpm. <br />e.Final air flow rate in cfm. <br />f.Final velocity in fpm. <br />g.Space temperature in deg F. <br />K.Instrument Calibration Reports: <br />1.Report Data: <br />a.Instrument type and make. <br />b.Serial number. <br />c.Application. <br />d.Dates of use. <br />e.Dates of calibration. <br />3.10 INSPECTIONS <br />A.Initial Inspection: <br />1.After testing and balancing are complete, operate each system and randomly check <br />measurements to verify that the system is operating according to the final test and balance <br />readings documented in the final report. <br />2.Check the following for each system: <br />a.Measure airflow of at least 10 percent of air outlets. <br />b.Measure water flow of at least 5 percent of terminals.