My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />j.Actual average velocity in fpm. <br />k.Barometric pressure in psig. <br />J.Air-Terminal-Device Reports: <br />1.Unit Data: <br />a.System and air-handling unit identification. <br />b.Location and zone. <br />c.Apparatus used for test. <br />d.Area served. <br />e.Make. <br />f.Number from system diagram. <br />g.Type and model number. <br />h.Size. <br />i.Effective area in sq. ft.. <br />2.Test Data (Indicated and Actual Values): <br />a.Air flow rate in cfm. <br />b.Air velocity in fpm. <br />c.Preliminary air flow rate as needed in cfm. <br />d.Preliminary velocity as needed in fpm. <br />e.Final air flow rate in cfm. <br />f.Final velocity in fpm. <br />g.Space temperature in deg F. <br />K.Instrument Calibration Reports: <br />1.Report Data: <br />a.Instrument type and make. <br />b.Serial number. <br />c.Application. <br />d.Dates of use. <br />e.Dates of calibration. <br />3.10 INSPECTIONS <br />A.Initial Inspection: <br />1.After testing and balancing are complete, operate each system and randomly check <br />measurements to verify that the system is operating according to the final test and balance <br />readings documented in the final report. <br />2.Check the following for each system: <br />a.Measure airflow of at least 10 percent of air outlets. <br />b.Measure water flow of at least 5 percent of terminals.
The URL can be used to link to this page
Your browser does not support the video tag.