Laserfiche WebLink
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />BIDDING SUBSTITUTION REQUEST FORM 00 2600.10 - 1 <br />ed. 2023-09-22 <br />BIDDING SUBSTITUTION REQUEST FORM <br />Project: <br />Specification Title: Description: <br />Section: Page: Article/Paragraph: <br />Proposed Substitution: <br />Manufacturer: Address: Phone: <br />Trade Name: Model No.: <br />Attached data includes product description, specifications, drawings, photographs, and performance and test data adequate for evaluation of <br />the request; applicable portions of the data are clearly identified. <br />Attached data also includes a description of changes to the Contract Documents that the proposed substitution will require for its proper <br />installation. <br /> Point-by-point comparative data attached — REQUIRED BY A/E <br />The Undersigned certifies: <br />•Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product. <br />•Same warranty will be furnished for proposed substitution as for specified product. <br />•Same maintenance service and source of replacement parts, as applicable, is available. <br />•Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule. <br />•Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent <br />are to be waived. <br />•Proposed substitution does not affect dimensions and functional clearances. <br />•Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution. <br />•Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects. <br />Submitted by: <br />Signed by: <br />Firm: <br />Address: <br />Telephone: <br />A/E’s REVIEW AND ACTION <br /> Substitution approved - Make submittals in accordance with Specification Section 00 2600 Bidding Substitution Procedures. <br /> Substitution approved as noted - Make submittals in accordance with Specification Section 01 2600 Bidding Substitution Procedures. <br /> Substitution rejected - Use specified materials. <br /> Substitution Request received too late - Use specified materials. <br />Signed by:Date: <br />Supporting Data Attached: Drawings Product Data Samples Tests Reports Other