My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />PROJECT MANAGEMENT AND COORDINATION 01 3100 - 1 <br />ed. 2023-09-22 <br />SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A.Drawings and general provisions of the Contract, including General and Supplementary Conditions and other <br />Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A.Section includes administrative provisions for coordinating construction operations on Project, including, but <br />not limited to, the following: <br />1.General coordination procedures. <br />2.Coordination drawings. <br />3.RFIs. <br />4.Digital project management procedures. <br />5.Web-based Project management software package. <br />6.Project meetings. <br />B.Related Requirements: <br />1.Section 01 7300 "Execution" for procedures for coordinating general installation and field- <br />engineering services, including establishment of benchmarks and control points. <br />2.Section 01 7700 "Closeout Procedures" for coordinating closeout of the Contract. <br />1.3 DEFINITIONS <br />A.BIM: Building Information Modeling. <br />B.RFI: Request for Information. Request from Architect or Contractor seeking information required by or <br />clarifications of the Contract Documents. <br />1.4 INFORMATIONAL SUBMITTALS <br />A.Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the <br />Work, including those who are to furnish products or equipment fabricated to a special design. Include the <br />following information in tabular form: <br />1.Name, address, telephone number, and email address of entity performing subcontract or supplying <br />products. <br />2.Number and title of related Specification Section(s) covered by subcontract. <br />3.Drawing number and detail references, as appropriate, covered by subcontract.
The URL can be used to link to this page
Your browser does not support the video tag.