My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2800 N Main St Unit# 1100 - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Main St
>
2800 N Main St Unit# 1100 Bldg# 2810
>
2800 N Main St Unit# 1100 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:22 AM
Creation date
2/13/2026 5:00:40 AM
Metadata
Fields
Template:
Plan
Permit Number
20185547
40140186
101124821
Full Address
2800 N Main St Unit# 1100 Bldg# 2810
Street Number
2800
Street Direction
N
Street Name
Main
Street Suffix
St
Building Number
2810
Unit Number
1100
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
647
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Round 1 Bowling and Amusement 12/09/2024 Paradigm Design <br />Main Place Mall Expansion Grand Rapids, MI <br />Santa Ana, California <br />Project #2309147GR <br />PROJECT MANAGEMENT AND COORDINATION 01 3100 - 8 <br />ed. 2023-09-22 <br />b.Tentative construction schedule. <br />c.Phasing. <br />d.Critical work sequencing and long lead items. <br />e.Designation of key personnel and their duties. <br />f.Lines of communications. <br />g.Use of web-based Project software. <br />h.Procedures for processing field decisions and Change Orders. <br />i.Procedures for RFIs. <br />j.Procedures for testing and inspecting. <br />k.Procedures for processing Applications for Payment. <br />l.Distribution of the Contract Documents. <br />m.Submittal procedures. <br />n.Sustainable design requirements. <br />o.Preparation of Record Documents. <br />p.Use of the premises and existing building. <br />q.Work restrictions. <br />r.Working hours. <br />s.Owner's occupancy requirements. <br />t.Responsibility for temporary facilities and controls. <br />u.Procedures for moisture and mold control. <br />v.Procedures for disruptions and shutdowns. <br />w.Construction waste management and recycling. <br />x.Parking availability. <br />y.Office, work, and storage areas. <br />z.Equipment deliveries and priorities. <br />aa.First aid. <br />bb.Security. <br />cc.Progress cleaning. <br />3.Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes. <br />C.Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction <br />activity when required by other Sections and when required for coordination with other construction. <br />1.Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by <br />the installation and its coordination or integration with other materials and installations that have <br />preceded or will follow, shall attend the meeting. Advise Architect of scheduled meeting dates. <br />2.Agenda: Review progress of other construction activities and preparations for the particular activity <br />under consideration, including requirements for the following: <br />a.Contract Documents. <br />b.Options. <br />c.Related RFIs. <br />d.Related Change Orders. <br />e.Purchases. <br />f.Deliveries.
The URL can be used to link to this page
Your browser does not support the video tag.