TELECOMMUNICATIONS PROJECT MANAGEMENT
<br />16776 BERNARDO CENTER DRIVE, UNIT 203
<br />SAN DIEGO, CA 92128
<br />15
<br />5
<br />0
<br />5
<br />
<br />S
<br />A
<br />N
<br />D
<br />
<br />C
<br />A
<br />N
<br />Y
<br />O
<br />N
<br />
<br />A
<br />V
<br />E
<br />N
<br />U
<br />E
<br />,
<br />
<br />B
<br />L
<br />D
<br />G
<br />
<br />C
<br />.
<br />IR
<br />V
<br />I
<br />N
<br />E
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />6
<br />1
<br />8
<br />SHEET TITLE:
<br />ISSUE STATUS
<br />DATEREV.DESCRIPTION BY
<br />FI
<br />S
<br />H
<br />E
<br />R
<br />
<br />F
<br />L
<br />O
<br />R
<br />A
<br />L
<br />26
<br />7
<br />7
<br />
<br />3
<br />/
<br />4
<br />
<br />N
<br />.
<br />
<br />M
<br />A
<br />I
<br />N
<br />,
<br />
<br />U
<br />N
<br />I
<br />T
<br />
<br />W
<br />C
<br />C
<br />0
<br />1
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />5
<br />0 02/28/2024 90% CD REVIEW jd
<br />1 03/15/2024 90% CD DRM COMMENTS jd
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />8
<br />03/29/2024
<br />05/17/2024
<br />06/21/2024
<br />08/01/2024
<br />09/25/2024
<br />05/07/2025
<br />06/04/2025
<br />90% CD DRM COMNTS #2
<br />100% FINAL CD
<br />REVISED DIESEL TANK
<br />REGULATORY HEIGHT
<br />BP SUBMITTAL
<br />100% CD BP PLANCHECK
<br />STRUCT PLANCHECK
<br />jd
<br />jd
<br />rl
<br />jd
<br />jd
<br />jd
<br />JD
<br />A-0.0
<br />PROPRIETARY INFORMATION
<br />THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS
<br />IS PROPRIETARY TO VERIZON WIRELESS
<br />PR
<br />O
<br />J
<br />E
<br />C
<br />T
<br />
<br />I
<br />.
<br />D
<br />.
<br />
<br />1
<br />5
<br />8
<br />6
<br />1
<br />0
<br />6
<br />7
<br />Ren. 4-30-27
<br />No. C 11978
<br />LICENSED A RCHITECT
<br />STATE OF CALIFORNIA
<br />WILLIAM M. BOOTH
<br />SITE WORK SPECIFICATIONSGENERAL REQUIREMENTS
<br />1.THIS FACILITY IS AN UNMANNED CELLULAR TELEPHONE EQUIPMENT FACILITY. THE OCCUPANCY
<br />CLASSIFICATION IS PUBLIC UTILITY PER P.U.C. DECISION #8606-058.
<br />2.THIS FACILITY IS EXEMPT FROM HANDICAP REQUIREMENTS PER CBC TITLE 24, SECTION 2-712. (B) 5.
<br />THIS FACILITY IS NON-OCCUPIABLE SPACE AND ENTERED ONLY BY SERVICE PERSONNEL. THIS
<br />SPACE IS NOT FOR HUMAN OCCUPANCY.
<br />3.THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VERIFY ALL EXISTING CONDITIONS
<br />AND DIMENSIONS MATCH THE DRAWINGS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT IN
<br />WRITING OF ANY DISCREPANCIES. PROCEEDING WITH CONSTRUCTION WITHOUT SUCH
<br />NOTIFICATION OF DISCREPANCIES INDICATES THE GENERAL CONTRACTOR ACCEPTS
<br />RESPONSIBILITY FOR THE EXISTING CONDITIONS AND HAS INCLUDED RESOLUTION OF THOSE
<br />DISCREPANCIES IN THE BID FOR CONSTRUCTION.
<br />4.THE CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY ERRORS, OMISSIONS, OR DISCREPANCIES
<br />AS THEY MAY BE DISCOVERED IN THE PLANS, SPECIFICATIONS AND NOTES PRIOR TO STARTING
<br />AND DURING CONSTRUCTION, INCLUDING DEMOLITION. THE METHOD OF CORRECTION SHALL BE
<br />APPROVED BY THE ARCHITECT.
<br />5.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR HAS THE RESPONSIBILITY TO LOCATE ALL
<br />EXISTING UTILITIES, WHETHER OR NOT SHOWN ON THE PLANS AND SHALL PROTECT THEM FROM
<br />DAMAGE. THE CONTRACTOR OR SUBCONTRACTOR SHALL BEAR THE EXPENSE OF REPAIRING OR
<br />REPLACING ANY DAMAGE CAUSED TO THE EXISTING UTILITIES DURING THE EXECUTION OF THE
<br />WORK.
<br />6.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL PROTECT ALL SURROUNDING
<br />AREAS FROM DAMAGE WHICH MAY OCCUR DURING CONSTRUCTION. ANY DAMAGE TO NEW OR
<br />EXISTING SURFACES, STRUCTURES OR EQUIPMENT SHALL BE IMMEDIATELY REPAIRED OR
<br />REPLACED TO THE SATISFACTION OF THE PROPERTY OWNER AND THE CONSTRUCTION MANAGER.
<br />THE CONTRACTOR SHALL BEAR THE EXPENSE OF REPAIRING OR REPLACING ANY DAMAGED AREAS.
<br />7.A COPY OF THE APPROVED PLANS SHALL BE KEPT IN A PLACE SPECIFIED BY THE GOVERNING
<br />AGENCY AND BY LAW AND SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS THE
<br />CONTRACTORS RESPONSIBILITY TO VERIFY ALL CONSTRUCTION SETS ARE DATED AND REFLECT
<br />THE SAME INFORMATION AS THE APPROVED PERMITTED PLANS. THE CONTRACTOR SHALL ALSO
<br />MAINTAIN ONE SET OF PLANS AT THE SITE FOR THE PURPOSE OF DOCUMENTING ALL AS-BUILT
<br />CHANGES, REVISIONS, ADDENDUM'S OR CHANGE ORDERS. THE CONTRACTOR SHALL FORWARD THE
<br />AS-BUILT DRAWINGS TO THE CONSTRUCTION MANAGER AT THE CONCLUSION OF THE PROJECT.
<br />8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE
<br />THE WORK IS IN PROGRESS UNTIL THE JOB IS APPROVED BY THE GOVERNING AGENCY AND
<br />ACCEPTED BY THE CARRIER AND THE PROPERTY OWNER.
<br />9.THE CONTRACTOR SHALL PROVIDE TEMPORARY POWER, WATER, TOILET FACILITIES AND
<br />PEDESTRIAN PROTECTION MEASURES AS REQUIRED BY THE PROPERTY OWNER AND GOVERNING
<br />AGENCY/CODES.
<br />10.ALL CONSTRUCTION THROUGH THE PROJECT SHALL CONFORM TO THE LATEST GOVERNING
<br />CODES, INCLUDING THE CALIFORNIA ADMINISTRATIVE CODES (CBC) TITLE 8, 19, AND 24. IN THE
<br />EVENT OF A CONFLICT, THE MOST RESTRICTIVE CODE WILL GOVERN.
<br />11.THE CONTRACTOR AND ALL SUBCONTRACTORS SHALL GIVE ALL NOTICES AND SHALL COMPLY
<br />WITH ALL APPLICABLE LOCAL CODES, REGULATIONS, LAWS AND ORDINANCES AS WELL AS STATE
<br />DEPARTMENT OF INDUSTRIAL REGULATIONS AND DIVISION OF INDUSTRIAL SAFETY (OSHA)
<br />REQUIREMENTS.
<br />12.WHEN STORAGE OF MATERIALS IS REQUIRED ABOVE GRADE LEVEL, THEY SHALL BE EVENLY
<br />DISTRIBUTED OVER THE FLOOR OR ROOF SO AS NOT TO EXCEED THE DESIGNED LIVE LOADS FOR
<br />THE STRUCTURE. TEMPORARY SHORING OR BRACING SHALL BE PROVIDED WHERE THE STRUCTURE
<br />OR SOIL HAS NOT ATTAINED THE DESIGN STRENGTH FOR THE CONDITIONS PRESENT.
<br />13.THE CONTRACTOR SHALL SUPERVISE AND COORDINATE ALL WORK, USING HIS PROFESSIONAL
<br />KNOWLEDGE AND SKILLS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION
<br />MEANS, METHODS, TECHNIQUES, PROCEDURES AND SEQUENCING AND COORDINATING ALL
<br />PORTIONS OF THE WORK UNDER THE PROJECT.
<br />14.WORKMANSHIP THROUGHOUT SHALL BE OF THE BEST QUALITY OF THE TRADE INVOLVED, AND
<br />SHALL MEET OR EXCEED THE FOLLOWING MINIMUM REFERENCE STANDARDS FOR QUALITY AND
<br />PROFESSIONAL CONSTRUCTION PRACTICE:
<br />NRCA NATIONAL ROOFING CONTRACTORS ASSOCIATION
<br />O'HARE INTERNATIONAL CENTER
<br />10255 W. HIGGINS ROAD, SUITE 600
<br />ROSEMONT, IL 60018
<br />SMACCNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
<br />NATIONAL ASSOCIATION
<br />4201 LAFAYETTE CENTER DRIVE
<br />CHANTILLY, VA 20151-1209
<br />IILP INTERNATIONAL INSTITUTE FOR LATH AND PLASTER
<br />820 TRANSFER ROAD
<br />ST. PAUL, MN 55114-1406
<br />15.INSTALL ALL EQUIPMENT AND MATERIALS PER THE LATEST EDITION OF THE MANUFACTURER'S
<br />INSTALLATION SPECIFICATIONS UNLESS SPECIFICALLY NOTED TO THE CONTRARY, OR WHERE
<br />LOCAL CODES OR REGULATIONS TAKE PRECEDENCE.
<br />16.THE CONTRACTOR SHALL BE RESPONSIBLE TO OBTAIN AND PAY FOR ALL PERMITS, LICENSES,
<br />FEES, AND INSPECTIONS REQUIRED TO COMPLETE THE PROJECT. THE BUILDING PERMIT
<br />APPLICATIONS SHALL BE FILED AND PROCESSED THROUGH APPROVAL BY THE OWNER OR HIS
<br />REPRESENTATIVE. THE CONTRACTOR SHALL PROVIDE INSURANCE AND LICENSING
<br />DOCUMENTATION TO THE BUILDING OFFICIAL AND SHALL OBTAIN THE PERMIT AND MAKE FINAL
<br />PAYMENT FOR SAID DOCUMENTS IN PERSON.
<br />17.DIMENSIONS TAKE PRECEDENCE OVER SCALE. DRAWINGS ARE NOT TO BE SCALED UNDER ANY
<br />CIRCUMSTANCES.
<br />18.THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING HANGERS OR
<br />SUPPORTS FOR INSTALLATION OF ITEMS INDICATED ON THE DRAWINGS.
<br />19.THE CONTRACTOR SHALL PROVIDE STATE FIRE MARSHALL OR U.L. APPROVED MATERIALS TO FILL &
<br />SEAL PENETRATIONS THROUGH FIRE RATED ASSEMBLIES.
<br />20.ALL NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH EXISTING
<br />CONDITIONS IN FORM, TEXTURE, MATERIAL AND COLOR EXCEPT AS NOTED IN THE PLANS.
<br />21.WATERPROOFING DETAILS AND SPECIFICATIONS SHOWN ON STRUCTURAL DRAWINGS ARE FOR
<br />GENERAL INFORMATION PURPOSES ONLY. ARCHITECTURAL WATERPROOFING DETAILS, WHERE
<br />APPLICABLE APPEAR ELSEWHERE IN THESE DRAWINGS.
<br />22.THE CONTRACTOR SHALL PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A RATING OF NOT LESS
<br />THAN 2A OR 2A10-BC WITHIN 75 FT. (MAXIMUM TRAVEL DISTANCE) FOR EACH 6,000 SQ. FT. OR
<br />PORTION THEREOF ON EACH FLOOR.
<br />23.WHERE SPECIFIED, MATERIAL TESTING SHALL BE DONE TO THE LATEST STANDARDS AVAILABLE AS
<br />REQUIRED BY THE LOCAL GOVERNING AGENCY RESPONSIBLE FOR REVIEWING THE RESULTS.
<br />24.ALL GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM REQUIREMENTS TO BE USED IN
<br />CONDITIONS WHICH ARE NOT OTHERWISE SPECIFICALLY SHOWN
<br />25.ALL DEBRIS AND REFUSE SHALL BE REMOVED FROM THE PROJECT. PREMISES SHALL BE LEFT IN A
<br />BROOM CLEAN FINISHED CONDITION AT ALL TIMES.
<br />26.BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS SHALL BE NOTIFIED PRIOR TO ANY
<br />GRADING AND CONSTRUCTION EFFORT AS MANDATED BY THAT GOVERNING AGENCY.
<br />27.ALL SYMBOLS AND ABBREVIATIONS ARE CONSIDERED CONSTRUCTION INDUSTRY STANDARDS. IF
<br />A CONTRACTOR HAS A QUESTION REGARDING THEIR EXACT MEANING, THE ARCHITECT SHALL BE
<br />NOTIFIED FOR CLARIFICATION.
<br />28.ELECTRICAL POWER SYSTEM SHALL BE GROUNDED PER CEC ARTICLES 250 AND 810.
<br />29.THE CONTRACTOR SHALL DETERMINE THE LOCATION OF UTILITY SERVICES IN THE AREA TO BE
<br />EXCAVATED PRIOR TO BEGINNING EXCAVATION OF ANY KIND (IF REQUIRED). SEE SITE WORK
<br />SPECIFICATIONS.
<br />30.NO PIPES, DUCTS, SLEEVES, CHASES, ETC., SHALL BE PLACED IN SLABS, BEAMS OR WALLS UNLESS
<br />SPECIFICALLY DETAILED OR NOTED. NOR SHALL ANY STRUCTURAL MEMBER BE CUT, NOTCHED,
<br />OR DRILLED FOR PIPES, DUCTS, ETC. UNLESS DETAILED OR NOTED. CONTRACTOR SHALL OBTAIN
<br />PRIOR APPROVAL FROM THE STRUCTURAL ENGINEER OR THE ARCHITECT FOR INSTALLATION OF
<br />ANY ADDITIONAL PIPES, DUCTS, ETC.
<br />31.SUBMITTALS:
<br />A.THE CONTRACTOR SHALL SUBMIT SHOP DRAWING DETAILS AND DATA OF SYSTEMS SPECIFIED
<br />TO THE ARCHITECT FOR APPROVAL PRIOR TO FABRICATION & INSTALLATION.
<br />B.THE CONTRACTOR SHALL SUBMIT COPIES OF ALL MANUFACTURER'S SPECIFICATIONS AND
<br />INSTALLATION INSTRUCTIONS FOR EACH SYSTEM COMPONENT TO THE ARCHITECT AND
<br />CONSTRUCTION MANAGER FOR APPROVAL PRIOR TO INSTALLATION. SUBMITTALS SHALL
<br />INCLUDE REPORTS AND OTHER DATA THAT MAY BE REQUIRED TO SHOW COMPLIANCE WITH
<br />THESE SPECIFICATIONS.
<br />32.CLEANING AND PROTECTION:
<br />A.CLEAN EXPOSED SURFACES OF FINISHES AND EQUIPMENT. COMPLY WITH MANUFACTURER'S
<br />INSTRUCTIONS FOR CLEANING AND TOUCH-UP OF MINOR FINISH DAMAGE. REMOVE AND
<br />REPLACE WORK WHICH CANNOT BE SUCCESSFULLY CLEANED AND REPAIRED TO
<br />PERMANENTLY ELIMINATE EVIDENCE OF DAMAGE.
<br />B.THE EQUIPMENT INSTALLER SHALL ADVISE THE CONTRACTOR OF REQUIRED PROTECTION FOR
<br />ANY FINISHES AND PROTECTION FROM TEMPERATURE AND DUST, SO THAT THE WORK WILL BE
<br />WITHOUT DAMAGE AND DETERIORATION AT THE TIME OF ACCEPTANCE BY THE OWNER AND
<br />THE CONSTRUCTION MANAGER
<br />GENERAL NOTES
<br />DEMOLITION:
<br />1.WORK INCLUDED:
<br />A.DEMOLITION AND REMOVAL OF EXISTING CONSTRUCTION AS NECESSARY TO PREPARE FOR NEW
<br />CONSTRUCTION.
<br />B.CLEANUP AND DISPOSAL OF RUBBISH, DEBRIS AND SALVAGE.
<br />C.PROTECTION AND BARRICADES TO PROTECT PERSONNEL AND PREMISES.
<br />D.DUST ABATEMENT.
<br />2.GENERAL REQUIREMENTS:
<br />A.IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY TO ESTABLISH THE EXTENT OF WORK UNDER THIS
<br />SECTION IN ACCORDANCE WITH PLANS AND PERTINENT PROVISIONS OF THE GENERAL NOTES &
<br />CONDITIONS.
<br />B.THE CONTRACTOR SHALL NOTIFY DIG ALERT (UNDERGROUND SERVICE ALERT) AT 1-800-227-2600 OR
<br />WWW.DIGALERT.ORG 48 HOURS PRIOR TO ANY EXCAVATION.
<br />C.FIELD CONDITIONS:
<br />(1) VERIFY DRAWING DIMENSIONS WITH ACTUAL FIELD CONDITIONS. INSPECT RELATED WORK AND
<br />ADJACENT SURFACES AND REPORT IN WRITING TO ARCHITECT ALL CONDITIONS WHICH PREVENT
<br />PROPER EXECUTION OF THIS WORK.
<br />(2) VERIFY SITE INFORMATION, INCLUDING PROPERTY LINES, EASEMENTS, BUILDINGS, ROADWAY CURB
<br />AND GUTTERS, UTILITIES AND OTHER INFORMATION AFFECTING THE SCOPE OF WORK INCLUDED ON
<br />THESE DRAWINGS. UTILITY INFORMATION INCLUDES STORM DRAIN, SEWER, WATER, ELECTRICAL,
<br />GAS, TELEPHONE AND CABLE TV. IF ACTUAL SITE CONDITIONS VARY FROM WHAT IS SHOWN ON THE
<br />PLANS, THE CONTRACTOR SHALL CONTACT THE CONSTRUCTION MANAGER AND THE ARCHITECT IN
<br />WRITING FOR DIRECTION ON HOW TO PROCEED.
<br />D.CODES AND STANDARDS: CONFORM TO THE CALIFORNIA BUILDING CODES (CBC), CURRENT EDITION, AND
<br />ANY OTHER REFERENCED CODES AND STANDARDS. IN CASE OF CONFLICT BETWEEN THE ABOVE AND
<br />THIS SECTION, THE MORE STRINGENT SHALL GOVERN. COMPLY WITH STATE OF CALIFORNIA,
<br />CONSTRUCTION SAFETY ORDERS, LATEST GUIDANCE AND RESOURCES (CAL/OSHA).
<br />E.PROVIDE PEDESTRIAN SAFETY BARRIERS AS REQUIRED TO PROTECT THE PUBLIC AT ALL TIMES, SUCH AS,
<br />CONES AND SAFETY TAPE FOR AREAS UNDER CONSTRUCTION TO ISOLATE FROM PEDESTRIAN ACCESS.
<br />KEEP ALL AREAS OF WORK CLEAN, NEAT AND ORDERLY ON A DAILY BASIS.
<br />3.UTILITIES:
<br />EXCAVATION IN THE VICINITY OF UTILITIES SHALL BE UNDERTAKEN WITH CARE. ACTIVE UTILITIES SHALL BE
<br />PROTECTED BY AND AT EXPENSE OF THE CONTRACTOR. KEEP ANY REQUIRED UTILITY IN OPERATING
<br />CONDITION DURING ENTIRE PERIOD OF WORK. ANY DAMAGE TO UTILITIES WHICH ARE TO REMAIN CAUSED
<br />BY ANY PERSON, VEHICLE, EQUIPMENT, OR TOOL RELATED TO THE EXECUTION OF THE CONTRACT SHALL BE
<br />REPAIRED IMMEDIATELY AT NO EXPENSE TO THE CARRIER OR THE OWNER.
<br />4.UTILITY MARK-OUTS:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR POWER WASHING, SAND BLASTING OR OTHERWISE
<br />REMOVING ALL PAINTED MARKINGS, FLAGS, SURVEY FEATHERS ETC. THAT HAVE BEEN MADE OR PLACED IN
<br />THE PROJECT AREA BY UNDERGROUND SERVICE ALERT, GROUND PENETRATING RADAR COMPAINES, ETC.
<br />SURFACES SHALL BE RETURNED TO CONDITIONS THAT EXISTED PRIOR TO MARKINGS, ETC.
<br />5.DUST AND NOISE ABATEMENT:
<br />THE CONTRACTOR SHALL EXERCISE ALL POSSIBLE PRECAUTIONS TO KEEP NOISE TO A MINIMUM AND TO
<br />KEEP DUST FROM CIRCULATING AND CONTAMINATING ADJACENT BUILDING OPERATIONS AND AREAS.
<br />6.PROTECTION AND SAFETY:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXISTING IMPROVEMENTS, INCLUDING FINISH
<br />(EXTERIOR AND INTERIOR) WITHIN THE EXTENT OF THE WORKING AREA. REPAIR OR REPLACE EXISTING
<br />IMPROVEMENTS DAMAGED DURING CONSTRUCTION WITH MATERIAL OF SAME KIND, QUALITY, COLOR AND
<br />SIZE. MATERIAL OR EQUIPMENT TEMPORARILY REMOVED FOR PROTECTION AND NOT DAMAGED SHALL BE
<br />REINSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION SPECIFICATIONS.
<br />7.SEQUENCE OF WORK:
<br />THE DRAWINGS AND THESE SPECIFICATIONS INDICATE IN GENERAL TERMS THE REQUIREMENTS OF THE
<br />WORK TO BE DONE AND THE MANNER IN WHICH THE WORK IS TO BE DONE. THE CONTRACTOR HOWEVER,
<br />MAY ORGANIZE HIS WORK AND SELECT THE SPECIFIC METHODS OF PROCEDURE HE FEELS ARE SUITABLE
<br />AND CORRECT FOR THE WORK TO BE DONE, CONSISTENT WITH THE RESULTS REQUIRED AND THE SAFETY
<br />OF THE STRUCTURE AND ALL AFFECTED PREMISES AND PERSONS. HE SHALL HOWEVER, BEFORE
<br />COMMENCING WITH ANY SIGNIFICANT PARTS OF THE WORK, MEET WITH THE PROJECT MANAGER AND THE
<br />OWNER AND SHALL INFORM THEM OF HIS METHODS, PROCEDURES AND SEQUENCE OF WORK AND HE SHALL
<br />COMPLY WITH ANY REASONABLE SUGGESTIONS THEY MAY MAKE IN THE INTEREST OF THE CARRIER AND
<br />THE SAFETY OF THE STRUCTURE AND THE SITE.
<br />8.DEMOLITION:
<br />CONCRETE CONSTRUCTION INDICATED TO BE CUT, BROKEN AND REMOVED SHALL BE NEATLY CUT USING
<br />CONCRETE CUTTING SAWS WITH DIAMOND OR ABRASIVE BLADES, DETERMINE EXTENT OF CUT AND DRILL
<br />PILOT HOLES IN CORNERS SUFFICIENTLY LARGE ENOUGH TO PREVENT OVERRUN OF SAW BLADE. SAWCUTS
<br />SHALL BE MADE STRAIGHT, EVEN AND DEEP ENOUGH INTO EVERY ELEMENT BEING CUT TO ASSURE THAT
<br />SUBSEQUENT BREAKING AND REMOVING OF REMAINING SECTION WILL NOT RESULT IN CRACKING, SPALLING
<br />OR CHIPPING OF ANY EXPOSED ADJACENT SURFACE OR EDGE. CUT REINFORCING STEEL SHALL BE
<br />REMOVED WITH GAS CUTTING TORCHES, TAKING CARE NOT TO DAMAGE ADJACENT CONSTRUCTION.
<br />SITE CLEARING / EARTHWORK:
<br />1.WORK INCLUDED:
<br />A.PROTECTION OF EXISTING EARTH BANKS AND SLOPES, INCLUDING TEMPORARY SHORING.
<br />B.CONTROL OF SURFACE AND GROUND WATER.
<br />C.EXCAVATION FOR ALL FOOTINGS, SLABS, AND OTHER BUILDING AND/OR STRUCTURAL ELEMENTS.
<br />D.SAND BACKFILL AND COMPACTION OF SAME.
<br />E.SUBGRADE PREPARATION FOR ON-GRADE CONCRETE.
<br />F.REQUIREMENTS FOR TRENCHING OPERATIONS.
<br />G.CLEAN UP AND DISPOSAL
<br />H.SITE CLEARING
<br />2.RELATED WORK:
<br />A.TESTING AND INSPECTION OF WORK OF THIS SECTION
<br />3.QUALITY ASSURANCE:
<br />A.CODES
<br />(1) CALIFORNIA BUILDING CODE LATEST EDITION.
<br />(2) STATE OF CALIFORNIA CONSTRUCTION SAFETY ORDERS (CAL/OSHA) LATEST GUIDANCE AND
<br />RESOURCES.
<br />B.STANDARDS
<br />(1) AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM). SPECIFICATIONS AS INDICATED BY NUMBER
<br />HEREIN.
<br />C.TESTS AND INSPECTIONS:
<br />(1)COMPACTION METHOD SHALL CONFORM TO ASTM D1557-70 SPECIFIED DENSITIES RELATED
<br />TO MAXIMUM DRY DENSITIES OBTAINED THEREBY.
<br />(2)SOILS TESTING AGENCY SHALL BE NOTIFIED BY CONTRACTOR PRIOR TO COMMENCEMENT
<br />OF EARTHWORK AND SHALL PERFORM AND REPORT THE FOLLOWING PROCEDURES:
<br />a.VISUALLY APPROVE BACKFILL MATERIAL; PERFORM SUITABILITY TESTS IF REQUIRED.
<br />b.SUPERVISE PLACEMENT OF CONTROLLED BACKFILLS, PERFORM FIELD DENSITY TESTS
<br />AS REQUIRED TO VERIFY PROPER COMPACTION DENSITIES.
<br />c.INSPECT AND APPROVE COMPLETED AND PREPARED EXCAVATIONS.
<br />1.SITE VISITATION:
<br />A.IN PREPARING THE BID FOR CONSTRUCTION, THE CONTRACTOR IS ASSUMED TO HAVE VISITED
<br />THE SITE, CAREFULLY EXAMINED THE DRAWINGS AND SPECIFICATIONS AND DETERMINED TO
<br />HIS SATISFACTION THE METHODS OF REMOVAL AND STORAGE OF MATERIALS, THE
<br />SEQUENCING OF HIS OPERATIONS AND THE PROBLEMS ATTENDANT THERETO. NO
<br />ALLOWANCE WILL BE MADE AFTER SUBMITTAL OF THE BID FOR ANY ERROR THROUGH
<br />NEGLIGENCE IN OBSERVING THE SITE CONDITIONS.
<br />5.JOB CONDITIONS:
<br />A.MAINTAIN PROTECTION TO RETAINED EARTH AND TO PROTECT ADJOINING GRADES AND
<br />STRUCTURES FROM CAVING, SLIDING, EROSION OR OTHER DAMAGE PROVIDING SUITABLE
<br />PROTECTION AGAINST BODILY INJURY, COMPLY WITH ALL LOCAL CODES AND REGULATIONS.
<br />ERECT TEMPORARY BARRICADES AS NEEDED FOR SAFETY AND CONSTRUCT TEMPORARY
<br />BERMS, DAMS AND DITCHES AS NEEDED TO PREVENT SLOPE AND BANK EROSION. DO NOT
<br />ALLOW EXPOSED SOILS TO DRY OUT AND SPRINKLE AS DIRECTED OR REQUIRED.
<br />B.KEEP THE WHOLE OF ALL EXCAVATIONS CONTINUOUSLY FREE FROM WATER AND FLUID
<br />BUILD-UP OF ANY KIND.
<br />6.UNDERGROUND PIPES, CONDUITS AND UTILITIES:
<br />A.THE CONTRACTOR SHALL NOTIFY THE PROJECT MANAGER AT LEAST 72 HOURS PRIOR TO
<br />COMMENCING ANY EARTHWORK. THE CONTRACTOR SHALL NOTIFY A UTILITY LOCATING
<br />SERVICE. NO EARTHWORK SHALL BE PERFORMED UNTIL A LOCATING SERVICE IS PRESENT AT
<br />THE SITE AND WORK IS AUTHORIZED.
<br />B.OBSERVE APPLICABLE REGULATIONS IN WORK AFFECTING ALL OTHER UNDERGROUND
<br />UTILITIES. PROTECT ACTIVE UTILITIES FROM DAMAGE AND REMOVE OR RELOCATE ONLY AS
<br />INDICATED OR SPECIFIED. REMOVE AND PLUG OR CAP INACTIVE OR ABANDONED UTILITIES
<br />ENCOUNTERED IN EXCAVATING OR GRADING. IN ABSENCE OF SPECIFIC REQUIREMENTS, PLUG
<br />OR CAP AT LEAST 5 FEET OUTSIDE BUILDING OR ENCLOSURE WALLS.
<br />C.EXCAVATION OR TRENCHING FOR NEW PIPE, CONDUIT OR UTILITY LINES WITHIN FIVE FEET OF
<br />BUILDING LINES AND UNDER EXTERIOR WALKS, SLABS, DRIVES OR PAVEMENT IS SUBJECT TO
<br />PROVISIONS OF THIS SPECIFICATION WITH RESPECT TO PROTECTION FROM MOISTURE,
<br />BACKFILLING AND GRADING.
<br />D.AT ALL LINES CONTAINING LIQUID, CHECK FOR LEAKS AND CERTIFY CONDITION TO THE
<br />CARRIER AND THE OWNER. RUN SUCH LINES AT LEAST 5 FEET OUTSIDE BUILDING OR
<br />ENCLOSURE WALLS WHEREVER POSSIBLE.
<br />7.MATERIALS:
<br />A.ONLY MATERIALS APPROVED BY THE GEOTECHNICAL ENGINEER SHALL BE USED FOR
<br />BACKFILLING OPERATIONS. BACKFILL MATERIALS SHALL CONSIST OF GRAVEL, SAND AND
<br />APPROVED BLENDS OF SAND AND NATURAL MATERIALS.
<br />8.EXCAVATION:
<br />A.EXCAVATE FOR FOOTINGS AND OTHER REQUIREMENTS TO DEPTHS INDICATED ON THE
<br />DRAWINGS. ELEVATIONS AND DEPTHS OF EXCAVATIONS SHOWN ON THE DRAWINGS SHALL
<br />GOVERN AND WILL BE BASIS FOR BIDDING AND EXECUTION OF THE WORK EXCEPT AS
<br />OTHERWISE MAY BE DIRECTED BY THE ARCHITECT. GREATER OR LESS QUANTITIES OF
<br />EXCAVATION REQUIRED BY AUTHORIZED INSTRUCTIONS SHALL BE ADJUSTED IN ACCORDANCE
<br />WITH SITE SPECIFIC CONDITIONS.
<br />B.EXCEPT WHERE EXTRA EXCAVATION IS ORDERED BY THE ARCHITECT, SHOULD EXCAVATIONS
<br />BE MADE TO A GREATER DEPTH OR SIZE THAN INDICATED OR REQUIRED, SUCH ADDITIONAL
<br />DEPTH OR SIZE SHALL BE FILLED WITH CONCRETE AS SPECIFIED ON SHEET A-0.4 AT THE
<br />CONTRACTOR'S EXPENSE.
<br />C.ALL EXCAVATIONS SHALL BE SUFFICIENT SIZE TO PERMIT INSTALLATION AND REMOVAL OF
<br />ANY REQUIRED FORMS AND ALL OTHER REQUIRED WORK.
<br />D.SIDES OF FOOTINGS MAY BE FORMED BY NEAT EXCAVATIONS WHERE BANKS WILL STAND
<br />WITHOUT CAVING AND THE NEAT TRENCHES ARE CUT 1" WIDER ON EACH SIDE THAN THE
<br />FOOTING DIMENSIONS INDICTED ON THE DRAWINGS. IF BANKS CAVE, FORM FOOTINGS AND
<br />WIDEN TRENCHES TO PERMIT FORMING, BRACING AND INSPECTION, MINIMUM 1'-0" EACH SIDE.
<br />E.CONTACT THE GEOTECHNICAL ENGINEER AND THE ARCHITECT FOR INSTRUCTION SHOULD
<br />ANY UNSUITABLE SOIL OR ANY OTHER ADVERSE SUBSURFACE CONDITION BE ENCOUNTERED.
<br />F.MACHINE EXCAVATION MAY BE USED DOWN TO ROUGH ELEVATIONS. PERFORM FINAL
<br />GRADING AND TRIMMING BY HAND METHODS.
<br />G.EXCAVATE TRENCHES TO WIDTHS REQUIRED FOR PROPER LAYING OF PIPE WITH BANKS AS
<br />NEARLY VERTICAL AS PRACTICAL. BRING BOTTOMS OF TRENCHES TO REQUIRED DEPTHS AND
<br />ACCURATELY GRADE TO PROVIDE UNIFORM BEARING ON COMPACTED SAND FILL OR
<br />UNDISTURBED SOIL FOR ENTIRE LENGTH OF EACH SECTION OF PIPE.
<br />9.SUBGRADE PREPARATION FOR CEMENT:
<br />A.PREPARE SUBGRADE FOR CONCRETE SLABS AND FOOTINGS INCLUDING CAISSON & MAT
<br />FOOTINGS BY CUTTING, FILLING AND COMPACTING AS REQUIRED AND SPECIFIED HEREIN AND
<br />BRING TO OPTIMUM MOISTURE CONTENT. FINISH SUBGRADE WITHIN A 3/8" TOLERANCE WHEN
<br />TESTED WITH A 10 FT. STRAIGHTEDGE IN ANY DIRECTION AND LOCATION. COMPACT TO THE
<br />DENSITY SPECIFIED FOR FILL AND MAINTAIN MOISTURE CONTENT UNTIL CONCRETE IS PLACED.
<br />10.BACKFILLING:
<br />A.AFTER CONCRETE HAS BEEN PLACED AND CURED AND ALL WORK HAS BEEN INSPECTED AND
<br />APPROVED, THE EXCAVATIONS SHALL BE BACKFILLED WITH APPROVED BACKFILL MATERIAL
<br />TO INDICATED OR REQUIRED GRADES. ALL RUBBISH AND WOOD SHALL BE REMOVED FROM
<br />THE EXCAVATIONS BEFORE PLACING BACKFILL.
<br />B.PLACE BACKFILL IN 6-INCH LOOSE LAYERS, BRING TO OPTIMUM MOISTURE CONTENT AND
<br />COMPACT TO 90% OF MAXIMUM DENSITY, SLOPING 5% MIN. DOWN AND AWAY FROM BUILDINGS
<br />AND ENCLOSURES.
<br />C.THE AMOUNT OF WATER USED SHALL BE RIGIDLY CONTROLLED TO INSURE OPTIMUM
<br />MOISTURE CONDITIONS FOR THE TYPE OF FINAL MATERIAL USED. EXCESSIVE AMOUNTS OF
<br />WATER CAUSING SATURATION OF EARTH WILL NOT BE PERMITTED. COMPACTION BY FLOODING
<br />OR JETTING IS PROHIBITED.
<br />11.DISPOSAL AND CLEAN UP:
<br />A.BURNING COMBUSTIBLE RUBBISH ON SITE IS PROHIBITED.
<br />B.RUBBISH, DEBRIS AND ROCKS SHALL BE HAULED AWAY FROM THE SITE PROMPTLY AND
<br />LEGALLY DISPOSED OF.
<br />C.EXCESS EARTH RESULTING FROM CUTTING AND EXCAVATION SHALL BE LEGALLY DISPOSED
<br />OF OFF THE SITE.
<br />D.FOR DUST AND NOISE ABATEMENT DURING ENTIRE PERIOD OF CONSTRUCTION AND DURING
<br />LOADING, KEEP WORK AREA AND MATERIAL BEING LOADED SPRINKLED TO REDUCE DUST IN
<br />AIR AND ANNOYANCE TO PREMISES AND NEIGHBORHOOD. EXERCISE ALL RESPONSIBLE
<br />MEANS TO ABATE UNDUE DUST AND NOISE.
<br />E.CLEAN UP SITE, REMOVE ALL DEBRIS DAILY AND LEAVE PREMISES IN BROOM CLEAN AND
<br />ORDERLY CONDITION.
<br />NOTE: "THE CARRIER" REFERENCED IN THESE SPECIFICATION SHEETS A-0.0 THRU A-0.5 SHALL BE "VERIZON"
<br />THE FOLLOWING STANDARD VERIZON SPECIAL REQUIREMENTS SHALL BE A PART OF THESE SPECIFICATIONS AS IF INCLUDED IN THESE CONSTRUCTION DRAWINGS:
<br />A.INSTRUCTIONS TO BIDDERS
<br />B.INVITATION FOR BIDS
<br />C.BID FORM
<br />D.LIST OF SUBCONTRACTORS
<br />E.APPLICATION FOR PAYMENT
<br />F. CHANGE ORDERS
<br />G.SCHEDULE OF VALUES
<br />H.LEIN WAIVERS
<br />I.GENERAL CONDITIONS
<br />J.SUPPLEMENTAL GENERAL CONDITIONS
<br />K.SPECIAL CONDITIONS
<br />L.GPRS STUDY REPORT
<br />M.GEOTECHNICAL (SOILS) INVESTIGATION REPORT
<br />N.STRUCTURAL CALCULATIONS
<br />GENERAL NOTES
<br />&
<br />SPECIFICATIONS
|