Laserfiche WebLink
TELECOMMUNICATIONS PROJECT MANAGEMENT <br />16776 BERNARDO CENTER DRIVE, UNIT 203 <br />SAN DIEGO, CA 92128 <br />15 <br />5 <br />0 <br />5 <br /> <br />S <br />A <br />N <br />D <br /> <br />C <br />A <br />N <br />Y <br />O <br />N <br /> <br />A <br />V <br />E <br />N <br />U <br />E <br />, <br /> <br />B <br />L <br />D <br />G <br /> <br />C <br />. <br />IR <br />V <br />I <br />N <br />E <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />1 <br />8 <br />SHEET TITLE: <br />ISSUE STATUS <br />DATEREV.DESCRIPTION BY <br />FI <br />S <br />H <br />E <br />R <br /> <br />F <br />L <br />O <br />R <br />A <br />L <br />26 <br />7 <br />7 <br /> <br />3 <br />/ <br />4 <br /> <br />N <br />. <br /> <br />M <br />A <br />I <br />N <br />, <br /> <br />U <br />N <br />I <br />T <br /> <br />W <br />C <br />C <br />0 <br />1 <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />5 <br />0 02/28/2024 90% CD REVIEW jd <br />1 03/15/2024 90% CD DRM COMMENTS jd <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />03/29/2024 <br />05/17/2024 <br />06/21/2024 <br />08/01/2024 <br />09/25/2024 <br />05/07/2025 <br />06/04/2025 <br />90% CD DRM COMNTS #2 <br />100% FINAL CD <br />REVISED DIESEL TANK <br />REGULATORY HEIGHT <br />BP SUBMITTAL <br />100% CD BP PLANCHECK <br />STRUCT PLANCHECK <br />jd <br />jd <br />rl <br />jd <br />jd <br />jd <br />JD <br />A-0.1 <br />PROPRIETARY INFORMATION <br />THE INFORMATION CONTAINED IN THIS SET OF DRAWINGS <br />IS PROPRIETARY TO VERIZON WIRELESS <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />I <br />. <br />D <br />. <br /> <br />1 <br />5 <br />8 <br />6 <br />1 <br />0 <br />6 <br />7 <br />Ren. 4-30-27 <br />No. C 11978 <br />LICENSED A RCHITECT <br />STATE OF CALIFORNIA <br />WILLIAM M. BOOTH <br />STATEMENT OF SPECIAL INSPECTIONS <br />STATEMENT OF <br />SPECIAL INSPECTIONS <br />1.STEEL FABRICATION SHALL BE DONE ON THE PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION. CBC 1704.2.5. <br />THE FABRICATOR MUST BE APPROVED BY THE CITY OF SANTA ANA DEVELOPMENT SERVICES DIVISION FOR THE FABRICATION OF MEMBERS AND ASSEMBLIES ON THE PREMISES OF THE FABRICATORS <br />SHOP. A FABRICATOR IS CONSIDERED APPROVED BY THE CITY OF SANTA ANA WHEN IT IS LISTED BY A RECOGNIZED LISTING AGENCY. <br />2.SPECIAL INSPECTIONS SPECIFIED IN CBC, CHAPTER 17 ARE NOT REQUIRED DURING FABRICATION OF BUILDING COMPONENTS WHERE SUCH FABRICATION IS PERFORMED ON THE PREMISES OF AN <br />APPROVED FABRICATOR'S SHOP. <br />3.NON-APPROVED FABRICATOR: FABRICATORS MAY BE PERMITTED TO PERFORM FABRICATION OF COMPONENTS FOR BUILDINGS AND STRUCTURES WITHIN THE PREMISES OF THEIR SHOP PROVIDED, <br />SPECIAL INSPECTIONS AS NOTED ON THE APPROVED PLANS (CONTINUOUS OR PERIODIC) ARE PERFORMED DURING THE FABRICATION PROCESS BY SPECIAL INSPECTOR(S) REGISTERED BY THE CITY. <br />4.FORMS TO COMPLETE: FABRICATORS OF BUILDING COMPONENTS SHALL COMPLETE THE FOLLOWING FORMS: <br />A.ALL NON-APPROVED FABRICATORS SHALL COMPLETE AN 'APPLICATION TO PERFORM OFF-SITE FABRICATION ' AND SUBMIT TO THE CITY FOR APPROVAL PRIOR TO COMMENCING FABRICATION OF <br />ANY COMPONENT. A SEPARATE APPLICATION MUST BE SUBMITTED FOR EACH SEPARATE PROJECT. <br />B.ALL FABRICATORS, AFTER FABRICATION OF COMPONENTS IS COMPLETED, SHALL SUBMIT A 'CERTIFICATE OF COMPLIANCE FOR OFF-SITE FABRICATION' TO THE CITY OF SANTA ANA INSPECTION <br />SERVICES DIVISION PRIOR TO ERECTION OF FABRICATED ITEMS AND ASSEMBLIES. <br />5.ALL FABRICATED COMPONENTS DELIVERED TO THE JOB SITE SHALL BE MARKED OR LABELED TO CLEARLY IDENTIFY THEIR ORIGIN AND WHEN APPROPRIATE, THEIR INTENDED LOCATION IN THE <br />STRUCTURE. <br />6.NO FIELD WELDING SHALL BE PERMITTED WITHOUT APPROVAL OF THE STRUCTURAL ENGINEER UNLESS SPECIFICALLY DETAILED IN THESE PLANS. <br />7.ALL WELDED CONNECTIONS SHALL CONFORM WITH THE LATEST EDITION OF THE AMERICAN WELDING SOCIETY AWS D1.1. <br />8.THE WPS SHOULD BE DEVELOPED BY A COMPETENT WELDING ENGINEER AND AS A MINIMUM, SHALL INCLUDE THE FOLLOWING INFORMATION: <br />9.WELD TABS AND BACK UP BARS SHOULD BE REMOVED FROM THE BEAM BOTTOM FLANGE AND THE ROOT WELD BACK-GOUGED AND TESTED FOR DEFECTS AND THEN REINFORCED WITH A FILLET <br />WELD PER AWS D1.1 REQUIREMENTS. <br />10.ALL WELD ELECTRODES SHALL BE LOW HYDROGEN E70XX UNLESS SPEIFICALLY NOTED OTHERWISE. THE FABRICATOR SHALL ALSO SUBMIT TO THE STRUCTURAL ENGINEER OF RECORD OR THE <br />ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN A COPY OF ELECTRODE MANUFACTURER'S TECHNICAL INFORMATION TO CONFIRM WITH THE WELDING PARAMETERS LISTED IN THE <br />WELDING PROCEDURES SPECIFICATIONS. <br />11.VISUAL INSPECTION OF ALL WELDS SHALL BE COMPLETED PRIOR TO GALVANIZING. <br />12.IF ANY WELD IS IN QUESTION PER VISUAL INSPECTION, IT SHALL BE TESTED IN ACCORDANCE WITH THE QUALITY ASSURANCE INSPECTION REQUIREMENTS OF AISC 360. <br />1.NOTICE TO THE APPLICANT/OWNER/OWNER'S AGENT/ARCHITECT OR ENGINEER OF RECORD: BY USING THESE PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK <br />SPECIFIED HEREIN, YOU AGREE TO COMPLY WITH THE REQUIREMENTS OF CITY OF SANTA ANA FOR SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIAL TESTING AND OFF-SITE <br />FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND, AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES. <br />2.NOTICE TO THE CONTRACTOR/BUILDER/INSTALLER/SUB-CONTRACTOR & OWNER-BUILDER: BY USING THESE PERMITTED CONSTRUCTION DRAWINGS FOR CONSTRUCTION/INSTALLATION OF THE WORK SPECIFIED <br />HEREIN, YOU ACKNOWLEDGE AND ARE AWARE OF, THE REQUIREMENTS CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS. YOU AGREE TO COMPLY WITH THE REQUIREMENTS OF CITY OF SANTA ANA FOR <br />SPECIAL INSPECTIONS, STRUCTURAL OBSERVATIONS, CONSTRUCTION MATERIAL TESTING AND OFF-SITE FABRICATION OF BUILDING COMPONENTS, CONTAINED IN THE STATEMENT OF SPECIAL INSPECTIONS AND, <br />AS REQUIRED BY THE CALIFORNIA CONSTRUCTION CODES. <br />3.THE STRUCTURAL ENGINEER OF RECORD OR THE ARCHITECT RESPONSIBLE FOR THE STRUCTURAL DESIGN SHALL SUBMIT A WRITTEN STATEMENT TO THE FIELD INSPECTION DIVISION STATING THAT THE SITE <br />VISITS HAVE BEEN MADE AND WHETHER OR NOT OBSERVED DEFICIENCIES HAVE BEEN CORRECTED TO CONFORM WITH APPROVED PLANS AND SPECIFICATIONS. <br />4.A CERTIFICATE OF SATISFACTORY COMPLETION OF WORK AND ALL FIELD REPORTS FOR WORK REQUIRING SPECIAL INSPECTION MUST BE COMPLETED AND SUBMITTED TO THE INSPECTOR OF RECORD, THE <br />ARCHITECT OF RECORD, AND THE CARRIER PRIOR TO FINAL APPROVAL FOR OCCUPANCY. <br />5.A PROPERTY OWNER'S FINAL REPORT OF WORK REQUIRING SPECIAL INSPECTION MUST BE COMPLETED BY THE PROPERTY OWNER, PROPERTY OWNER'S AGENT OF RECORD, ARCHITECT OF RECORD, OR <br />ENGINEER OF RECORD AND SUBMITTED TO THE INSPECTION SERVICES DIVISION. <br />6.SPECIAL INSPECTION WILL BE REQUIRED FOR ALL OFF-SITE FABRICATION, WELDING, FOUNDATION OBSERVATIONS AND TESTING PER REPORT AT 90%-95% COMPLETION. SEE SPECIFIC NOTES BELOW AND ON <br />SHEET A-0.2. <br />7.THE SPECIAL INSPECTOR MUST BE CERTIFIED BY THE CITY OF SANTA ANA, DEVELOPMENT SERVICES IN THE CATEGORY OF WORK REQUIRED TO HAVE SPECIAL INSPECTION. <br />8.THE SPECIAL INSPECTIONS IDENTIFIED ON PLANS ARE, IN ADDITION TO, AND NOT A SUBSTITUTE FOR, THOSE INSPECTIONS REQUIRED TO BE PERFORMED BY THE BUILDING INSPECTOR AND SHALL BE CONDUCTED <br />IN COMPLIANCE WITH CALIFORNIA BUILDING CODE SECTION 17. <br />9.THE SPECIAL INSPECTOR(S) SHALL BE EMPLOYED BY THE OWNER OR THE ENGINEER OF RECORD OR THE ARCHITECT OF RECORD ACTING AS AN AGENT OF THE OWNER. <br />10.THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE TO THE APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. <br />11.CONTINUOUS SPECIAL INSPECTION MEANS THAT THE SPECIAL INSPECTOR IS ON THE SITE AT ALL TIMES OBSERVING THE WORK REQUIRING SPECIAL INSPECTION. <br />12.PERIODIC SPECIAL INSPECTION MEANS SOME INSPECTIONS MAY BE MADE ON A PERIODIC BASIS AND SATISFY THE REQUIREMENTS OF CONTINUOUS INSPECTION, PROVIDED THIS PERIODIC SCHEDULED <br />INSPECTION IS PERFORMED AS OUTLINED IN THE PROJECT PLANS AND SPECIFICATIONS (SHEET A-0.1 & A-0.2) AND APPROVED BY THE BUILDING OFFICIAL <br />13.THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE CITY OF SANTA ANA DEVELOPMENT SERVICES, THE ENGINEER OR ARCHITECT OF RECORD, AND ALL OTHER DESIGNATED PERSONS. ALL <br />DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF UNCORRECTED, TO THE ENGINEER OF RECORD, THE ARCHITECT OF RECORD AND TO <br /> THE CITY OF SANTA ANA DEVELOPMENT SERVICES. <br />14.THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE WORK REQUIRING SPECIAL INSPECTION IS IN CONFORMANCE TO THE APPROVED PLANS AND SPECIFICATIONS AND TO <br />THE APPLICABLE WORKMANSHIP PROVISIONS OF THE CALIFORNIA BUILDING CODE. <br />15.CONTINUOUS INSPECTION IS ALWAYS REQUIRED DURING THE PERFORMANCE OF THE WORK UNLESS OTHERWISE SPECIFIED. WHEN SEVERAL ITEMS REQUIRE INSPECTION SIMULTANEOUSLY OR THE GEOGRAPHIC <br />LOCATION OF THE WORK IS SUCH THAT IT CANNOT BE CONTINUOUSLY OBSERVED IN ACCORDANCE WITH THE PROVISIONS OF CBC 1706, A SUFFICIENT NUMBER OF INSPECTORS SHALL BE EMPLOYED TO ASSURE <br />THAT ALL THE WORK IS INSPECTED IN ACCORDANCE WITH PROVISIONS OF THE CURRENT EDITION OF THE CALIFORNIA BUILDING CODE (CBC). <br />16.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE SPECIAL INSPECTOR OR INSPECTION AGENCY AT LEAST ONE WORKING DAY PRIOR TO PERFORMING ANY WORK THAT REQUIRES SPECIAL <br />INSPECTION. <br />17.SPECIALLY INSPECTED WORK THAT IS INSTALLED OR COVERED WITHOUT APPROVAL OF THE APPROPRIATE INSPECTORS IS SUBJECT TO REMOVAL OR EXPOSURE. <br />18.THE CONSTRUCTION MATERIALS TESTING LABORATORY MUST BE APPROVED BY THE CITY OF SANTA ANA, DEVELOPMENT SERVICES, FOR TESTING OF MATERIALS, SYSTEMS, COMPONENTS AND, EQUIPMENT. <br />1.WHENEVER THERE IS A REASONABLE DOUBT AS TO THE STABILITY OR LOAD-BEARING CAPACITY OF A COMPLETED BUILDING, STRUCTURE OR <br />PORTION THEREOF FOR THE EXPECTED LOADS, AN ENGINEERING ASSESSMENT SHALL BE REQUIRED. THE ENGINEERING ASSESSMENT SHALL <br />INVOLVE EITHER A STRUCTURAL ANALYSIS OR AN IN-SITU LOAD TEST, OR BOTH. SEE CBC SECTION 1708.1. <br />2.IN-SITU LOAD TESTS SHALL BE CONDUCTED IN ACCORDANCE WITH SECTION 1708.2.1 OR 1708.2.2. AND SHALL BE SUPERVISED BY A REGISTERED <br />DESIGN PROFESSIONAL. THE TEST SHALL SIMULATE THE APPLICABLE LOADING CONDITIONS SPECIFIED IN CHAPTER 16 AS NECESSARY TO ADDRESS <br />THE CONCERNS REGARDING STRUCTURAL STABILITY OF THE BUILDING, STRUCTURE OR PORTION THEREOF. <br />1.SPECIAL INSPECTIONS OF STRUCTURAL STEEL AND STRUCTURAL STEEL ELEMENTS IN A SEISMIC FORCE-RESISTING SYSTEMS IN BUILDINGS AND <br />STRUCTURES ASSIGNED TO SEISMIC DESIGN CATEGORY B, C, D, E OR F SHALL BE PERFORMED IN ACCORDANCE WITH THE QUALITY ASSURANCE <br />REQUIREMENTS OF AISC 341. CBC 1705.12.1 <br />2.QUALITY ASSURANCE AND QUALITY CONTROL FOR THE CONNECTIONS OF THE SEISMIC FORCE RESISTING SYSTEM SHALL BE PROVIDED PER THE <br />REQUIREMENTS OF FEMA 353 GUIDELINES. <br />I. PROCEDURE IDENTIFICATION <br />II. BASE METAL IDENTIFICATION <br />III. WELDING PROCESS <br />IV. TYPE OF WELD <br />V.POSITION OF WELD <br />VI. FILLER METAL SPECIFICATION <br />VII. FILLER METAL CLASSIFICATION <br />VIII.NUMBER OF PASSES <br />IX.WELDING CURRENT <br />X.WELDING POLARITY <br />XI. PRE-HEAT AND INTERPASS TEMPERATURES <br />XII.WELDING PARAM1ETERS (ELECTRODE <br />DIAMETER, AMPERAGE RANGE, VOLTAGE <br />RANGE, TRAVEL SPEED RANGE, WIRE FEED <br />SPEED RANGE AND ELECTRODE STICKOUT). <br />GENERAL NOTES: <br />STEEL FABRICATION AND WELDING NOTES: <br />STRUCTURAL STABILITY: <br />STRUCTURAL STEEL SEISMIC FORCE - RESISTING SYSTEMS: <br />WORK REQUIRING SPECIAL INSPECTION: <br />THE FOLLOWING SPECIAL INSPECTIONS SHALL BE REQUIRED PER CHAPTER 17 OF THE BUILDING CODE: <br />1.PLACEMENT OF STRUCTURAL CONCRETE IN EXCESS OF 2500 PSI (CONTINUOUS SPECIAL INSPECTION) INCLUDING SAMPLING AND TESTING FOR STRENGTH AND SLUMP: SEE <br />SHEET A-2 & DETAILS: 79/D-7 & 80/D-7. <br />2.OFF-SITE FABRICATION (SHOP WELDING): SEE DETAILS: 27/D-3, 29/D-3, 30/D-3, 31/D-3, 32/D-3, 85/D-8 & 86/D-8. <br />3.EXPANSION ANCHORS INSTALLED IN CONCRETE: SEE DETAILS: 35/D-3, 61/D-6, 63/D-6, 64/D-6, 68/D-6, 70/D-6, 72/D-6, 82/D-7, 85/D-8, 86/D-8, 88/D-8, 96/D-8, 99/D-9, 100/D-9 & 101/D-9. <br />4.EXPANSION ANCHORS INSTALLED IN MASONRY: SEE DETAILS: 29/D-3, 30/D-3, 50/D-5, 53/D-5, 54/D-5, 56/D-5, 57/D-5, 58/D-5, 60/D-5 & 62/D-6. <br />5.ADHESIVE ANCHORS INSTALLED IN MASONRY: SEE DETAILS: 27/D-3, 28/D-3, 31/D-3, 32/D-3 & 97/D-9 <br />6.ADHESIVE ANCHORS INSTALLED IN CONCRETE: SEE DETAIL: 20/D-2 <br />7.ALL MASONRY CONSTRUCTION REQUIRES SPECIAL INSPECTION: f ' m = 1900 PSI, SEE SHEET A-2, DETAILS: 79/D-7 & 80/D-7 AND MASONRY SPECIFICATIONS ON SHEET A-0.4 <br />8.THE PREPARATION OF THE BUILDING PAD INCLUDING SOILS TYPE, DEPTH OF FOUNDATION, COMPACTION, ETC. REQUIRES SPECIAL INSPECTION BY THE GEOTECHNICAL <br />ENGINEER. SEE SHEET A-2, 'FOUNDATION & SITE PREPARATION NOTES' #3 THROUGH #12