My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2100 S Fairview St - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fairview St
>
2100 S Fairview St
>
2100 S Fairview St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:15 AM
Creation date
2/13/2026 5:01:05 AM
Metadata
Fields
Template:
Plan
Permit Number
20184701
101121913
Full Address
2100 S Fairview St
Street Number
2100
Street Direction
S
Street Name
Fairview
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Client - SCE Charge Ready Date - <br />Project -Brixen EVCS Made By - <br />Location -2100 S Fairview ST, Santa Ana, CA 92704 Orange County. Checked By - <br />Proj. No. -Preliminary -1650605 <br />9/18/2024 <br />DSS <br />- <br />80% Review <br />Description -Design calculations for footing pad of switchboard, Transformer, Distribution <br />Panel, EV Charger & Gateway Final - 100% Review <br />1.5 Revision <br />Rev. - 0:80% IFR <br />1.6 Basic Load Cases <br />Following are the load cases considered for the analysis and Design of foundation in RISA. <br />1 DL, self-weight <br />2 FL, operating dead load <br />3 L, live load <br />4 WLX, wind load X-direction <br />5 WLZ, wind load Z-direction <br />6 ELX, operating earthquake X-direction. <br />7 ELZ, operating earthquake Z-direction.
The URL can be used to link to this page
Your browser does not support the video tag.