My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1602 W Brook St & Unit 2 - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Brook St
>
1602 W Brook St
>
1602 W Brook St & Unit 2 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:03:16 AM
Creation date
2/13/2026 5:01:12 AM
Metadata
Fields
Template:
Plan
Permit Number
101120777
101120778
Full Address
1602 W Brook St
1602 W Brook St Unit# 2
Street Number
1602
Street Direction
W
Street Name
Brook
Street Suffix
St
Unit Number
2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SANTA ANA <br />Plannin and Building Agency <br />1602�V Brook St <br />Santa Ana CA 92703 <br />Approved <br />FOR PERMIT ISSUANCE <br />Master ID: <br />Date: <br />Inspection <br />The Soils Engineer shall provide inspection for the site clearing and grading in order to certify that the <br />grading was done in accordance with the approved plans and grading specifications. <br />Seasonal Limitations <br />No fill shall be placed, spread, or rolled during unfavorable weather conditions. When work is <br />interrupted by heavy rains, fill operations shall not resume until the field tests by the Soils Engineer <br />indicate the moisture content and density of the fill are as previously specified. <br />General <br />The recommendations contained in this report are based on the results of field investigation and <br />laboratory testing and represent our best engineering judgment. When prepared in accordance with the <br />recommendations, the site will be suitable and acceptable and safe and adequate for the proposed <br />construction. <br />It should be understood that subsurface conditions can and will vary throughout the site. Before <br />providing bids, contractors shall make thorough explorations and findings. If soil conditions <br />encountered during grading differ substantially from those described in this report, this office should <br />be notified immediately so that appropriate recommendations can be made. This consultant is not <br />responsible for any financial gains or losses accrued by persons/firms or any third party in this report. <br />This report is issued with the understanding that it is the responsibility of the owner, or his/her <br />representative, to ensure that the information and recommendations contained herein are called to the <br />attention of the Project Architect and Engineer and are incorporated into the plans and specifications <br />and that the necessary steps are taken to see that the Contractors and Subcontractors carry out such <br />recommendations. <br />Respectfully submitted, <br />Priority Engineering Group <br />George Bach <br />RCE 11092 / GE 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.