My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 N Spurgeon St Unit A-H & 1322 N French St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Spurgeon St
>
1313 N Spurgeon St Unit# A
>
1313 N Spurgeon St Unit A-H & 1322 N French St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:04:01 AM
Creation date
2/13/2026 5:01:15 AM
Metadata
Fields
Template:
Plan
Permit Number
20185200
20185201
20185202
20185203
20185204
20185205
20185206
20185207
20185208
30148417
30148418
30148419
30148420
30148421
30148422
30148423
30148424
30148425
40140047
40140048
40140049
40140050
40140051
40140052
40140053
40140054
40140055
101122523
101122524
101122525
101122526
101122527
101122528
101122529
101122531
101122532
101122533
101122534
Full Address
1313 N Spurgeon St Unit# A
1313 N Spurgeon St Unit# B
1313 N Spurgeon St Unit# C
1313 N Spurgeon St Unit# D
1313 N Spurgeon St Unit# E
1313 N Spurgeon St Unit# F
1313 N Spurgeon St Unit# G
1313 N Spurgeon St Unit# H
1322 N French St
1313 N Spurgeon St
Street Number
1313
Street Direction
N
Street Name
Spurgeon
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TYPICAL GARAGE CONVERSION ADU LIGHTING PLAN <br />DW 1.THE LIGHTING PLAN IS NOT INTENDED TO REPRESENT A COMPLETE SET OF ELECTRICAL DRAWINGS. EXCEPT <br />WHERE OTHERWISE NOTED, THE LOCATION AND SELECTION OF ANY ELECTRICAL REQUIREMENTS NOT <br />DIRECTLY RELATED TO THE LIGHTING SHALL BE BY OTHERS. <br />2.LOCATION OF FIXTURES ARE SHOWN DIAGRAMMATICALLY. CONTRACTOR TO REFERENCE WRITTEN <br />DIMENSIONS ON LIGHTING OR ARCHITECTURAL DRAWINGS. CONTRACTOR IS TO NOTIFY LIGHTING DESIGNER <br />ABOUT FIELD CONDITION THAT VARY WITH PLANS AND/ OR SPECIFICATIONS PRIOR TO COMMENCING <br />INSTALLATION. <br />3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE STATE AND LOCAL <br />BUILDING CODES. <br />4.THE CONTRACTOR SHALL INSTALL ALL FIXTURES ACCORDING THE MANUFACTURER'S INSTRUCTIONS AND <br />SHALL NOT VOID MANUFACTURES WARRANTY. <br />5.THE CONTRACTOR SHALL PROVIDE ALL NECESSARY HARDWARE, ELECTRICAL CABLE, TIMERS, DRIVERS/ <br />TRANSFORMERS, ETC., AS REQUIRED FOR COMPLETION OF INSTALLATION. <br />6.THE CONTRACTOR SHALL VERIFY VERTICAL AND HORIZONTAL CLEARANCES, CORRECT CEILING TRIM AND <br />THICKNESS, AS WELL AS AIR HANDLING REQUIREMENTS (IF ANY) FOR ALL FIXTURES PRIOR TO ORDERING. <br />7.FOR FIXTURES THAT REQUIRE REMOTE DRIVERS/ TRANSFORMERS, THE CONTRACTOR SHALL DETERMINE <br />LOCATIONS AS REQUIRED FOR EVEN LOAD DISTRIBUTION, SERVICE ACCESS, AND VENTILATION. <br />8.THE CONTRACTOR IS TO FURNISH AND INSTALL ADEQUATE DRAINAGE ADJACENT TO ALL DIRECT BURIAL <br />TRANSFORMERS AND RECESSED INGRADE (INFLOOR) LIGHT FIXTURES. <br />9.MILLWORK SHOP DRAWINGS REQUIRED FOR FINAL APPROVAL OF FIXTURE PLACEMENT BY LIGHTING <br />DESIGNER BEFORE INSTALLATION. <br />10.THE CONTRACTOR SHALL VERIFY THE COMPATIBILITY OF DIMMING AND CONTROL MODULES WITH FIXTURE <br />TYPES PRIOR TO INSTALLATION. <br />11.THE CONTRACTOR SHALL VERIFY FINISH COLOR FOR ALL DEVICES AND FACEPLATES WITH THE ARCHITECT/ <br />INTERIOR DESIGNER. <br />1.ALL PERMANENTLY INSTALLED LUMINARIES SHALL BE HIGH EFFICACY IN ACCORDANCE WITH BUILDING <br />ENERGY EFFICIENCY STANDARDS TABLE 150.0-A. <br />2.LUMINARIES WITH INTEGRAL SOURCES, SUCH AS LED LUMINARIES MUST BE CERTIFIED BY THE ENERGY <br />COMMISSION AS ME MEETING THE JA8 REQUIREMENTS. LUMINARIES THAT HAVE CHANGEABLE LAMPS <br />(SUCH AS SCREW-BASE LUMINARIES) MUST BE INSTALLED WITH LAMPS THAT HAVE CERTIFIED BY THE <br />ENERGY COMMISSION. LUMINARIES AND LAMPS THAT THE ENERGY COMMISSION CERTIFIED MUST BE <br />MARKED WITH JA8-2019 OR JA8-2019-E ON THE PRODUCT. <br />3.ALL RECESSED DOWNIGHT LUMINARIES MUST MEET ALL THE FOLLOWING REQUIREMENTS TO USED: <br />3.1.CONTAIN A LIGHT SOURCE THAT IS JA8-CERTIFIED, NO SCREW BASED LAMPS ALLOWED <br />3.2.BE LISTED FOR ZERO CLEARANCE INSULATION CONTACT (IC). <br />3.3.CERTIFIED AS AIRTIGHT <br />3.4.BE SEALED WITH A GASKET OR CAULK BETWEEN THE LUMINARIES HOUSING AND CEILING <br />3.5.ALLOW DRIVER MAINTENANCE AND REPLACEMENT TO BE READILY ACCESSIBLE TO BUILDING <br />OCCUPANTS FROM BELOW THE CEILING WITHOUT REQUIRING HOLES TO BE CUT IN THE CEILING. <br />4.BATHROOMS, GARAGES, LAUNDRY ROOMS AND UTILITY ROOMS ARE REQUIRED TO HAVE AT LEAST ONE <br />LUMINAIRE IN THE SPACE TO BE CONTROLLED BY AN OCCUPANCY OR VACANCY SENSOR. <br />5.ALL LED LUMINARIES ARE REQUIRED TO BE CONTROLLED BY NEMA SSL-7A COMPLIANT DIMMER UNLESS <br />THEY ARE CONTROLLED BY A VACANCY SENSOR OR AN OCCUPANCY SENSOR. A MULTI-SCENE <br />PROGRAMMABLE CONTROLLER WITH THE APPROPRIATE DIMMER FUNCTIONALITY CAN BE INSTALLED FOR <br />MEETING T24 REQUIREMENTS. <br />6.ALL LIGHTING SHALL BE CONTROLLED SEPARATELY FROM EXHAUST FANS. <br />7.ALL OUTDOOR LIGHTING ATTACHED TO THE BUILDING MUST BE HIGH EFFICACY, AND MUST BE CONTROLLED <br />BY A MANUAL ON AND OFF SWITCH AND ONE OF THE FOLLOWING AUTOMATIC CONTROL TYPES: <br />7.1.PHOTO-CONTROL AND EITHER A MOTION SENSOR OR AN AUTOMATIC CONTROL; OR <br />7.2.ASTRONOMICAL TIME CLOCK CONTROL <br />CALIFORNIA ENERGY CODES NOTES: <br />LIGHTING NOTES <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />· <br />NOTES: <br />RESIDENTIAL SPECIFIC NOTES <br />UTILITY BUILDING TO ADU LIGHTIGN PLAN <br />DW <br />SHEET <br />DATE:09/16/2025 <br />SHEET <br />Revision <br />#REV:Date <br />GA <br />R <br />A <br />G <br />E <br /> <br />C <br />O <br />N <br />V <br />E <br />R <br />S <br />I <br />O <br />N <br /> <br />T <br />O <br /> <br />A <br />D <br />U <br />13 <br />1 <br />3 <br /> <br />N <br />. <br /> <br />S <br />P <br />U <br />R <br />G <br />E <br />O <br />N <br /> <br />S <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br />A <br />- <br />H <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />13 <br />2 <br />2 <br /> <br />F <br />R <br />E <br />N <br />C <br />H <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />ME <br />P <br /> <br />& <br /> <br />E <br />N <br />E <br />R <br />G <br />Y <br /> <br />C <br />O <br />N <br />S <br />U <br />L <br />T <br />I <br />N <br />G <br />(8 <br />1 <br />8 <br />) <br /> <br />2 <br />3 <br />3 <br /> <br />- <br /> <br />1 <br />9 <br />9 <br />6 <br />Mi <br />c <br />h <br />a <br />e <br />l <br />@ <br />e <br />n <br />t <br />h <br />a <br />l <br />p <br />y <br />e <br />n <br />g <br />. <br />c <br />o <br />m <br />EN <br />T <br />H <br />A <br />L <br />P <br />Y <br /> <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />I <br />N <br />G <br /> <br />G <br />R <br />O <br />U <br />P <br />Wo <br />o <br />d <br />l <br />a <br />n <br />d <br /> <br /> <br />H <br />i <br />l <br />l <br />s <br />, <br /> <br /> <br />C <br />A <br /> <br /> <br />9 <br />1 <br />3 <br />6 <br />7 <br /> 6 <br />3 <br />2 <br />0 <br /> <br />T <br />o <br />p <br />a <br />n <br />g <br />a <br /> <br />c <br />a <br />n <br />y <br />o <br />n <br /> <br />b <br />l <br />v <br />d <br />. <br />, <br />S <br />t <br />e <br /> <br />1 <br />6 <br />3 <br />0 <br /> <br /># <br />5 <br />0 <br />1 <br />MEP REV 9/16/25 <br />E3.0 <br />LIGHTING PLAN
The URL can be used to link to this page
Your browser does not support the video tag.