My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 N Spurgeon St Unit A-H & 1322 N French St - Plan
PBA
>
Building
>
ProjectDox
>
S
>
Spurgeon St
>
1313 N Spurgeon St Unit# A
>
1313 N Spurgeon St Unit A-H & 1322 N French St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2026 5:04:01 AM
Creation date
2/13/2026 5:01:15 AM
Metadata
Fields
Template:
Plan
Permit Number
20185200
20185201
20185202
20185203
20185204
20185205
20185206
20185207
20185208
30148417
30148418
30148419
30148420
30148421
30148422
30148423
30148424
30148425
40140047
40140048
40140049
40140050
40140051
40140052
40140053
40140054
40140055
101122523
101122524
101122525
101122526
101122527
101122528
101122529
101122531
101122532
101122533
101122534
Full Address
1313 N Spurgeon St Unit# A
1313 N Spurgeon St Unit# B
1313 N Spurgeon St Unit# C
1313 N Spurgeon St Unit# D
1313 N Spurgeon St Unit# E
1313 N Spurgeon St Unit# F
1313 N Spurgeon St Unit# G
1313 N Spurgeon St Unit# H
1322 N French St
1313 N Spurgeon St
Street Number
1313
Street Direction
N
Street Name
Spurgeon
Street Suffix
St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SHEET <br />DATE:09/16/2025 <br />SHEET <br />Revision <br />#REV:Date <br />GA <br />R <br />A <br />G <br />E <br /> <br />C <br />O <br />N <br />V <br />E <br />R <br />S <br />I <br />O <br />N <br /> <br />T <br />O <br /> <br />A <br />D <br />U <br />13 <br />1 <br />3 <br /> <br />N <br />. <br /> <br />S <br />P <br />U <br />R <br />G <br />E <br />O <br />N <br /> <br />S <br />T <br />, <br /> <br />U <br />N <br />I <br />T <br />A <br />- <br />H <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />13 <br />2 <br />2 <br /> <br />F <br />R <br />E <br />N <br />C <br />H <br /> <br />S <br />T <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />ME <br />P <br /> <br />& <br /> <br />E <br />N <br />E <br />R <br />G <br />Y <br /> <br />C <br />O <br />N <br />S <br />U <br />L <br />T <br />I <br />N <br />G <br />(8 <br />1 <br />8 <br />) <br /> <br />2 <br />3 <br />3 <br /> <br />- <br /> <br />1 <br />9 <br />9 <br />6 <br />Mi <br />c <br />h <br />a <br />e <br />l <br />@ <br />e <br />n <br />t <br />h <br />a <br />l <br />p <br />y <br />e <br />n <br />g <br />. <br />c <br />o <br />m <br />EN <br />T <br />H <br />A <br />L <br />P <br />Y <br /> <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />I <br />N <br />G <br /> <br />G <br />R <br />O <br />U <br />P <br />Wo <br />o <br />d <br />l <br />a <br />n <br />d <br /> <br /> <br />H <br />i <br />l <br />l <br />s <br />, <br /> <br /> <br />C <br />A <br /> <br /> <br />9 <br />1 <br />3 <br />6 <br />7 <br /> 6 <br />3 <br />2 <br />0 <br /> <br />T <br />o <br />p <br />a <br />n <br />g <br />a <br /> <br />c <br />a <br />n <br />y <br />o <br />n <br /> <br />b <br />l <br />v <br />d <br />. <br />, <br />S <br />t <br />e <br /> <br />1 <br />6 <br />3 <br />0 <br /> <br /># <br />5 <br />0 <br />1 <br />MEP REV 9/16/25 <br />M1.0 <br />GENERAL NOTES <br />GENERAL NEW NOTES: <br />1.PROVIDE SEISMIC RESTRAINTS AS NEEDED FOR THE MECHANICAL SYSTEMS IN <br />THE PROJECT BASED ON THE SEISMIC ANALYSIS REQUIRED BY THE <br />SPECIFICATIONS. <br />2.COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER <br />TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK <br />AND PIPING AS TIGHT TO STRUCTURE AS POSSIBLE. COORDINATE WITH OTHER <br />TRADES TO AVOID CONFLICTS. COORDINATE INSTALLATION OF DUCTWORK AND <br />PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. <br />ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE <br />RESPONSIBILITY OF THE CONTRACTOR AT NO EXTRA COST TO THE OWNER. <br />3.PROVIDE TEMPORARY BARRIERS TO CONTAIN DUST AND DEBRIS RESULTING <br />FROM THE PERFORMANCE OF THE WORK TO THE AREA WHERE WORK IS BEING <br />PERFORMED. <br />4.ALL MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE <br />PROVIDED BY DIVISION 23 UNLESS OTHERWISE NOTED. <br />5.NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT <br />APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING <br />LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO <br />FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT <br />FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS <br />REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND <br />EQUIPMENT. <br />6.REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS <br />APPLICABLE TO THE HVAC SYSTEM. <br />7.COORDINATE LOCATION OF ROOF MOUNTED HVAC EQUIPMENT AND ROOF <br />PENETRATIONS WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. <br />8.INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND <br />DELIVERED) DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT <br />AND MOISTURE. REPLACE INSULATION THAT HAS BECOME WET AT ANY TIME <br />DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL <br />ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS <br />FROM CEILING/RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, <br />PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN ANY <br />DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED DURING THE <br />CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO <br />TURNING SYSTEM OVER TO THE OWNER. THE INTERNAL SURFACES AND <br />ASSOCIATED COILS OF ANY HVAC UNITS THAT WERE OPERATED SHALL ALSO BE <br />CLEANED. <br />9.INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS <br />OTHERWISE SHOWN OR NOTED. <br />10.OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING <br />SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS <br />AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF EXCEPT WHERE CONCRETE <br />INSERTS IN CONCRETE SLABS ARE ALLOWED BY THE SPECIFICATIONS. <br />11.COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF <br />EQUIPMENT ACCESS PANELS/DOORS TO ENABLE SERVICE OF EQUIPMENT AND/OR <br />FILTER REPLACEMENT. <br />12.SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE <br />WITH THE CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH <br />FIRE RATED COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS.PROVIDE <br />FIRE DAMPER/FORE SMOKE DAMPER FOR ANY DUCT THAT PENETRATE FIRE <br />RATED WALL TO KEEP THE WALL FORE RATINGS. <br />13.COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, <br />REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND <br />DUCT INSTALLATION REQUIREMENTS. <br />14.ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS <br />REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. <br />15.VERIFY THERMOSTAT EXACT LOCATIONS WITH ARCHITECT PRIOR TO <br />INSTALLATION. INSTALL DEVICES WITH TOP OF DEVICE AT MAXIMUM 48” <br />” <br />” <br />MECHANICAL SYMBOLS <br />THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED. <br />STANDARD MOUNTING HEIGHTS <br />CU <br />1 <br />1 <br />M1 <br />1 <br />M1 <br />USE THE DEFAULT MOUNTING HEIGHTS SHOWN ABOVE UNLESS NOTED OTHERWISE IN THE <br />SPECIFICATIONS OR ELSEWHERE. MOUNTING HEIGHTS LISTED ARE ABOVE FINISHED <br />FLOOR (AFF) OR ABOVE FINISHED GRADE (AFG) TO TOP OF DEVICE. ALL DEVICES SHALL BE <br />INSTALLED IN COMPLIANCE WITH CURRENT ADA AND LOCAL REQUIREMENTS. <br />48" <br />48" <br />ANNOTATION <br />MECHANICAL OR FIRE PROTECTION PLAN NOTE CALLOUT <br />MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR PROVIDED <br />UNO) <br />CONNECTION POINT OF NEW WORK TO EXISTING <br />DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER <br />LOWER NUMBER INDICATES SHEET NUMBER <br />SECTION CUT DESIGNATION <br />ABBREVIATIONS <br />LWB LEAVING WET BULB <br />LWT LEAVING WATER TEMPERATURE <br />LV LOUVER <br />MAU MAKE-UP AIR UNIT <br />MAX MAXIMUM <br />MBH 1000 BTU PER HOUR <br />MD MOTORIZED DAMPER <br />MFR MANUFACTURER <br />MIN MINIMUM <br />N/A NOT APPLICABLE <br />N/C NORMALLY CLOSED <br />N/O NORMALLY OPEN <br />NC NOISE CRITERIA <br />(N) NEW <br />NF NON-FUSED <br />NIC NOT IN CONTRACT <br />OA OUTSIDE AIR <br />PICV PRESSURE INDEPENDENT <br />CONTROL VALVE <br />PROVIDE FURNISH AND INSTALL <br />QTY QUANTITY <br />RA RETURN AIR <br />RC ROOM CRITERIA <br />RD RETURN DUCT <br />REA RELIEF AIR <br />RF RETURN FAN <br />RH RELATIVE HUMIDITY <br />RH ROOF HOOD <br />RPM REVOLUTIONS PER MINUTE <br />RTU ROOFTOP UNIT <br />SA SUPPLY AIR <br />CSD CEILING SUPPLY DIFFUSER <br />CRG CEILING RETURN GRILL <br />WSG WALL SUPPLY GRILL <br />WRG WALL RETURN GRILL <br />WEG WALL EXHAUST GRILL <br />TG TRANSFER GRILL <br />EG EXHAUST GRILL <br />SLD SUPPLY LINER DIFFUSER <br />RG RETURN GRILL <br />SD SMOKE DUCT DETECTOR <br />SD SUPPLY DUCT <br />SF SUPPLY FAN <br />SOW SCOPE OF WORK <br />SP STATIC PRESSURE <br />TBD TO BE DETERMINED <br />TC/C TEMPERATURE CONTROLS <br />CONTRACTOR <br />TCP TEMPERATURE CONTROL PANEL <br />TF TRANSFER FAN <br />TFA TO FLOOR ABOVE <br />TFB TO FLOOR BELOW <br />TT TEMPERATURE TRANSMITTER <br />TYP TYPICAL <br />U/F UNDERFLOOR <br />U/G UNDERGROUND <br />U/S UNDERSLAB <br />UH UNIT HEATER <br />U/C UNDERCUT <br />UTR UP TO ROOF <br />VAV VARIABLE AIR VOLUME <br />VFD VARIABLE FREQUENCY DRIVE <br />VRF VARIABLE REFRIGERANT FLOW <br />VRV VARIABLE REFRIGERANT <br />VOLUME <br />W/WITH <br />W/O WITHOUT <br />WB WET BULB <br />WC WATER COLUMN <br />WPD WATER PRESSURE DROP <br />XP EXPLOSION-PROOF <br />HVAC DUCTWORK AND ACCESSORIES <br />BD <br />TS <br />THERMOSTATS (USER ADJUSTABLE) (TOP OF DEVICE) <br />CONTROLS (TOP OF DEVICE) <br />A/C AIR CONDITIONING <br />ACC AIR COOLED CHILLER <br />ACCU AIR COOLED CONDENSING UNIT <br />AFC ABOVE FINISHED CEILING <br />AFF ABOVE FINISHED FLOOR <br />AFG ABOVE FINISHED GRADE <br />AHJ AUTHORITY HAVING <br />JURISDICTION <br />AHU AIR HANDLING UNIT <br />AP ACCESS PANEL <br />B BOILER <br />BAS BUILDING AUTOMATION SYSTEM <br />BB BACKBONE <br />BD BACKDRAFT DAMPER <br />BFC BELOW FINISHED CEILING <br />BFF BELOW FINISHED FLOOR <br />BFG BELOW FINISHED GRADE <br />BFP BOILER FEED PUMP <br />BOD BOTTOM OF DUCT <br />BOS BOTTOM OF STRUCTURE <br />BTU BRITISH THERMAL UNIT <br />CH CHILLER <br />CFM CUBIC FEET PER MINUTE <br />CP CONDENSATE PUMP <br />CPT CONTROL POWER TRANSFORMER <br />CRAC COMPUTER ROOM AIR <br />CONDITIONING UNIT <br />CRU COMPUTER ROOM UNIT <br />CT COOLING TOWER <br />CV CONTROL VALVE <br />CWP CONDENSER WATER PUMP <br />CU CONDENSING UNIT <br />CHWP CHILLED WATER PUMP <br />DB DECIBELS <br />DBA DECIBELS AVERAGE <br />DDC DIRECT DIGITAL CONTROL <br />DI DIGITAL INPUT <br />DN DOWN <br />DS DUCT SILENCER <br />DX DIRECT EXPANSION <br />DTR DOWN THRU ROOF <br />(E)EXISTING <br />EA EXHAUST AIR <br />EG EXHAUST GRILLE <br />EAT ENTERING AIR TEMPERATURE <br />ED EXHAUST DUCT <br />EDB ENTERING DRY BULB <br />EF EXHAUST FAN <br />EMS ENERGY MANAGEMENT SYSTEM <br />ETR EXISTING TO REMAIN <br />EWB ENTERING WET BULB <br />EWT ENTERING WATER <br />TEMPERATURE <br />FCU FAN COIL UNIT <br />FFA FROM FLOOR ABOVE <br />FFB FROM FLOOR BELOW <br />FF FINISHED FLOOR <br />FSG FLOOR SUPPLY GRILL <br />FRG FLOOR RETURN GRILL <br />FPM FEET PER MINUTE <br />GC GENERAL CONTRACTOR <br />GPM GALLONS PER MINUTE <br />HOA HAND-OFF-AUTOMATIC <br />HTG HEATING <br />HWP HEATING WATER PUMP <br />IN WC INCHES OF WATER COLUMN <br />L LOUVER <br />LAT LEAVING AIR TEMPERATURE <br />LDB LEAVING DRY BULB <br />LP LOW PRESSURE <br />T <br />H <br />VD <br />FS <br />MD <br /># <br />FD <br />CFSD <br />SD <br />CO <br />HS <br />PS <br />CO2 <br />RD <br />SP <br />DP <br />LINEAR SLOT DIFFUSER <br />INSULATED FLEXIBLE DUCT (MAX. 5'-0" LONG) <br />BRANCH DUCT WITH 45° RECTANGLE-ROUND BRANCH FITTING AND <br />MANUAL VOLUME DAMPER <br />ELBOW WITH TURNING VANES <br />BRANCH DUCT WITH BELL-MOUTH FITTING & MANUAL VOLUME <br />CONTROL DAMPER <br />RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP <br />RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN <br />SUPPLY AIR DUCT UP <br />SUPPLY AIR DUCT DOWN <br />EQUIPMENT WITH FLEXIBLE DUCT CONNECTION <br />SAD <br />XXX (CFM OF SUPPLY DIFFUSER OR REGISTER) <br />RG <br />XXX(CFM OF EXHAUST GRILLE) <br />MANUAL VOLUME DAMPER <br />SQUARE TO ROUND TRANSITION <br />DUCT MOUNTED SMOKE DETECTOR (SD=SUPPLY/RD=RETURN) <br />RISER DESIGNATION <br />FIRE DAMPER <br />COMBINATION FIRE SMOKE DAMPER <br />SMOKE DAMPER <br />VOLUME DAMPER <br />MOTORIZED DAMPER <br />BACKDRAFT DAMPER <br />ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. REFER TO <br />DUCTWORK SPECIFICATIONS FOR DUCTWORK INSULATION AND LINER INFORMATION. <br />HVAC CONTROL DEVICES <br />HUMIDISTAT <br />THERMOSTAT <br />CARBON MONOXIDE SENSOR <br />CARBON DIOXIDE SENSOR <br />DIFFERENTIAL PRESSURE SENSOR <br />FLOW SWITCH <br />HUMIDITY SENSOR <br />PULL STATION <br />STATIC PRESSURE <br />TEMPERATURE SENSOR <br />1 <br />THIS PROJECT SHALL COMPLY WITH THE FOLLOWING CODES: <br />·2022 CALIFORNIA BUILDING CODE (CBC) <br />·2022 CALIFORNIA MECHANICAL CODE (CMC) <br />·2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />·2022 CALIFORNIA PLUMBING CODE (CPC) <br />·2022 CALIFORNIA BUILDING ENERGY EFFICIENCY STANDARDS (BEES) <br />·2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN) <br />·ALL APPLICABLE LOCAL AMENDMENTS. <br />·SCOPE OF WORK: <br />·PROVIDE DUCTLESS HEATPUMP MINI SPLIT TO ADU. <br />·EXHAUST FAN VENTILATION FOR BATHROOM. <br />·KITCHEN VENT DUCT. <br />·DRYER VENT DUCT.
The URL can be used to link to this page
Your browser does not support the video tag.